ML13267A322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on RacksEquipment
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Project:
CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 586.00 ft, 24 Manufacturer/Model:
AB2, 586.00 ft, 24Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
YesSupported off the wall3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes Supported off the wall 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-501 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jjJ N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-CLI-1 14Equipment Class: (18) Instruments on RacksEquipment
C-501 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jjJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-1 14 Equipment Class: (18) Instruments on Racks Equipment


==
==
Description:==
Description:==


CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Tape -ribbon wrapped around it Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-502 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on Racks Equipment
CommentsTape -ribbon wrapped around itEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-502 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR P9180889C-503 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3Equipment Class: (14) Distribution PanelsEquipment
CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR P9180889 C-503 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels Equipment


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Project:
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
AB2, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 2-5540 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes Could only see anchorage of angle to unistrut -Cannot open panel to see how it is attached to angle (whole face plate needs to be unscrewed to get in)3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Angle bolted to unistrut, part of panel welded to embedded plate 5. Is the anchorage configuration consistent with plant documentation?
DWG 2-5540 REV52. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YesCould only see anchorage of angle to unistrut  
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
-Cannot open panel tosee how it is attached to angle (whole face plate needs to beunscrewed to get in)3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
C-504 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels Equipment
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Angle bolted to unistrut, part of panel welded to embedded plate5. Is the anchorage configuration consistent with plant documentation?
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-504 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-CRID-3Equipment Class: (14) Distribution PanelsEquipment


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -Ceiling tiles OK per DWG 12-40 70 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -Ceiling tiles OK per DWG 12-40 709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-505 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels 120VAC CONTROL ROOM II P9181091 C-506 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRII Equipment Class: (14) Distribution Panels ioment Descriotion:
CommentsEvaluated by: -George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-505 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3Equipment Class: (14) Distribution Panels120VAC CONTROL ROOM IIP9181091C-506 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRIIEquipment Class: (14) Distribution Panelsioment Descriotion:
120VAC CONTROL RO D-3 OM INSTRUMENT DISTRIBUTION C-507 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  
120VAC CONTROL ROD-3OM INSTRUMENT DISTRIBUTION C-507 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-CRID-4-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMProject:
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 202 Manufacturer/Model:
AB2, 609.00 ft, 202Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Not Applicable Yes C-508 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
Not Applicable YesC-508 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-CRID-4-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-509 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  
CommentsEvaluated by: G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-509 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LY- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMF'ýVl IUMAC-510 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM F'ýVl IUMA C-510 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEMC-511 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM C-511 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLProject:
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
AB2, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?Spalled concrete on 2 front left bolts is OK by SEWS documents andANCHOR evaluation does not credit those 2 bolts.5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Spalled concrete on 2 front left bolts is OK by SEWS documents and ANCHOR evaluation does not credit those 2 bolts.5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-512 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
C-512 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesROD HUNG light can swing into panel (separate box up on top rightcomer -beige) but would not be damaging8. Are overhead equipment, distribution  
Yes ROD HUNG light can swing into panel (separate box up on top right comer -beige) but would not be damaging 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-513 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-DGAB (20) Instrumentation and Control Panels and Cabinets'Y DIE:1(1=x1=ATnD Cnh 110 (AR Q (r)NITPCnI"I,4U40I F C-514 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: -Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets rM. .I A ' r-lK'rI 'EI:.IIED AT"rfB ffArI 4C '1 AD ITDf'% I T LJIrIOFL L P9140482"-14U4t5, C-515 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets ,Y DIESEL FU14U400 C-516 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-513 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-DGAB(20) Instrumentation and Control Panels and Cabinets'Y DIE:1(1=x1=ATnD Cnh110 (AR Q (r)NITPCnI "I,4U40IFC-514 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: -Yj N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsrM. .I A ' r-lK'rI 'EI:.IIED AT"rfB ffArI 4C '1 AD ITDf'% IT LJIrIOFL LP9140482"-14U4t5, C-515 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and Cabinets,Y DIESELFU14U400C-516 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLP9130471C-517 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and Cabinets=RGENCY DIE:1 f'-C:K1C:DA-MD r)hAr-: Irfl-AD 1-nK1-rDn1 I-.'Ll'IAM Ila /P%C-518 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FJ N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGABEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130471 C-517 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets=RGENCY DIE:1 f'-C:K1C:DA-MD r)hAr-: Irfl-AD 1-nK1-rDn1 I-.'Ll'IAM Ila /P%C-518 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROLC-519 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LII] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters Equipment  
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-519 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LII] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTERProject:
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
AB2, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 2-DGAB-INV REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
Discoloration of back right anchor bolt -very minor rust 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
SQUG 2-DGAB-INV REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Discoloration of back right anchor bolt -very minor rust4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-520 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters Equipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-520 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYj] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-DGAB-INV Equipment Class: (16) Inverters Equipment  


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTERInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12_Neda Stoeva 10/18/12 Photos C-521 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) In 2-DGAB-INV ierters'Y DIE FU1 U440 C-522 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV EauiDment Class: (16) Inverters nment Descrintion:
CommentsEvaluated by: George G Thomas Date: 10/18/12_Neda Stoeva 10/18/12PhotosC-521 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (16) In2-DGAB-INV ierters'Y DIEFU1 U440C-522 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV EauiDment Class: (16) Inverters nment Descrintion:
IENCY DIESEL GENERATOR OME-1 P9130449 C-523 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters ICY DIE.Iw% -"-u l Iali I C-524 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves EauiDment DescriDtion:
IENCY DIESEL GENERATOR OME-1P9130449C-523 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters ICY DIE.Iw% -"-u l Iali IC-524 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-ECR-23Equipment Class: (7) Fluid-Operated ValvesEauiDment DescriDtion:
CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3Project:
AB2, 612.00 ft, 12 Manufacturer/Model:
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
AB2, 612.00 ft, 12Manufacturer/Model:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Additional space is provided at the end of this checklist for documenting other comments.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
: 4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable Not Applicable
Not Applicable Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-525 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: T NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-ECR-23Equipment Class: (7) Fluid-Operated ValvesEquipment
Yes C-525 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves Equipment


==
==
Description:==
Description:==


CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-526 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves:NT LC C-527 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y WJ U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-526 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23Equipment Class: (7) Fluid-Operated Valves:NT LCC-527 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y WJ USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELProject:
ESSENTIAL SERVICE WATER CONTROL PANEL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 633.00 ft, 123 Manufacturer/Model:
AB2, 633.00 ft, 123Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 2-CCW AND 2-ESW REV3 A 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Welded to embedded plate 5. Is the anchorage configuration consistent with plant documentation?
SQUG 2-CCW AND 2-ESW REV3 A2. Is the anchorage free of bent, broken, missing or loose hardware?
No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
A 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Welded to embedded plate5. Is the anchorage configuration consistent with plant documentation?
C-528 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
No(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
A6. Based on the above anchorage evaluations, is the anchorage free of Nopotentially adverse seismic conditions?
C-528 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N] USeismic Walkdown Checklist (SWC)Equipment ID No.:2-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
ESSENTIAL SERVICE WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles -Ceiling tiles OK per DWG 12-40 70 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Check ceiling tiles -Ceiling tiles OK per DWG 12-40 709. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-529 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets ipment
CommentsEvaluated by: -- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosC-529 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N-] USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESWEquipment Class: (20) Instrumentation and Control Panels and Cabinetsipment


== Description:==
== Description:==


ESSENTIAL SERVICE WATER CONTROL PANELC-530 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y I USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESWEquipment Class: (20) Instrumentation and Control Panels and Cabinetspm nt
ESSENTIAL SERVICE WATER CONTROL PANEL C-530 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y I U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets pm nt


== Description:==
== Description:==


ESSENTIAL SERVICE WATER CONTROL PANELMlJId1 uIC-531 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y lN USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESWEquipment Class: (20) Instrumentation and Control Panels and CabinetsEquipment
ESSENTIAL SERVICE WATER CONTROL PANEL MlJId1 uI C-531 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y lN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
==
Description:==
Description:==


ESSENTIAL SERVICE WATER CONTROL PANELC-532 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1. 09/12/13Status: F-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-AEquipment Class: (1) Motor Control CentersEquipment
ESSENTIAL SERVICE WATER CONTROL PANEL C-532 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AProject:
600VAC MOTOR CONTROL CENTER EZC-A Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 613.00 ft, 205 Manufacturer/Model:
AB2, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-533 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FT] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-AEquipment Class: (1) Motor Control CentersEquipment
Yes C-533 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-534 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-534 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-AEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AP9170775C-535 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-AEquipment Class: (1) Motor Control CentersIPrm dnmtfnt -lerin+in gA1A\IA('
600VAC MOTOR CONTROL CENTER EZC-A P9170775 C-535 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers IPrm dnmtfnt -lerin+in gA1A\IA('
hAC)TC'"P "nKITPr(I (KIT:: P FP7Tl: AC-536 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Eauioment Descriotion:
hAC)TC'"P "nKITPr(I (KIT:: P FP7Tl: A C-536 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:
2-EZC-A(1) Motor Control CentersR CONTROLIl''I (Uff4P9170785C-537 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-1 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-AEquipment Class: (1) Motor Control CentersEquipment
2-EZC-A (1) Motor Control Centers R CONTROL Il''I (Uff4 P9170785 C-537 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-AC-538I DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYI N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1Equipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-A C-538 I DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-A1Project:
600VAC MOTOR CONTROL CENTER EZC-A1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 613.00 ft, 205 Manufacturer/Model:
AB2, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-3431A and 12-3073D 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 12-3431A and 12-3073D2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-539 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-539 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYI NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-A1Equipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-A1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-A1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling light rod hung can impact panel 2-EZC-A I & 2-EZC-B 1 -NOT damaging -not that sensitive 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Ceiling light rod hung can impact panel 2-EZC-A I & 2-EZC-B 1 -NOTdamaging
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
-not that sensitive
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-540 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers iDment
: 9. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-540 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1Equipment Class: (1) Motor Control CentersiDment


== Description:==
== Description:==


600VAC MOTOR CONTROlL CENTER EZC-A1C-541 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:Prii i"nmant ner-rintinn 2-EZC-A1(1) Motor Control Centers600VAC MOTOR CONTROL CENTER EZC-A1C-542 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-BEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROl L CENTER EZC-A1 C-541 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Prii i"nmant ner-rintinn 2-EZC-A1 (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-A1 C-542 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BProject:
600VAC MOTOR CONTROL CENTER EZC-B Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 613.00 ft, 205 Manufacturer/Model:
AB2, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-543 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-BEquipment Class: (1) Motor Control CentersEquipment
Yes C-543 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?YesYesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments INSULATION Debris inside 2-EZC-R5A Evaluated by: George G Thomas Date: 10/18/12 Q- ,A. _. Neda Stoeva 10/18/12 Photos C-544 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment
CommentsINSULATION Debris inside 2-EZC-R5A Evaluated by: George G Thomas Date: 10/18/12Q- ,A. _. Neda Stoeva 10/18/12PhotosC-544 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-BEquipment Class: (1) Motor Control CentersEquipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BC-545 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-BEquipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-B C-545 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-BC-546 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-EZC-B(1) Motor Control Centers600VAC MOTOR CONTROL CI-'t1 (U/llC-547 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B1Equipment Class: (1) Motor Control CentersEquipment
600VAC MOTOR CONTROL CENTER EZC-B C-546 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-EZC-B (1) Motor Control Centers 600VAC MOTOR CONTROL C I-'t1 (U/ll C-547 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B1 Equipment Class: (1) Motor Control Centers Equipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-B1Project:
600VAC MOTOR CONTROL CENTER EZC-B1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 613.00 ft, 205 Manufacturer/Model:
AB2, 613.00 ft, 205Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-3431A and 12-3073D 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 12-3431A and 12-3073D2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-548 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-Bl Equipment Class: (1) Motor Control Centers Eauipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-548 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-EZC-BlEquipment Class: (1) Motor Control CentersEauipment


==
==
Description:==
Description:==


600VAC MOTOR CONTROL CENTER EZC-B1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
600VAC MOTOR CONTROL CENTER EZC-B1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution  
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Ceiling light rod hung can impact panel 2-EZC-A 1 & 2-EZC-B1 -NOT damaging -not that sensitive 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Ceiling light rod hung can impact panel 2-EZC-A 1 & 2-EZC-B1  
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
-NOTdamaging
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-549 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-BI Equipment Class: (1) Motor Control Centers-nidrinmnfnt nlnerrintinn" IAfTIlP (llNNITPflI (I NTITR P717.-R1tuu C-550 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Equipment
-not that sensitive
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-549 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-BIEquipment Class: (1) Motor Control Centers-nidrinmnfnt nlnerrintinn" IAfTIlP (llNNITPflI (I NTITR P717.-R1tuuC-550 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4Project:
AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 621.00 ft, 10 Manufacturer/Model:
AB2, 621.00 ft, 10Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 2-5567A REV6 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 2-5567A REV62. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-551 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-551 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-FFI-240 Equipment Class: (18) Instruments on RacksEquipment


==
==
Description:==
Description:==


AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-552 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Eauinment
CommentsEvaluated by: --George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-552 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LI-I N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on RacksEauinment


==
==
Description:==
Description:==


AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4i-HIuuzl tC-553 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks AlIYll IAIRY FI:I:DWATFR TC IFNFRATC)R OMF-3-4m /C-554 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-FFI-240 (18) Instruments on RacksAUXILIARY FEEDWATER TOC-555 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y jN USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 5WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 i-HIuuzl t C-553 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks AlIYll IAIRY FI:I:DWATFR TC IFNFRATC)R OMF-3-4 m /C-554 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-FFI-240 (18) Instruments on Racks AUXILIARY FEEDWATER TO C-555 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST COMPONENT COOLING WATER HEAT EXCHANGER Project:
WEST COMPONENT COOLING WATER HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 609 Manufacturer/Model:
AB2, 609.00 ft, 609Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-3285 REV24 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes Thread engagement of north west bolt -OK by tag -And north east bolt -DOC# not visible -OK per SD-010405-001
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
DWG 12-3285 REV242. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
YesThread engagement of north west bolt -OK by tag -And north eastbolt -DOC# not visible -OK per SD-010405-001
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-556 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-556 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y FN] USeismic Walkdown Checklist (SWC)Equipment ID No.:2-HE-1 5WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Fire extinguishers on short hooks -AR 2012-11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?No Yes No 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
Fire extinguishers on short hooks -AR 2012-11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?NoYesNo10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-557 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Fr inm~ntnflmcrinfin  
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-557 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ] USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15WEquipment Class: (21) Tanks and Heat Exchangers Fr inm~ntnflmcrinfin  
\AIFPT C.MPflNFNIT (l00)I IN( WATFR HFAT FXC.HANflFR P9100049 P9100050 C-558 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15W Equipment Class: (21) Tanks and Heat Exchangers nment Descriotion:
\AIFPT C.MPflNFNIT (l00)I IN( WATFR HFAT FXC.HANflFR P9100049 P9100050C-558 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y EN] USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15WEquipment Class: (21) Tanks and Heat Exchangers nment Descriotion:
WEST COMPONENT COOLING WATER HEAT EXCHANGER C-559 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 7W Equipment Class: (21) Tanks and Heat Exchangers Eauinment Descriotion:
WEST COMPONENT COOLINGWATER HEAT EXCHANGER C-559 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HE-1 7WEquipment Class: (21) Tanks and Heat Exchangers Eauinment Descriotion:
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project:
AB2, 609.00 ft, 6 Manufacturer/Model:
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
AB2, 609.00 ft, 6Manufacturer/Model:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Additional space is provided at the end of this checklist for documenting other comments.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-560 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [j- N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes C-560 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [j- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by-.. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-561 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 7W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
CommentsEvaluated by-.. George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-561 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 7WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P9181131P9181133C-562 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: LI- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P9181131 P9181133 C-562 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P91b 11jIC-563 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17WEquipment Class: (21) Tanks and Heat Exchangers Eaui(ment  
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P91b 11jI C-563 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Eaui(ment  


==
==
Description:==
Description:==


WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-564 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FYj] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-564 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:
WEST CONTAINMENT SPRAY HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 609.00 ft, 4 Manufacturer/Model:
AB2, 609.00 ft, 4Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
Yes4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-565 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: j] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
Yes C-565 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: j] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12--,h,,,4' Neda Stoeva 10/18/12 Photos C-566 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  
CommentsEvaluated by: -George G Thomas Date: 10/18/12--,h,,,4' Neda Stoeva 10/18/12PhotosC-566 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180979C-567 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180979 C-567 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCHANGER C-568 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y ] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers Equipment  
WEST CONTAINMENT SPRAY HEAT EXCHANGER C-568 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment  


==
==
Description:==
Description:==


WEST CONTAINMENT SPRAY HEAT EXCC-569 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1,09/12/13 Status: F-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers E ui ment Descri tion: WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180986 P9180987P9180988 P9180989C-570 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers ELQT fCnKITAIP
WEST CONTAINMENT SPRAY HEAT EXC C-569 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers E ui ment Descri tion: WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180986 P9180987 P9180988 P9180989 C-570 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers ELQT fCnKITAIP-NT SPRAY HEAT EXCHANGER I.-JqI xfl lAM-lqI r-Z, I Outpz C-571 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers
-NT SPRAY HEAT EXCHANGER I.-JqI xfl lAM-lqIr-Z, I OutpzC-571 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18WEquipment Class: (21) Tanks and Heat Exchangers
'EST CONTAINMENT SPRAY HEAT EXCHANGER C-572 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-- ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
'EST CONTAINMENT SPRAY HEAT EXCHANGER C-572 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-- ] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 650.00 ft, 129 Manufacturer/Model:
AB2, 650.00 ft, 129Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
DWG 12-3366 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
DWG 12-3366 REV52. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
C-573 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-573 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-ACRA-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-574 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-ACRA-2 (10) Air Handlers CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING F-ý1UU141 I'B1UUI 4Z C-575 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-574 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: r-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-H V-ACRA-2(10) Air HandlersCONTROL ROOM VENTILATION SOUTH AIR CONDITIONING F-ý1UU141 I'B1UUI 4ZC-575 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING C-576 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: EIY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air HandlersEquipment
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING C-576 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EIY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYProject:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 633.00 ft, 8 Manufacturer/Model:
AB2, 633.00 ft, 8Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes2 front middle bolts on filter do not have full thread engagement  
Yes 2 front middle bolts on filter do not have full thread engagement  
-OKper SD-991215-024 pg. 123. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
-OK per SD-991215-024 pg. 12 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?5. Is the anchorage configuration consistent with plant documentation?
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-577 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-AES-2 Equipment Class: (10) Air HandlersEquipment
C-577 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall behind component filter- DWG 12-4029, Wall W-7 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
Block wall behind component filter- DWG 12-4029, Wall W-79. Do attached lines have adequate flexibility to avoid damage?YesYes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12" ti'Neda Stoeva 10/18/12 Photos C-578 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment
CommentsEvaluated by: -George G Thomas Date: 10/18/12" ti'Neda Stoeva 10/18/12PhotosC-578 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [-ý N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYP9100191P9100192C-579 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7 N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air HandlersJILDING VI -11111 _1 1P9100198C-580 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air HandlersEquipment Descrption:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY P9100191 P9100192 C-579 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers JILDING V I -11111 _1 1 P9100198 C-580 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment Descrption:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYC-581 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air HandlersEquipment
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-581 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


AUXILIARY BUILDING VENTILATION ENGINEERED SAFETYC-582 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air HandlersEquipment
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-582 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1Project:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
CON2, 625.00 ft, 75 Manufacturer/Model:
CON2, 625.00 ft, 75Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
SQUG 2-HV-CEQ-1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?
Anchorage
Yes Missing bolt on backside as identified in SEWS -SQUG 2-HV-CEQ-1 REVO 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of Yesthe 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Mounted to floor grate 5. Is the anchorage configuration consistent with plant documentation?
SQUG 2-HV-CEQ-1 REVO2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YesMissing bolt on backside as identified in SEWS -SQUG 2-HV-CEQ-1 REVO3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Mounted to floor grate5. Is the anchorage configuration consistent with plant documentation?
C-583 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment
Yes(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
C-583 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-CEQ-1 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments.. .08/15/2013 Evaluated by: a14,ýAt f&X Lindsay M. Yates Date: A Neda Stoeva 08/15/2013 Photos C-584 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers T H'P9130260 C-585 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: P~ni inmanf naer-rinfinn-2-H V-CEQ-1 (10) Air Handlers CONTAINMENT HYDROG P9130266 C-586 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: IT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 2-HV-CEQ-1 U ~IN I iII U13iUZ(Z C-587 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-CEQ-1 (10) Air Handlers HYDR(I-' ZI [ U// 11 P9130275 P9130276 C-588 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauioment
Comments.. .08/15/2013 Evaluated by:a14,ýAt f&XLindsay M. YatesDate:ANeda Stoeva08/15/2013 PhotosC-584 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air HandlersT H'P9130260C-585 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: [y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:P~ni inmanf naer-rinfinn-2-H V-CEQ-1(10) Air HandlersCONTAINMENT HYDROGP9130266C-586 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: IT] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air Handlers2-HV-CEQ-1 U ~IN I iIIU13iUZ(ZC-587 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: F-] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-H V-CEQ-1(10) Air HandlersHYDR(I-' ZI [ U// 11P9130275 P9130276C-588 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air HandlersEauioment


==
==
Description:==
Description:==


CONTAINMENT t2-HV-CEQ-1 H)/C-589 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (10) Air Handlers2-HV-CEQ-1 I JI MY[~P9130284C-590 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: FY- N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air HandlersEquipment
CONTAINMENT t 2-HV-CEQ-1 H)/C-589 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 2-HV-CEQ-1 I JI MY[~P9130284 C-590 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1"I 1UZZ50C-591 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air HandlersEquipmentlDescri tion: CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1P9130289C-592 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Yj NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1"I 1UZZ50 C-591 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers EquipmentlDescri tion: CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130289 C-592 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2Project:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
CON2, 625.00 ft, 74 Manufacturer/Model:
CON2, 625.00 ft, 74Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documentinq other comments.
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Missing bolt on support directly below 2-VMO-101  
Anchorage
-OK per SEWS report -SQUG 2-HV-CEQ-2 REVO 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one ofthe 50% of SWEL items requiring such verification)?
Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
No2. Is the anchorage free of bent, broken, missing or loose hardware?
Missing bolt on support directly below 2-VMO-101  
-OK per SEWSreport -SQUG 2-HV-CEQ-2 REVO3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?
YesYes4. Is the anchorage free of visible cracks in the concrete near theanchors?5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable Not Applicable
Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YesC-593 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment
Yes C-593 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes8. Are overhead equipment, distribution  
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesYesYesOther Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
Comments Evaluatedby:  
CommentsEvaluatedby:  
*eta Lindsay M. Yates Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos A C-594 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-CEQ-2 (10) Air Handlers IT HYDRO P9130291 C-595 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment
*eta Lindsay M. Yates Date: 08/15/2013 Neda Stoeva 08/15/2013 PhotosAC-594 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] NUSeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class:2-H V-CEQ-2(10) Air HandlersIT HYDROP9130291C-595 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y-] N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air HandlersEquipment


==
==
Description:==
Description:==


CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2C-596 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: jY N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) FansEquipment
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-596 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):
DC Cook 2 SWELLocation (Bldg, Elev,Room/Area):
AB2, 587.00 ft, 121 Manufacturer/Model:
AB2, 587.00 ft, 121Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?
Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of Nothe 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
YesLimited visibility of anchorage, visible portions OK3. Is the anchorage free of corrosion that is more than mild surface Yesoxidation?
Yes Limited visibility of anchorage, visible portions OK 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
VERY LIMITED VISIBILITY
VERY LIMITED VISIBILITY
: 4. Is the anchorage free of visible cracks in the concrete near the Yesanchors?VERY LIMITED VISIBILITY
: 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?VERY LIMITED VISIBILITY
: 5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?
Not Applicable (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)
Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yespotentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-597 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7-Y NUSeismic Walkdown Checklist (SWC)Equipment ID No.:2-HV-DGX-2 Equipment Class: (9) FansEquipment
C-597 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YesRod hung light can swing into fan -OK, because it will not affectfunction of equipment
Yes Rod hung light can swing into fan -OK, because it will not affect function of equipment 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution  
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?
Yes9. Do attached lines have adequate flexibility to avoid damage?Yes10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?YesOther Adverse Conditions
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-598 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (9) Fans 2-HV-DGX-2 JCY DIED FI-13U4,J' fýU1I U43Z"1IU4ii C-599 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment
: 11. Have you looked for and found no adverse seismic conditions that Yescould adversely affect the safety functions of the equipment?
CommentsEvaluated by: George G Thomas Date: 10/18/12Neda Stoeva 10/18/12PhotosC-598 DC Cook Unit I & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: Y] N USeismic Walkdown Checklist (SWC)Equipment ID No.:Equipment Class: (9) Fans2-HV-DGX-2 JCY DIEDFI-13U4,J' fýU1I U43Z"1IU4iiC-599 DC Cook Unit 1 & Unit 2SD-121023-001 Rev. 1, 09/12/13Status: 7-Y N USeismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) FansEquipment


==
==
Description:==
Description:==


AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434C-600}}
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 C-600}}

Latest revision as of 00:04, 14 July 2018

SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-501 Through Page C-600
ML13267A322
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/12/2013
From: Stoeva N
Stevenson & Associates
To:
American Electric Power, Indiana Michigan Power Co, Office of Nuclear Reactor Regulation
Shared Package
ML13267A279 List:
References
AEP-NRC-2013-074 SD-121023-001, Rev 1
Download: ML13267A322 (100)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 586.00 ft, 24 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Supported off the wall 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-501 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jjJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-1 14 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Tape -ribbon wrapped around it Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-502 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CLI-114 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CONDENSATE STORAGE TANK TK-32 LEVEL INDICATOR P9180889 C-503 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 2-5540 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Could only see anchorage of angle to unistrut -Cannot open panel to see how it is attached to angle (whole face plate needs to be unscrewed to get in)3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Angle bolted to unistrut, part of panel welded to embedded plate 5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-504 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -Ceiling tiles OK per DWG 12-40 70 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-505 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-3 Equipment Class: (14) Distribution Panels 120VAC CONTROL ROOM II P9181091 C-506 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRII Equipment Class: (14) Distribution Panels ioment Descriotion:

120VAC CONTROL RO D-3 OM INSTRUMENT DISTRIBUTION C-507 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 202 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes C-508 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-509 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM F'ýVl IUMA C-510 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-CRID-4-INV Equipment Class: (16) Inverters Equipment

==

Description:==

120VAC CONTROL ROOM INSTRUMENT DISTRIBUTION SYSTEM C-511 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?Spalled concrete on 2 front left bolts is OK by SEWS documents and ANCHOR evaluation does not credit those 2 bolts.5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-512 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes ROD HUNG light can swing into panel (separate box up on top right comer -beige) but would not be damaging 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-513 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-DGAB (20) Instrumentation and Control Panels and Cabinets'Y DIE:1(1=x1=ATnD Cnh 110 (AR Q (r)NITPCnI"I,4U40I F C-514 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: -Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets rM. .I A ' r-lK'rI 'EI:.IIED AT"rfB ffArI 4C '1 AD ITDf'% I T LJIrIOFL L P9140482"-14U4t5, C-515 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets ,Y DIESEL FU14U400 C-516 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130471 C-517 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets=RGENCY DIE:1 f'-C:K1C:DA-MD r)hAr-: Irfl-AD 1-nK1-rDn1 I-.'Ll'IAM Ila /P%C-518 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL C-519 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LII] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-DGAB-INV REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

Discoloration of back right anchor bolt -very minor rust 4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-520 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12_Neda Stoeva 10/18/12 Photos C-521 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (16) In 2-DGAB-INV ierters'Y DIE FU1 U440 C-522 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV EauiDment Class: (16) Inverters nment Descrintion:

IENCY DIESEL GENERATOR OME-1 P9130449 C-523 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-DGAB-INV Equipment Class: (16) Inverters ICY DIE.Iw% -"-u l Iali I C-524 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves EauiDment DescriDtion:

CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 612.00 ft, 12 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-525 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

CONTAINMENT LOWER VOLUME EAST AIR SAMPLE ESR-3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-526 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ECR-23 Equipment Class: (7) Fluid-Operated Valves:NT LC C-527 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y WJ U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-CCW AND 2-ESW REV3 A 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Welded to embedded plate 5. Is the anchorage configuration consistent with plant documentation?

No (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

A 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

C-528 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles -Ceiling tiles OK per DWG 12-40 70 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -- George G Thomas Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos C-529 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N-] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets ipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL C-530 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y I U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets pm nt

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL MlJId1 uI C-531 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y lN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ESSENTIAL SERVICE WATER CONTROL PANEL C-532 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1. 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-533 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-534 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A P9170775 C-535 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers IPrm dnmtfnt -lerin+in gA1A\IA('

hAC)TC'"P "nKITPr(I (KIT:: P FP7Tl: A C-536 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:

2-EZC-A (1) Motor Control Centers R CONTROL IlI (Uff4 P9170785 C-537 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A C-538 I DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3431A and 12-3073D 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-539 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-A1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ceiling light rod hung can impact panel 2-EZC-A I & 2-EZC-B 1 -NOT damaging -not that sensitive 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-540 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-A1 Equipment Class: (1) Motor Control Centers iDment

Description:

600VAC MOTOR CONTROl L CENTER EZC-A1 C-541 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Prii i"nmant ner-rintinn 2-EZC-A1 (1) Motor Control Centers 600VAC MOTOR CONTROL CENTER EZC-A1 C-542 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-543 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments INSULATION Debris inside 2-EZC-R5A Evaluated by: George G Thomas Date: 10/18/12 Q- ,A. _. Neda Stoeva 10/18/12 Photos C-544 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B C-545 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B C-546 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-EZC-B (1) Motor Control Centers 600VAC MOTOR CONTROL C I-'t1 (U/ll C-547 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-B1 Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3431A and 12-3073D 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-548 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-Bl Equipment Class: (1) Motor Control Centers Eauipment

==

Description:==

600VAC MOTOR CONTROL CENTER EZC-B1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ceiling light rod hung can impact panel 2-EZC-A 1 & 2-EZC-B1 -NOT damaging -not that sensitive 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-549 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-EZC-BI Equipment Class: (1) Motor Control Centers-nidrinmnfnt nlnerrintinn" IAfTIlP (llNNITPflI (I NTITR P717.-R1tuu C-550 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 621.00 ft, 10 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 2-5567A REV6 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-551 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: --George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-552 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks Eauinment

==

Description:==

AUXILIARY FEEDWATER TO STEAM GENERATOR OME-3-4 i-HIuuzl t C-553 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-FFI-240 Equipment Class: (18) Instruments on Racks AlIYll IAIRY FI:I:DWATFR TC IFNFRATC)R OMF-3-4 m /C-554 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-FFI-240 (18) Instruments on Racks AUXILIARY FEEDWATER TO C-555 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y jN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST COMPONENT COOLING WATER HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 609 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3285 REV24 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Thread engagement of north west bolt -OK by tag -And north east bolt -DOC# not visible -OK per SD-010405-001

3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?
4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-556 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y FN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 5W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST COMPONENT COOLING WATER HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire extinguishers on short hooks -AR 2012-11669 was issued.9. Do attached lines have adequate flexibility to avoid damage?No Yes No 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-557 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15W Equipment Class: (21) Tanks and Heat Exchangers Fr inm~ntnflmcrinfin

\AIFPT C.MPflNFNIT (l00)I IN( WATFR HFAT FXC.HANflFR P9100049 P9100050 C-558 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y EN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-15W Equipment Class: (21) Tanks and Heat Exchangers nment Descriotion:

WEST COMPONENT COOLING WATER HEAT EXCHANGER C-559 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 7W Equipment Class: (21) Tanks and Heat Exchangers Eauinment Descriotion:

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 6 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-560 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [j- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by-.. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-561 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-1 7W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P9181131 P9181133 C-562 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: LI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P91b 11jI C-563 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-17W Equipment Class: (21) Tanks and Heat Exchangers Eaui(ment

==

Description:==

WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER C-564 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 609.00 ft, 4 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-565 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: j] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12--,h,,,4' Neda Stoeva 10/18/12 Photos C-566 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180979 C-567 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXCHANGER C-568 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

WEST CONTAINMENT SPRAY HEAT EXC C-569 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1,09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers E ui ment Descri tion: WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180986 P9180987 P9180988 P9180989 C-570 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers ELQT fCnKITAIP-NT SPRAY HEAT EXCHANGER I.-JqI xfl lAM-lqI r-Z, I Outpz C-571 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HE-18W Equipment Class: (21) Tanks and Heat Exchangers

'EST CONTAINMENT SPRAY HEAT EXCHANGER C-572 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-- ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 650.00 ft, 129 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

DWG 12-3366 REV5 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-573 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-574 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-ACRA-2 (10) Air Handlers CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING F-ý1UU141 I'B1UUI 4Z C-575 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-ACRA-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING C-576 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: EIY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 633.00 ft, 8 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 2 front middle bolts on filter do not have full thread engagement

-OK per SD-991215-024 pg. 12 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-577 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall behind component filter- DWG 12-4029, Wall W-7 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: -George G Thomas Date: 10/18/12" ti'Neda Stoeva 10/18/12 Photos C-578 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY P9100191 P9100192 C-579 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers JILDING V I -11111 _1 1 P9100198 C-580 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment Descrption:

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-581 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-AES-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-582 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 75 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of Yes the 50% of SWEL items requiring such verification)?

SQUG 2-HV-CEQ-1 REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Missing bolt on backside as identified in SEWS -SQUG 2-HV-CEQ-1 REVO 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

4. Is the anchorage free of visible cracks in the concrete near the Not Applicable anchors?Mounted to floor grate 5. Is the anchorage configuration consistent with plant documentation?

Yes (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-583 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments.. .08/15/2013 Evaluated by: a14,ýAt f&X Lindsay M. Yates Date: A Neda Stoeva 08/15/2013 Photos C-584 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers T H'P9130260 C-585 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: [y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: P~ni inmanf naer-rinfinn-2-H V-CEQ-1 (10) Air Handlers CONTAINMENT HYDROG P9130266 C-586 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: IT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 2-HV-CEQ-1 U ~IN I iII U13iUZ(Z C-587 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-CEQ-1 (10) Air Handlers HYDR(I-' ZI [ U// 11 P9130275 P9130276 C-588 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers Eauioment

==

Description:==

CONTAINMENT t 2-HV-CEQ-1 H)/C-589 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (10) Air Handlers 2-HV-CEQ-1 I JI MY[~P9130284 C-590 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: FY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1"I 1UZZ50 C-591 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-1 Equipment Class: (10) Air Handlers EquipmentlDescri tion: CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 P9130289 C-592 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

CON2, 625.00 ft, 74 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Missing bolt on support directly below 2-VMO-101

-OK per SEWS report -SQUG 2-HV-CEQ-2 REVO 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-593 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluatedby:

  • eta Lindsay M. Yates Date: 08/15/2013 Neda Stoeva 08/15/2013 Photos A C-594 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 2-H V-CEQ-2 (10) Air Handlers IT HYDRO P9130291 C-595 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-CEQ-2 Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 C-596 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area):

AB2, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of No the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Limited visibility of anchorage, visible portions OK 3. Is the anchorage free of corrosion that is more than mild surface Yes oxidation?

VERY LIMITED VISIBILITY

4. Is the anchorage free of visible cracks in the concrete near the Yes anchors?VERY LIMITED VISIBILITY
5. Is the anchorage configuration consistent with plant documentation?

Not Applicable (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-597 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Rod hung light can swing into fan -OK, because it will not affect function of equipment 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that Yes could adversely affect the safety functions of the equipment?

Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-598 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: (9) Fans 2-HV-DGX-2 JCY DIED FI-13U4,J' fýU1I U43Z"1IU4ii C-599 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 1, 09/12/13 Status: 7-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2-HV-DGX-2 Equipment Class: (9) Fans Equipment

==

Description:==

AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130434 C-600