ML20249A868
| ML20249A868 | |
| Person / Time | |
|---|---|
| Site: | 05000134 |
| Issue date: | 06/16/1998 |
| From: | Weiss S NRC (Affiliation Not Assigned) |
| To: | Bobek L WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA |
| Shared Package | |
| ML20249A869 | List: |
| References | |
| 50-134-98-201, NUDOCS 9806190025 | |
| Download: ML20249A868 (2) | |
See also: IR 05000134/1998201
Text
-
_
_
_ _ _ _ - _ _ _ _ - _ _ _
_ _ _ _ _ _ _ _ - _ _
Mr. L. M. Bobek, Direct:r
. Nucirr R;acter Facility
Werc: ster P lytechnic Institute
June 16, 1998
,
- -
Worcester, MA 01609
SUBJECT:
NRC INSPECTION NO. 50-134/98-201
Dear Mr. Bobek:
On April 30,1998, the r4RC completed a safety inspection at the Worcester Polytechnic
Institute Open Pool Training Reactor. The enclosed report represents the results of that
inspection.
No noncompliance or significant issues were identified.
Your cooperation with us is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Seymour H. Weiss, Director
Non-Power Reactors and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
/
License No. R-61
Docket No.
50-134
./
Enclosure:
NRC Inspection Report No. 50-134/98-201
df5y
cc w/ encl:
Prof. T. Boulette, Chairman, Nuclear Engineering Program
Dr. William Vernetson, TRTR
Dr. D. Apelian, Provost
Commonwealth of Massachusetts (2)
DISTRIBUTION: w/enclo'sure
HARD COPY
TBurdick
WEresian
TDragoun
Docket File 50-134
PDoyle
SHolmes
PUBLIC
SWeiss
CBassett
MMendonca
EHylton
PDND r/f
AAdams
TMichaels
PDND:Rik PDNDMPQ
sLA -
PD D:D
.TDragoun -
TMichaels
Ep
on
SWeiss -
f/ /6/98L
k//*/98
h//
98
/[f/98
OFFICIAL RECORD COPY
DOCUMENT NAME: ' G:\\SECY\\DRAGOUN\\WPl98.201
%' 10 RLE CENTEP3 CPV
M6"ic 85t46
a
m
_
_
._
_ __ __ _ _ ___ _ _____-__
_ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _
. _ _ _ _ _ _ _ _ _
. _ _ _ _ _ _ .
. _ _ _
_ _
l
.-
eux
/
g
UNITED STATES
.
"
NUCLEAR REGULATORY COMMISSION
f
WASHINGTON, D.C. 20066 4 001
I
l
% , , , , , ,$
June 16, 1998
Mr. L. M. Bobek, Director
Nuclear Reactor Facility
Worcester Polytechnic institute
Worcester, MA 01609
,
SUBJECT:
NRC INSPECTION NO. 50-134/98-201
Dear Mr. Bobek:
On April 30,1998, the NRC completed a safety inspection at the Worcester Polytechnic
Institute Open Pool Training Reactnr. The enclosed report represents the results of that
inspection.
No noncompliance or significant issues were identified.
Your cooperation with us is appreciated.
Sincerely,
.
A&4
.
Seymour H. Weiss, Director
Non-Power Reactors and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
License No.
R-61
Docket No.
50-134
Enclosure:
NRC Inspection Report No. 50-134/98-201
cc w/ encl: .
i
i
Prof. T. Boulette, Chairman, Nuclear Engineering Program
Dr. William Vernetson, TRTR
Dr. D. Apellan, Provost
'
Commonwealth of Massachusetts (2)
_.
. _ .
-