ML13291A290: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Letter, Updated Final Safety Analysis Report (UFSAR) | | document type = Letter, Updated Final Safety Analysis Report (UFSAR) | ||
| page count = 4 | | page count = 4 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 21:29, 3 July 2018
ML13291A290 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 09/26/2013 |
From: | Dacimo F Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NL-13-130 | |
Download: ML13291A290 (4) | |
Similar Documents at Indian Point | |
---|---|
Category:Letter
MONTHYEARML24011A1982024-01-12012 January 2024
[Table view]ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22257A1272022-09-14014 September 2022
[Table view]Biennial Defueled Safety Analysis Report Update, and Regulatory Commitment Change Summary - September 2020 to September 2022 ML20259A2022020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 1, Introduction and Summary ML20259A2072020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 6, Safety Analysis ML20259A2152020-09-14014 September 2020 Defueled Safety Analysis Report, Table of Contents ML20259A2122020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, License Renewal ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2032020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 2, Site and Environment ML20259A2012020-09-14014 September 2020 Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes ML20259A2142020-09-14014 September 2020 Defueled Safety Analysis Report, Instructions and Key to Unit 2 DSAR Revision 0 ML20259A2062020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 5, Conduct of Facility Activities ML20259A2102020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures ML20259A2132020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2052020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 4, Waste Disposal and Radiation Protection System ML20259A2042020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 3, Facility Design and Operation ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-18-069, Submittal of Revision 27 to Updated Final Safety Analysis Report2018-09-17017 September 2018 Submittal of Revision 27 to Updated Final Safety Analysis Report ML17354A0152017-11-28028 November 2017 Enclosure 2 - NET-28091-003-01NP, Rev. 0, Criticality Safety Analysis for the Indian Point Unit 2 Spent Fuel Pool with No Absorber Panel Credit IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A ML16280A2082016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Drawing No. 9321-F-2736-130 to Drawing No. 138248-9 ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A2072016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Figures 9.2-1 to 9.9-1 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-672016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-67 ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-752016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-92016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-9 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-72016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-7 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-52016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-5 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2202016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.2-0 to 14.2-18 ML16280A2242016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents ML16280A2232016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key ML16280A1962016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems ML16280A2222016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 15, Appendix a, License Renewal ML16280A1532016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 ML16280A2142016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A2122016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System ML16280A1592016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary ML16280A2172016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2062016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems ML16280A1872016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures 2022-09-14 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML13291A290&oldid=799632"