Annual Assessment Letter for Three Mile Island Station, Unit 1 (Report 05000289/2018006)
ML19064B356
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/04/2019
From: Matt Young
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018006
Download: ML19064B356 (6)


Text

March 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000 289/2018006)

Dear Mr. Hanson ,

The NRC has completed its end-of-cycle performance assessment of Three Mile Island Station, Unit 1, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 , through December 31, 201 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Three Mile Island Station, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program,"

because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Three Mile Island Station, Unit The enclosed inspection plan lists the inspections scheduled through December 31, 202 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections").

Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 202 In a letter (ML17171A151) dated June 20, 201 7, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(1)(i), you notified the NRC of your intent to permanently cease power operations at Three Mile Island Station, Unit 1 no later than September 30, 201 Therefore, the inspection schedule is tentative and may be revise Once you formally notify the NRC in accordance with 10 CFR 50.82(a)(1)(ii) that Three Mile Island Station, Unit 1 is permanently shutdown and that all the nuclear fuel has been removed from the reactor vessel, then Three Mile Island Station, Unit 1 will transition from NRC IMC 0305, "Operating Reactor Assessment Program," and IMC 2515, "Light-Water Reactor Inspection Program - Operations Phase," to IMC 2561, "Decommissioning Power Reactor Inspection Program." The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change B. Hanson 2 Finally, the Reactor Oversight Process and Inspection Program provides inherent flexibility to permit inspection sampling adjustments using IMC 2515, Appendix G, "Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase."

These adjustments are be made in order to better inform our assessment of performance during this unique period of operations prior to permanent plant shutdown

. In addition, the NRC will be implementing quarterly assessment reviews, consistent with the guidance contained in IMC 0305, "Operating Reactor Assessment Program," in order to more closely monitor and review overall plant activities to assure that there are no issues emerging that might indicate a decline in focus on the safe operation of the facilit In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC

's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this lette

Sincerely,

/RA/ Matt hew Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No. 50-289 License No

. DPR-50 Enclosure:

Three Mile Island Inspection Plan

ML19064B356 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/26/19 2/27/19 Three Mile Island

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

RAD SAFETY 01,02,03,04

1 02/11/2019

02/15/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

02/11/2019

02/15/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

ACCESS AUTH & CONTROL, FITNESS FOR DUTY

1 02/25/2019

03/01/2019

IP 71130.01

000733 Access Authorization

02/25/2019

03/01/2019

IP 71130.02

000734 Access Control

02/25/2019

03/01/2019

IP 71130.06

000738 Protection of Safeguards Information

02/25/2019

03/01/2019

IP 71130.08

000740 Fitness For Duty Program

02/25/2019

03/01/2019

IP 71151 001338 Performance Indicator Verification

TMI REQUAL INSP WITH P/F RESULTS

1 03/17/2019

03/22/2019

IP 71111.11A

000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

03/17/2019

03/22/2019

IP 71111.11B

000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Radwaste

1 03/18/2019

03/22/2019

IP 71124.08

000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

EP EXERCISE INSPECTION

1 05/06/2019

05/10/2019

IP 71114.01

000716 Exercise Evaluation

05/06/2019

05/10/2019

IP 71151 001397 Performance Indicator Verification

TMI INITIAL OL EXAM

1 05/12/2019

05/17/2019

OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

06/09/2019

06/14/2019

EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RAD SAFETY REMP

1 06/10/2019

06/14/2019

IP 71124.07

000731 Radiological Environmental Monitoring Program

06/10/2019

06/14/2019

IP 71151 000746 Performance Indicator Verification

Triennial Heat Sink

1 06/16/2019

06/22/2019

IP 71111.07T

000700 Heat Sink Performance -Triennial

2/22/2019 9:42:30 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Three Mile Island

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

50.59 PROCESS

1 07/14/2019

07/20/2019

IP 71111.17T

000709 Evaluations of Changes, Tests, and Experiments

RAD SAFETY OUT 01,02,03,04

1 09/30/2019

10/04/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

09/30/2019

10/04/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

09/30/2019

10/04/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

09/30/2019

10/04/2019

IP 71124.04

000728 Occupational Dose Assessment

Inservice Inspection

1 10/06/2019

10/19/2019

IP 71111.08P

000702 Inservice Inspection Activities (PWR)

EQ PROGRAM

1 11/04/2019

11/08/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

11/18/2019

11/22/2019

IP 71111.21N

000714 Design Bases Assurance Inspection (Programs)

RAD SAFETY 01,02,03,04

1 11/18/2019

11/22/2019

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

11/18/2019

11/22/2019

IP 71124.02

000726 Occupational ALARA Planning and Controls

11/18/2019

11/22/2019

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

11/18/2019

11/22/2019

IP 71124.04

000728 Occupational Dose Assessment

11/18/2019

11/22/2019

IP 71151 000746 Performance Indicator Verification

Rad Safety Insp

1 01/06/2020

01/10/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

01/06/2020

01/10/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

01/06/2020

01/10/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

01/06/2020

01/10/2020

IP 71124.04

000728 Occupational Dose Assessment

PI&R Biennial Team Inspection

1 01/20/2020

01/24/2020

IP 71152B 000747 Problem Identification and Resolution

02/10/2020

02/14/2020

IP 71152B 000747 Problem Identification and Resolution

THREE MILE ISLAND EP PROGRAM INSPECTION

1 03/09/2020

03/13/2020

IP 71114.02

000717 Alert and Notification System Testing

03/09/2020

03/13/2020

IP 71114.03

000718 Emergency Response Organization Staffing and Augmentation System

2/22/2019 9:42:30 AM

Page

of

This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report

Three Mile Island

01/01/2019 - 12/31/2020

Unit Start End Activity CAC Title Staff Count

THREE MILE ISLAND EP PROGRAM INSPECTION

1 03/09/2020

03/13/2020

IP 71114.05

000720 Maintenance of Emergency Preparedness

03/09/2020

03/13/2020

IP 71151 001397 Performance Indicator Verification

Rad Safety RETS

1 03/23/2020

03/27/2020

IP 71124.06

000730 Radioactive Gaseous and Liquid Effluent Treatment

03/23/2020

03/27/2020

IP 71151 000746 Performance Indicator Verification

TRIENNIAL FIRE PROTECTION

1 05/04/2020

05/08/2020

IP 71111.05T

000696 Fire Protection (Triennial)

05/18/2020

05/22/2020

IP 71111.05T

000696 Fire Protection (Triennial)

Material Control and Accountability

1 06/01/2020

06/05/2020

IP 71130.11

000742 Material Control and Accounting (MC&A)

Rad Safety Rad Insts

1 07/06/2020

07/10/2020

IP 71124.05

000729 Radiation Monitoring Instrumentation

CYBER FULL IMP

1 07/20/2020

07/24/2020

IP 71130.10P

000741 Cyber Security

08/03/2020

08/07/2020

IP 71130.10P

000741 Cyber Security

Rad Safety Insp

1 12/14/2020

12/18/2020

IP 71124.01

000725 Radiological Hazard Assessment and Exposure Controls

12/14/2020

12/18/2020

IP 71124.02

000726 Occupational ALARA Planning and Controls

12/14/2020

12/18/2020

IP 71124.03

000727 In-Plant Airborne Radioactivity Control and Mitigation

12/14/2020

12/18/2020

IP 71124.04

000728 Occupational Dose Assessment

12/14/2020

12/18/2020

IP 71151 000746 Performance Indicator Verification

2/22/2019 9:42:30 AM

Page