ML17263A933: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRIORITY(ACCELERATED RIDSPROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9502130285 DOC.DATE:
{{#Wiki_filter:PRIORITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502130285 DOC.DATE: 95/02/03 NOTARIZED:
95/02/03NOTARIZED:
NO DOCKET FACIL:50-244 RobertEmmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WYDAY,Z.A.
NODOCKETFACIL:50-244 RobertEmmet GinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WYDAY,Z.A.
Rochester Ges&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.
Rochester Ges&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.
Project Directorate I-3 (PDl-3)(Post 941001)
ProjectDirectorate I-3(PDl-3)(Post941001)


==SUBJECT:==
==SUBJECT:==
Rev5toAtt-17.0, "Attachment SD-1."W/950203ltr.DISTRIBUTION CODEA045DCOPIESRECEIVED:LTR JENCLSIZE:TITLE:ORSubmittal:
Rev 5 to Att-17.0,"Attachment SD-1." W/950203 ltr.DISTRIBUTION CODE A045D COPIES RECEIVED:LTR J ENCL SIZE: TITLE: OR Submittal:
Emergency Preparedness,Pla s,Implement'g Procedures, Cpi0NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Emergency Preparedness,Pla s, Implement'g Procedures, C pi 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244RRECIPIENT IDCODE/NAME PD1-3PDINTERNAL~ICECENTERP1~NUDOCSA'BSTRACT EXTERNAL:
05000244 R RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL~ICE CENTER P1~NUDOCS A'BSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRSS/PEPB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 D 0 U N NOTE TO ALL"RIDS" RECIPIENTS:
NOACCOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME JOHNSON,A NRR/DRSS/PEPB NRCPDRCOPIESLTTRENCL111111D0UNNOTETOALL"RIDS"RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT.504-2083)TO E Llih!INATE YOUR NAME FRO~I DISTRIBUTION LISTS FOR DOCI;MENTS YOU DON" I'LED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7 t<<P,/.<<III<<I
PLEASEHELPUSTOREDUCEiVASTE!CONTACI'THE DOCUMENTCONTROL DESK,ROOMPI-37(EXT.504-2083)TOELlih!INATEYOURNAMEFRO~IDISTRIBUTION LISTSFORDOCI;MENTS YOUDON"I'LED!TOTALNUMBEROFCOPIESREQUIRED:
<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TELEPHONE AREA COOE 71B 546-2700 February 3, 1995 Mr.Allen Johnson Project Directorate I-3 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
LTTR7ENCL7 t<<P,/.<<III<<I
<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 TELEPHONE AREACOOE71B546-2700February3,1995Mr.AllenJohnsonProjectDirectorate I-3U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555


==Subject:==
==Subject:==
Emergency Operating Procedures R.E.GinnaNuclearPowerPlantDocketNo.50-244
Emergency Operating Procedures R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Johnson:==
==Dear Mr.Johnson:==
Asrequested, enclosedareGinnaStationEmergency Operating Procedures.
As requested, enclosed are Ginna Station Emergency Operating Procedures.
VeryTrulyYours,a.dosephA.WidayJAW/jdwxc:Mr.LeeBettenhausen, USNRC,Region1ResidentInspector, GinnaStationRG&ENuclearSafety&Licensing y/,on2S9502130285 950203PDRADOCK05000244FPDR Page2
Very Truly Yours, a.d oseph A.Widay JAW/jdw xc: Mr.Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station RG&E Nuclear Safety&Licensing y/,on2S 9502130285 950203 PDR ADOCK 05000244 F PDR Page 2


==Enclosures:==
==Enclosures:==


ATT-17.0Revision5 EOP:ATT-17.01'ILE:ATTACHMENT SD-1REV:4PAGE1/of2Surintendent Date7Perfmthefollowing localactionstocompletenormalsecondary systeshutdown:
ATT-17.0 Revision 5 EOP: ATT-17.0 1'ILE: ATTACHMENT SD-1 REV: 4 PAGE 1/of 2 Su rintendent Date 7 Perf m the following local actions to complete normal secondary syste shutdown: ose reheater 4th pass temperature control valves: V-2432 (SW corner 1A MSR)o V-2433 (SW corner 1B MSR)o V-2434 (SW corner 2A MSR)o-2435 (SW corner 2B MSR)Close r heater steam chain valves: o V-3 50 (SW of 1B MSR)o V-35 1 (SW of 1b MSR)o V-355 (NW of 1A MSR)o V-3553 (NW of 1A MSR)0 Open Reheater steamline vents middle floor): o V-8500 o V-8501 o V-8502 o V-8504 o V-8505 SW corner of condenser, Close flange heting solation valves: o MOV-3601A (TB i die Lvl West of TURB L.O.Reservoir) o MOV-3602A NOTE: IF either S/G p essure i LESS THAN condensate header pressure, THEN manual iso ation of the MFW regulating and bypass valve should be c sidered before aligning for cooldown re irculation.
osereheater4thpasstemperature controlvalves:V-2432(SWcorner1AMSR)oV-2433(SWcorner1BMSR)oV-2434(SWcorner2AMSR)o-2435(SWcorner2BMSR)Closerheatersteamchainvalves:oV-350(SWof1BMSR)oV-351(SWof1bMSR)oV-355(NWof1AMSR)oV-3553(NWof1AMSR)0OpenReheatersteamline ventsmiddlefloor):oV-8500oV-8501oV-8502oV-8504oV-8505SWcornerofcondenser, Closeflangehetingsolationvalves:oMOV-3601A (TBidieLvlWestofTURBL.O.Reservoir) oMOV-3602A NOTE:IFeitherS/GpessureiLESSTHANcondensate headerpressure, THENmanualisoationoftheMFWregulating andbypassvalveshouldbecsideredbeforealigningforcooldownreirculation.
Open the ollowing valves to align for condensate feed system oldown RECIRC: o V 982B (at N5 heater ou et header)o-3983B (at N5 heater out et header)o V-4363 (at N5 heater outle header)o V-4365 (by MFW regulating ives)V-4361 (southwest corner of condenser, middle floor)o V-3976A MFP A discharge valv bypass valve o V-3977A MFP B discharge valve bypass valve Secure all 5 secondary chemical add tion pumps on TURB BLDG middle floor by N5 heaters.o Secure all 3 ammonia pumps, TURB BLDG basement by MCC A.  
Opentheollowingvalvestoalignforcondensate feedsystemoldownRECIRC:oV982B(atN5heaterouetheader)o-3983B(atN5heateroutetheader)oV-4363(atN5heateroutleheader)oV-4365(byMFWregulating ives)V-4361(southwest cornerofcondenser, middlefloor)oV-3976AMFPAdischarge valvbypassvalveoV-3977AMFPBdischarge valvebypassvalveSecureall5secondary chemicaladdtionpumpsonTURBBLDGmiddlefloorbyN5heaters.oSecureall3ammoniapumps,TURBBLDGbasementbyMCCA.  
+1 Q I I A t l t EOP: ATT-17.0 ATTACHMENT SD-1 REV: 4 PAGE 2 of 2 o Isolate SW from the following coolers: o MFW Pump Oil Coolers (MFW pump room)o V-4703 o V-4704 o Exciter Air Cooler: o V-4679 (chain valve next to condensate transfer pump)o Bus Duct Air Cooler (TURB BLDG basement East of bus duct cooler)o V-4674 o V-4674C (mini bypass around V-4674)o Throttle SW as necessary from following coolers: o Generator Seal Oil Unit Coolers (H2 side and air side): o V-4674A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o V-4677A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o Main Lube Oil Coolers (SW corner of Turb Oil Reservoir) o V-4691 o V-4692 o WHEN the turbine shaft stops, THEN notify Control Room.Control Room personnel will determine if adequate power available to start turning gear.o Transfer house heating steam to house heating boiler if necessary (refer to T-35H, NUCLEAR HOUSE HEATING STEAM TO BOILER STEAM SUPPLY CHANGE).o Perform T-14G, STEAM GENERATOR BLOWDOWN HEAT RECOVERY SYSTEM SHUTDOWN.o Restore MAKEUP to CSTs as directed by Control Room.  
+1QIIAtlt EOP:ATT-17.0ATTACHMENT SD-1REV:4PAGE2of2oIsolateSWfromthefollowing coolers:oMFWPumpOilCoolers(MFWpumproom)oV-4703oV-4704oExciterAirCooler:oV-4679(chainvalvenexttocondensate transferpump)oBusDuctAirCooler(TURBBLDGbasementEastofbusductcooler)oV-4674oV-4674C(minibypassaroundV-4674)oThrottleSWasnecessary fromfollowing coolers:oGenerator SealOilUnitCoolers(H2sideandairside):oV-4674A(minibypassdischvalveinsidesealoilenclosure Bldg.NWcorner)oV-4677A(minibypassdischvalveinsidesealoilenclosure Bldg.NWcorner)oMainLubeOilCoolers(SWcornerofTurbOilReservoir) oV-4691oV-4692oWHENtheturbineshaftstops,THENnotifyControlRoom.ControlRoompersonnel willdetermine ifadequatepoweravailable tostartturninggear.oTransferhouseheatingsteamtohouseheatingboilerifnecessary (refertoT-35H,NUCLEARHOUSEHEATINGSTEAMTOBOILERSTEAMSUPPLYCHANGE).oPerformT-14G,STEAMGENERATOR BLOWDOWNHEATRECOVERYSYSTEMSHUTDOWN.
oRestoreMAKEUPtoCSTsasdirectedbyControlRoom.  
-~}}
-~}}

Revision as of 13:59, 7 July 2018

Rev 5 to Att-17.0, Attachment SD-1. W/950203 Ltr
ML17263A933
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/03/1995
From: WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
ATT-17.0, NUDOCS 9502130285
Download: ML17263A933 (7)


Text

PRIORITY (ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502130285 DOC.DATE: 95/02/03 NOTARIZED:

NO DOCKET FACIL:50-244 RobertEmmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WYDAY,Z.A.

Rochester Ges&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.

Project Directorate I-3 (PDl-3)(Post 941001)

SUBJECT:

Rev 5 to Att-17.0,"Attachment SD-1." W/950203 ltr.DISTRIBUTION CODE A045D COPIES RECEIVED:LTR J ENCL SIZE: TITLE: OR Submittal:

Emergency Preparedness,Pla s, Implement'g Procedures, C pi 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 R RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL~ICE CENTER P1~NUDOCS A'BSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRSS/PEPB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 D 0 U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENTCONTROL DESK, ROOM PI-37 (EXT.504-2083)TO E Llih!INATE YOUR NAME FRO~I DISTRIBUTION LISTS FOR DOCI;MENTS YOU DON" I'LED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL 7 t<<P,/.<<III<<I

<<<<<<<<<<<<&'J<<<<<<<<<<<<<<<<<<<<I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TELEPHONE AREA COOE 71B 546-2700 February 3, 1995 Mr.Allen Johnson Project Directorate I-3 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Subject:

Emergency Operating Procedures R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Johnson:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very Truly Yours, a.d oseph A.Widay JAW/jdw xc: Mr.Lee Bettenhausen, USNRC, Region 1 Resident Inspector, Ginna Station RG&E Nuclear Safety&Licensing y/,on2S 9502130285 950203 PDR ADOCK 05000244 F PDR Page 2

Enclosures:

ATT-17.0 Revision 5 EOP: ATT-17.0 1'ILE: ATTACHMENT SD-1 REV: 4 PAGE 1/of 2 Su rintendent Date 7 Perf m the following local actions to complete normal secondary syste shutdown: ose reheater 4th pass temperature control valves: V-2432 (SW corner 1A MSR)o V-2433 (SW corner 1B MSR)o V-2434 (SW corner 2A MSR)o-2435 (SW corner 2B MSR)Close r heater steam chain valves: o V-3 50 (SW of 1B MSR)o V-35 1 (SW of 1b MSR)o V-355 (NW of 1A MSR)o V-3553 (NW of 1A MSR)0 Open Reheater steamline vents middle floor): o V-8500 o V-8501 o V-8502 o V-8504 o V-8505 SW corner of condenser, Close flange heting solation valves: o MOV-3601A (TB i die Lvl West of TURB L.O.Reservoir) o MOV-3602A NOTE: IF either S/G p essure i LESS THAN condensate header pressure, THEN manual iso ation of the MFW regulating and bypass valve should be c sidered before aligning for cooldown re irculation.

Open the ollowing valves to align for condensate feed system oldown RECIRC: o V 982B (at N5 heater ou et header)o-3983B (at N5 heater out et header)o V-4363 (at N5 heater outle header)o V-4365 (by MFW regulating ives)V-4361 (southwest corner of condenser, middle floor)o V-3976A MFP A discharge valv bypass valve o V-3977A MFP B discharge valve bypass valve Secure all 5 secondary chemical add tion pumps on TURB BLDG middle floor by N5 heaters.o Secure all 3 ammonia pumps, TURB BLDG basement by MCC A.

+1 Q I I A t l t EOP: ATT-17.0 ATTACHMENT SD-1 REV: 4 PAGE 2 of 2 o Isolate SW from the following coolers: o MFW Pump Oil Coolers (MFW pump room)o V-4703 o V-4704 o Exciter Air Cooler: o V-4679 (chain valve next to condensate transfer pump)o Bus Duct Air Cooler (TURB BLDG basement East of bus duct cooler)o V-4674 o V-4674C (mini bypass around V-4674)o Throttle SW as necessary from following coolers: o Generator Seal Oil Unit Coolers (H2 side and air side): o V-4674A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o V-4677A (mini bypass disch valve inside seal oil enclosure Bldg.NW corner)o Main Lube Oil Coolers (SW corner of Turb Oil Reservoir) o V-4691 o V-4692 o WHEN the turbine shaft stops, THEN notify Control Room.Control Room personnel will determine if adequate power available to start turning gear.o Transfer house heating steam to house heating boiler if necessary (refer to T-35H, NUCLEAR HOUSE HEATING STEAM TO BOILER STEAM SUPPLY CHANGE).o Perform T-14G, STEAM GENERATOR BLOWDOWN HEAT RECOVERY SYSTEM SHUTDOWN.o Restore MAKEUP to CSTs as directed by Control Room.

-~