ML14071A532

From kanterella
Revision as of 07:56, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2014 Susquehanna Steam Electric Station Annual Assessment Meeting Notice, for April 9, 2014
ML14071A532
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/12/2014
From: Fred Bower
Reactor Projects Region 1 Branch 4
To:
DENTEL, GT
References
MN 14-004
Download: ML14071A532 (4)


Text

MN No.14-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 12, 2014 Licensee: PPL Susquehanna, LLC Facilities: Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos: 50-387 and 50-388 Date/ Time: April 9, 2014 6:00 p.m. - 8:00 p.m.

Location: Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with PPL to discuss the NRCs assessment of safety performance at the Susquehanna Steam Electric Station for 2013, as described in the annual assessment letter dated March 4, 2014. PPL will be given the opportunity to respond and present any new or existing programs that are designed to maintain or improve current performance. Following the meeting with PPL, the NRC will have a separate session to respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: M. Scott, Acting Director, Division of Reactor Projects F. Bower, Chief, Division of Reactor Projects, Branch 4 J. Greives, Senior Resident Inspector, Susquehanna T. Daun, Resident Inspector, Susquehanna Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Fred L. Bower, Chief, Projects Branch 4 610-337-5200 E-mail: fred.bower@nrc.gov The NRCs annual assessment letter regarding the Susquehanna Steam Electric Station performance during 2013 can be found in NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML14058A340.

ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs annual assessment process and the safety performance of the Susquehanna Steam Electric Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 3, 2014, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

/RA/

Approved by: _______________________

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects cc w/encl: Distribution via ListServ

3 Agenda NRCs Annual Assessment Meeting Susquehanna Steam Electric Station April 9, 2014 6:00 p.m. - 8:00 p.m.

Susquehanna Energy Information Center 634 Salem Boulevard Berwick, PA 18603 Formal Meeting Introduction Discussion of Susquehanna Steam Electric Station performance in 2013 10 mins Discussion of Susquehanna Steam Electric Stations new or existing programs that are designed to maintain or improve PPLs current 30 mins performance Break 5 mins NRC to address public questions as needed Closing Remarks 5 mins

2 Additional information relative to the NRCs annual assessment process and the safety performance of the Susquehanna Steam Electric Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 3, 2014, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: ____/RA/______________

Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ Distribution: via email:

Executive Director for Operations, OEDO RidsEDOMailCenter Deputy Executive Director for Reactor Programs, OED RidsEDOMailCenter Director, Office of Nuclear Reactor Regulation, NRR RidsNRROD Deputy Director, Office of Nuclear Reactor Regulation, NRR RidsNRROD Director, Div of Inspection & Regional Support, NRR/DIRS RidsNRRDIRS Director, Div of Operating Reactor Licensing, NRR/DORL RidsNRRDORL Asst General Counsel Materials Litigation & Enforcement, OGC RidsOGCMailCenter Distrib w/encl: (via e-mail) A. Turilin, DRP D. Screnci, RI, PAO W. Dean, RA B. Lin, DRP N. Sheehan, RI, PAO D. Lew, DRA J. Greives, DRP, SRI C. ODaniell, ORA, M. Scott, DRP T. Daun, DRP, RI T. Haverkamp, DNMS E. Benner, DRP S. Farrell, DRP, AA L. Pinkham, DRP R. Lorson, DRS E. Quinones, RI OEDO K. Heater, DRS J. Trapp, DRS DRS Branch Chiefs (6) RidsNrrPMSusquehanna Resource F. Bower, DRP N. McNamara, RI, SLO RidsNrrDorlLpl1-2 Resource S. Barber, DRP D. Tifft, RI, SLO PMNS

DOC NAME: G:\DRP\BRANCH4\COMMUNICATIONS\PUBLIC MEETINGS\2013 SSES\SSES 2013 AAM MEETING NOTICE.DOCX ADAMS Accession No.: ML14071A532 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/GSB FBower/FLB DATE 03/12/14 03/12/14 Official Record Copy