ML20259A211
ML20259A211 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 09/14/2020 |
From: | Entergy Nuclear Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20259A199 | List:
|
References | |
NL-20-066 | |
Download: ML20259A211 (5) | |
Similar Documents at Indian Point | |
---|---|
Category:Drawing
MONTHYEARML20259A2102020-09-14014 September 2020
[Table view]Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A1942016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures ML16280A1922016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings ML16280A1882016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures ML16280A1912016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures ML16280A1972016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A1672016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1662016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML14287A3432014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings ML14287A3562014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures ML14287A3512014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings ML14287A3502014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures ML14287A3482014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings ML14287A3472014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures ML14287A3422014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML11236A2262010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Table of Contents - Chapter 7, Page 18 of 108 ML11236A2272010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Chapter 7, Page 19 of 108 - Chapter 14 Figure 14.3-129 ML1012603792010-05-0606 May 2010 Drawing No. A205454, Revision 4, Containment Building Restraint & Support Design, Line 351. ML1000402912010-01-0404 January 2010 Chemical and Volume Control System - Sheet 1, Figure 9.2-1 ML11083A0542009-03-0606 March 2009 Lr Hearing - Slides from ACRS Subcommittee Meeting on March 4, 2009 NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0904008952008-02-29029 February 2008 No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram 2020-09-14 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22257A1272022-09-14014 September 2022
[Table view]Biennial Defueled Safety Analysis Report Update, and Regulatory Commitment Change Summary - September 2020 to September 2022 ML20259A2022020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 1, Introduction and Summary ML20259A2072020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 6, Safety Analysis ML20259A2152020-09-14014 September 2020 Defueled Safety Analysis Report, Table of Contents ML20259A2122020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, License Renewal ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2032020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 2, Site and Environment ML20259A2012020-09-14014 September 2020 Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes ML20259A2142020-09-14014 September 2020 Defueled Safety Analysis Report, Instructions and Key to Unit 2 DSAR Revision 0 ML20259A2062020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 5, Conduct of Facility Activities ML20259A2102020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures ML20259A2132020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2052020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 4, Waste Disposal and Radiation Protection System ML20259A2042020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 3, Facility Design and Operation ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-18-069, Submittal of Revision 27 to Updated Final Safety Analysis Report2018-09-17017 September 2018 Submittal of Revision 27 to Updated Final Safety Analysis Report ML17354A0152017-11-28028 November 2017 Enclosure 2 - NET-28091-003-01NP, Rev. 0, Criticality Safety Analysis for the Indian Point Unit 2 Spent Fuel Pool with No Absorber Panel Credit IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A ML16280A2082016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Drawing No. 9321-F-2736-130 to Drawing No. 138248-9 ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A2072016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Figures 9.2-1 to 9.9-1 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-672016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-67 ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-752016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-92016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-9 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-72016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-7 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-52016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-5 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2202016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.2-0 to 14.2-18 ML16280A2242016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents ML16280A2232016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key ML16280A1962016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems ML16280A2222016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 15, Appendix a, License Renewal ML16280A1532016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 ML16280A2142016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A2122016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System ML16280A1592016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary ML16280A2172016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2062016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems ML16280A1872016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures 2022-09-14 |
Text
I I I I CUAIE RELEASE OF 1-131 ONCE IN 50 YEAR OROUG HT
( 2 700 tt 3/HC)
E
'u*-
~
C:
0 CASTLE POINT VETEAAN S HOSPITAL 1
- 10 0
C:
0 10 u
C:
0 u
f M
10- 11 " - - - - - " - - - - - . . . _ __ _ _.....__ _ _ _ _ _ _- ' - - - - - '
0 5 10 15 20 25 30 DAYS AFTER BURST RELEASE INDIAN POINT UNIT No. 2 UFSAR FIGURE 118-1 IODINE-131 CONCENTRATION VS DAYS AFTER BURST RELEASE FROM INDIAN POINT FOR 1 CURIE RELEASE MIC. No. 1999MC3945 REV. No. 17 A
E ,0-10
'u
~
0
.J::.
(.) I 0- 11
- 0 C
-. 0 0
C
- u C
0 0
r M
Days After Burst Release INDIAN POINT UNIT No. 2 UFSAR FIGURE 118-2 IODINE-131 CONCENTRATION AT CHELSEA vs DAYS AFTER BURST RELEASE FROM INDIAN POINT FOR 1 CURIE RELEASE MIC. No. 1999MC3946 IREV. No. 17A
I icf 1 I
Ir;' r : I
,t;'
I I j I ; I!
' I I
I,, I I Iii I I I I' I I I:: (
I, I I I' t I
I
~
! ! i!
I ii
- i I
- I II I I j I l
- ' I i ' I : .* I 1d I I 1: I;.:
\
I I I I., I
- I l i;
I i I
I i !::
I : ':ii : ! ! I I I I
l i I
I : I I I I I
I '
I I
' I i I I
i I l I
\' I I l i l : I Ii'
'\ I II I iII! I I
I I
' ' ! I ' II I
I i' i I ,
0 2 4 6 8 10 12 14 18 18 20 22 24 otSTANCE UPSTREAM (MILES)
INDIAN POINT UNIT No. 2 UFSAR FIGURE 11 8-3 MAXIMUM CONCENTRATION vs DISTANCE UPSTREAM FOR 1 CURIE RELEASE MIC. No. 1999MC3947 REV. No. 17A
1dtl-J;l-,I,+#+~~~.
' ~ H - + ~ ~ ~.. ~.u+, -1,11.....,<,H+-1 ........................._.....
- ~*1***0
- I 6 , a
- 10 1d ,oz HALF LIFE (DAYS)
INDIAN POINT UNIT No. 2 UFSAR FIGURE 118-4 MAXIMUM CONCENTRATION AT CHELSEA vs HALF -LIFE FOR 1 CURIE RELEASE MIC. No. 1999MC3948 l REV. No. 17A
HALF UFE (DAYS)
INDIAN POINT UNIT No. 2 UFSAR FIGURE 118-5 TIME TO REACH PEAK CONCENTRATION AT CHELSEA vs HALF-LIFE FOR 1 CURIE RELEASE MIC. No. 1999MC3949 I REV. No. 17A