MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0742020-01-31031 January 2020 Fairbanks Morse Part 21 Re Fm Notification Report Serial Number 20-01 Fairbanks Morse ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19101A0972019-04-0404 April 2019 Weir Valves & Controls USA, Inc. Part 21 Written Notification - Event Number: 53973 - 24 Class 150 Globe Alve for RHRSW HX Isolation MOV, E1150F068B at Detroit Edison - Fermi, Unit 2, Experienced Two Stem Failures ML19087A2512019-03-11011 March 2019 Weir Valves & Controls USA, Inc. - 10 CFR Part 21 Report: 24 Class 150 Globe Failed to Fully Open Due to the Failure of the Anti-Rotation Key ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17206A0392017-07-13013 July 2017 Part 21 - Hex Cap Screws Produced with Pre-existing Cracks ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17114A0692017-04-19019 April 2017 Part 21 Report - Control Rod Drive Mechanisms Contaminated with Chlorides ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17039A5692017-02-0303 February 2017 Final Part 21 Report on Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16154A2062016-05-18018 May 2016 Part 21 Report - Defect in a Signal Converter Transformer ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML16076A2622016-03-14014 March 2016 Anvil Engineered Pipe Supports - Part 21 Regarding Hydraulic Snubber Seal Material Deviation Interim Report, Per Peach Bottom ML16004A0302015-12-23023 December 2015 MPR Associates, Inc. - Part 21 Report, MPR Emergency Diesel Engine Timing Module Failure, Per E.I. Hatch, Unit 2 ML16020A4762015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15357A0422015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15187A1722015-06-30030 June 2015 Interim Part 21 Report - Potential Test Induced Defect in 0867F Main Steam Safety Relief Valves ML15134A0172015-05-0101 May 2015 Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15077A4222015-03-17017 March 2015 Curtiss Wright Flow Control Co., Interim Part 21 Report - Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves ML15049A4562015-02-11011 February 2015 Weir Valves and Controls, USA - Part 21 Report Regarding Tricentric Triple Offset Valve ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML15014A0612015-01-0808 January 2015 Notification of Potential Part 21 Re Failure of Sbm Type Switches ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels 2024-09-06
[Table view] |
Text
2020/01/31 15:28:08 1 /5 Address Line 1 Phone: (555) 555-5555 Address Line 2 Fax: (555) 555-5556 City State Zip Web: www.companyweb.com
- Fax Cover Page To: Fax Number: 913018165151 Company: Date: 1/31/20 From: Fax Number:
Company: No. of pages: 5 (including cover page)
Subject:
Message Details:
2020/01/31 15:28:08 2 /5 FM Notification Report Serial Number 20-01 Fairbanks Morse 10CFR 21.21 {d)(3}{ii) Notification Submitted j_anuary 31; 2020 (i) Name and address of the individual or individuals* informing the Commission.
Mr. Martin T. Kurr Quality Assurance Manager Fairbanks Morse
Beloit, WI 53511 USA (H) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Facility:
- 1) Emergency Diesel Generator Set for Peach Bottom plant at the Exelon storage facility fn Memphis, TN, USA.
1790 Dock Street Memphis, TN 38106
- 2) Opposed Piston Engine at the Pooled Equipment Inventory Company
- owned by Southern Nuc*1ear / Georgia Power - Plant Hatch *spare
- 1701 Dunn Ave., Building 925C Memphis, TN 38106 Ba.sic component which fails to comply or contains a defect:
Opposed piston dies*e1 engine camshaft thrust lock washer and lock nut assembly.
FM fonn BFS548 Pagel of 4
2020/01/3115:28:08 3 /5 FAIRSANKS MOHSE FM Notification Report Serial Number 20-01 Fairbanks Morse 10CFR 21.21 (d)(3)(ii) Notification Submitted January 31 1 2020
..:** ;****~**:. '*.
...... *, .-*** .....:,.*.:.:..i
-:" --~), _*.. ** ,,,*'
f .:* ,:, -~
H Ip q,J!i
- I .il II UIII
- '?:nun,.,~ , ............. :.
t** . / . . J (iii) Identification of the firm constru~ting the facility or supplying the basic component which fails* to comply or contains a defect.
Fairbanks Morse 701 White Avenue Beloit, WI 5351'1 USA FM fom1 .BF5548 Page2 of 4
2020/01/3115:28:08 4 /5 FAJRBANKS MORSE FM Notification Report Serial Number 20-01 Fairbanks Morse 10CFR 21.21' (d)(3)(ii) Notification Submitted January 31 1 2020 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be cr~ated _by such defect or failure to comply.
Nature of defect; Unknown tightness of cam thrust lock nut assembly.
Safety hazard which could be created by such defect:.
. FM assembled and completed a factory acceptance test on a 1000. rpm new opposed piston diesel. engine generator set. Upon post-test '
inspection it was discovered that the lock nut.and lock washer had fallen off of the camshaft The failure did not prevent the. engine from st_arting, accelerating to rated speed as well as accepting and sustaining rated load. The failure does not result in an immediate engine shutdown or load rejection. The timing chain restrains the cam shaft adequately for the engine to perform its emergency funct"ion. However, it cannot be conclud~d that the engine would continue* to operate for the entire durl;ition of its safety function. Out of an abundance of caution, this Part 21 notificati.on is being issued for subject engines with less than 98" hours of operation since the camshaft lock nut assembly was tightened, to This Part 21 notification is being applied only engines with. less then 98 operating hours since the cam lock nut assembly was tightened for the following two reasons:
- There are no known*occ1,1rences of cam *1ock.nut as.sembly failures on any 900 rpm FM Opposed Piston engines. All FM OP engines in service .as emergency diesel generators in the United States are 900 rpm.
- A laboratory analysis of the failed components. conclusively shows thisJailure is an infant mortality. In the event the earn lock nut is loose, the lock washer will fail very quickly upon engine ope.ration.
FM form Bf 5548 Pftge 3 of 4
2020/01/3115:28:08 5 /5 FAHRSANKS* fi,10RSE FM Notification Report Serial Number 20-01 Fairbanks Morse 10CFR 21.21 (d)(3)(ii) Notification Submitted January '31., 2020 (v) The date on which the information of such defect or failure to comply was obtained.
January 30, 2029 (vi) In the case of a basic component which conta.ins a defect or fails to comply, the number*and location of all such components in use at, supplied for, or being supplied for one or more facUities or activities subJect to th.e regulations in this part.
One FM Oppo.sed Piston engine at each of'the.se two facilities:
- 1) Emergency Diesel Generator .Set for Peach Bottom plant i;;lt the Exelon storage facility in Memphis, TN, USA
- 1790 Dock Street Memphis, TN 38106
- 2) Opposed Piston Engine at the. Pooled Equfpment Inventory Company owned by Southern Nuclear I Georgia Power - *Plant Hatch spare*
- 1701 Dunn Ave., Building 925C.
Memphis, TN 38106 (vii) The* corrective action which has* been, is being, or will be .taken;*
the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
- FM has defined the appropriate tighteni.ng value to the cam lock nut assembly in .Service Information Letter SIL.-40 and has* provid.ed this guidance to an licensees that possess FM OP engines. FM has updated all internal *engineerinig specifications arid manufacturing instructions to include the newly specified tightening requirements. *There are no 10 GFR 50 Appendix B t=M OP engines being newly constructed.
(viii) Any advice related to the defect or failure to comply about the facility, activity, pr basic component that has been, is being, or will be given tq purchas$rs or licensees.
- Service Information Letter Slla.40 has been provided to all affected p.arties.
FM fonn. Bf5548