Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22307A0192022-11-0101 November 2022 EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191 ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML21126A1722021-04-29029 April 2021 Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20304A1612020-10-14014 October 2020 Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21 M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20097B6912020-03-20020 March 2020 Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 ML20042E2522020-01-31031 January 2020 EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment ML20049A0742020-01-31031 January 2020 Fairbanks Morse Part 21 Re Fm Notification Report Serial Number 20-01 Fairbanks Morse ML20029D1612020-01-21021 January 2020 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19199A0342019-07-0505 July 2019 Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19072A0632019-03-0606 March 2019 10 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18289A4552018-10-10010 October 2018 Abb, Inc., 10 CFR Part 21 Notification of Deviation, Dry Type Transformer Serial#: 24-26458 ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML18211A3022018-07-25025 July 2018 Interim Notification Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11 KLVS146 ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17206A0392017-07-13013 July 2017 Part 21 - Hex Cap Screws Produced with Pre-existing Cracks ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17101A3662017-04-0606 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17096A2692017-04-0303 April 2017 Part 21 Notification - Failure of Vishay Diodes ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16328A3102016-11-18018 November 2016 Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay 2023-03-07
[Table view] |
Text
LAKE ENGINEERING CO. P.O. Box296 1 O Austin Avenue Greenville, RI 02828 Tel: 401-949-4733 Fax: 401-949-0220 September 24, 2018 U S Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555-0001 Subject Second Interim Notification per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 This letter is a follow up to our initial notification letter dated July 25, 2018 pertaining to the above subject. The following table reflects the status of US nuclear plants and other facilities to which SF1154 fluid from Batch 11 KLVS146 was shipped by Lake Engineering Company {LEC) in accordance with purchase orders which specified that the requirements of 1 O CFR Part 21 are applicable.
Duane Arnold Fluid used in some installed snubbers No substantial safety hazards Millstone Status to be determined by facility Evaluation ongoing Three Mile Island Status to be determined by facility Evaluation ongoing Clinton Status to be determined by facility Evaluation ongoing Wyle Laboratories 1 Status to be determined by facility Evaluation ongoing Peach Bottom Status to be determined by facility Evaluation ongoing 1 Currently National Testing Service {NTS) Lake Engineering Company shall continue in its evaluation to determine whether the subject anomalies represent defects which could create a substantial safety hazard. Determination in this regard shall continue to involve interaction between Lake Engineering Company and the facilities listed above. Our goal is to complete our evaluation by December 31, 2018 at which time a determination will have been made as to whether a substantial safety hazard exists. If additional time is required for the above determination, an 'interim report shall be submitted that shall include an updated completion date.
U S Nuclear Regulatory Commission Second Interim Notification per 10 CFR Part 21 Degraded SnubberSF1154 Hydraulic Fluid Batch No. 11KLVS146 September 24, 2018 Page2 If there are any questions or if additional information is required, please contact the writer by mail or by phone using the contact information provided above or by email at dbrown@lakeengineeringri.com.
DPB/d/let092418.nrc cc: P. Guay -QA Mgr. Very truly yours, LAKE ENGINEERING COMPANY D. P. Brown, P.E. President