NL-18-069, Submittal of Revision 27 to Updated Final Safety Analysis Report

From kanterella
Jump to navigation Jump to search
Submittal of Revision 27 to Updated Final Safety Analysis Report
ML18304A083
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/17/2018
From: Vitale A
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18304A080 List:
References
NL-18-069
Download: ML18304A083 (20)


Text

  • ~~ Entergx Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan , NY 10511-0249 Tel 914 254 6700 Anthony J. Vitale Site Vice President NL-18-069 September 17, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville , MD 20852-2738

Subject:

Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (UFSAR), Revision 27 Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26 References : 1. NEI 98-03, "Guidelines for Updating Final Safety Analysis Reports ," Revision 1, June 1999

2. NEI 99-04, "Guidelines for Managing NRC Commitments," Revision 2, December 1995

Dear Sir or Madam :

Entergy Nuclear Operations, Inc. (Entergy), in accordance with 10 CFR 50.71(e), hereby transmits the most recent update to the Updated Final Safety Analysis Report (UFSAR) for Indian Point Unit 2 (IP2) . This submittal incorporates applicable changes made to the IP2 facility since the UFSAR update in September 2016, through the information available, at a minimum , as of March 17, 2018, which is six months prior to the date of this letter. Note that the last IP2 refueling outage was completed on April 21 , 2018. This submittal constitutes the twenty-seventh (27) revision to the IP2 UFSAR.

Entergy is submitting two DVDs as Enclosures 1 and 2 in the electronic medium of Adobe PDF on CD-ROM in accordance with the guidance contained in NRC, "General (Non-Adjudicatory) Electronic Submission Instructional Guide, " June 11 , 2009, Revision 4. contains a Non-Redacted version of the UFSAR for use by the NRC staff, and Enclosure 2 contains a Redacted version of the UFSAR. A Redacted version of the UFSAR has had certain sensitive information removed which was identified due to meeting the NRC's criteria on sensitive information, as specified in SECY-04-0191 ,

"Withholding Sensitive Unclassified Information Concerning Nuclear Power Reactors from Public Disclosure." Entergy is requesting that the Non-Redacted version be withheld from the public in accordance with 10 CFR 2.390(d)(1) as material included

NL-18-069 Docket Nos. 50-247 Page 2 of 3 within is classified as non-publicly available information. Enclosure 2 also contains the IP2 Technical Specification Bases, IP2 Technical Requirements Manual (TRM} , and the Holtec International, "Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center" Revision 10.

UFSAR changes to the text and tables since the last revision are indicated by gray highlighted background rather than a revision bar next to the line containing the change .

Any UFSAR figures that have been revised since the last revision contain "Rev. 27" in the figure title block.

This update to the FSAR also contains information that has been classified as "Historical" information according to the NEI 98-03 definition (Reference 2), and is no longer subject to updating . Material designated as "Historical" information in the UFSAR is indicated by a green highlighted background . to this letter, "Summary Report of IP2 UFSAR Revision 27 Changes,"

contains a summary with a brief description of the information changed in this revision to the IP2 UFSAR.

IP2 Technical Specification 5.5.12.d, "Technical Specification Bases Control Program ,"

requires that changes to the Bases implemented without prior NRC approval be provided to the NRC on a frequency consistent with 10 CFR 50.71(e) . The required information is provided in Attachment 2, "Summary of Revisions to the IP2 Technical Specification Bases" and the entire document is provided on Enclosure 2.

As specified in NEI 98-03 (Reference 1), the Technical Requirements Manual (TRM) is controlled in a manner consistent with procedures fully or partially described in the UFSAR. Under this approach, the TRM document is subject to the change control requirements of 10 CFR 50.59. A "Summary of Revisions to the IP2 Technical Requirements Manual (TRM)" is provided in Attachment 3, and the entire document is provided on Enclosure 2.

NEI 99-04 (Reference 2) provides guidance on the commitments which may be changed without prior NRC approval, but which require periodic NRC staff notification either annually or along with the FSAR updates as required by 10 CFR 50.71(e) . Attachment 4 to this letter contains a summary of changes to commitments since the last submittal of the IP2 UFSAR update. The table does not include commitments that were previously reported in separate submittals or where the change was approved by the NRC in a license amendment.

As specified in NEI 98-03 (Reference 2), the Holtec International, "Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center" Revision 1O is a licensee controlled document that is explicitly "incorporated by reference" into the IP2 UFSAR. Under this approach , the referenced document is subject to the change control requirements of 10 CFR 50.59 and the update/reporting requirements of 10 CFR 50.71(e). The entire document is provided on Enclosure 2.

NL-18-069 Docket Nos. 50-24 7 Page 3 of 3 There are no new or revised commitments contained in this letter. In the event of any questions, please contact Mr. Robert W. Walpole , Manager, Regulatory Assurance at 914-254-6710.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on ~epktrtb-e-r 17, ;).0/'d Date Sincerely, AJV/gd Attachments:

1. Summary Report of IP2 UFSAR Revision 27 Changes
2. Summary of Revisions to the IP2 Technical Specification Bases
3. Summary of Revisions to the IP2 Technical Requirements Manual (TRM)
4. IP2 Commitment Change Summary Report

Enclosures:

1. DVD containing the IP2 Non-Redacted UFSAR (Rev. 27) files
2. DVD containing the IP2 Redacted UFSAR (Rev. 27) files, entire documents of the IP2 T.S . Bases, IP2 TRM, and Rev. 10 of the Holtec International Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at IPEC cc w/ enclosures:

Mr. Richard Guzman, Senior Project Manager, NRC NRR DORL cc w/o enclosure:

Mr. David Lew, Regional Administrator, NRC Region I Ms. Bridget Frymire, New York State Department of Public Service Ms. Alicia Barton, President and CEO, NYSERDA NRC Resident Inspectors

Attachment 1 to NL-18-069 Summary Report of IP2 UFSAR Revision 27 Changes ENTERGY NUCLEAR OPERATIONS, INC .

Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26

NL-18-069 Docket No. 50-247 Attachment 1 Page 1 of 3 Summary Report of IP2 UFSAR Revision 27 Changes AFFECTED SOURCE(S) of UFSAR PAGES, CHANGE, EC, INFORMATION/ DESCRIPTION OF CHANGES SECTION TABLE, 50.59, PAD, FIGURE SCREEN NOs CHAPTER 1 1.9.2 35 Editorial Addition of Revision 27 to the list of revisions 1.11.6 66 PAD Revision of the discussion that allows for the use of the Generic Implementation Procedure (GIP) methodology as an alternate method to existing methods for the seismic design and verification of modified , new, and replacement equipment to exclude. The write-up is this section of the UFSAR is being changed to note that the methodology can be used except for:

. Regulatory Guide 1.97 Category I items

. Waste Disposal System Containment Sump Level and Discharge Flow Transmitters.

. Passive Hydrogen Recombiners located at the 95-foot elevation of the containment.

CHAPTER 2 None CHAPTER 3 3.1.1 1 EC-70606 Incorporation of the Cycle 24 fuel and core design 3.2.3.2.1 .1 44 Editorial/ changes 3.2.3.2.1.4 53 Typographical 3.2.6 63 Table of 86

'3.2 F3.2-68A Figures' F3.2-688 CHAPTER 4 4.5.3 65 Typographical Changed section "5.3" to "4.5.3" CHAPTER 5 None CHAPTER 6 None

NL-18-069 Docket No. 50-247 Attachment 1 Page 2 of 3 Summary Report of IP2 UFSAR Revision 27 Changes AFFECTED SOURCE($) of UFSAR PAGES, CHANGE, EC, INFORMATION/ DESCRIPTION OF CHANGES SECTION TABLE, 50.59, PAD, FIGURE SCREEN NOs CHAPTER 7 7.2.5.1.20 51 EC-70606 Incorporation of the Cycle 24 fuel and core design changes 7.7 .3.3 106 UFSAR-only change Addition of a reference to the Technical Specification Bases B 3.3.4 for additional Function/Instrument or Control parameters located outside the control room that are required for Remote Shutdown by the Technical Specifications CHAPTER 8 8.2 F8.2-3 EC-58434, -58435 Revision of drawing to add the Open Phase Detection F8.2-15 System trip logic to the Unit 2 Station Auxiliary Transformer and the Gas Turbine 1 Autotransformer protection logic diagram - not enabled at this time CHAPTER 9 9.5 99 EC-73905 To reference the revision of the HOL TEC Shielded Transfer Canister (STC) Licensing Report Hl-2094289 that is currently in effect (Revision 10) 9.6.6 T9 .6-1 EC-73959 Installation of internal pipe mechanical seals at pipe weld connections within underground Service Water line #409 ORN 17-P620 for Calculation FMX-00295 RO CHAPTER10 10.2 F10.2-5 EC-78164 Addition of existing valves and newly created Equipment F10.2-7 IDs to UFSAR figures for isolation valves associated with P/1 transducers for MBFPs, 26A,B,C Feedwater Heaters, and the reheater drain tank 10.2.6.2 16 Drawings: Delete the statement "High discharge pressure reduces 9321-F-2019 turbine speed to prevent excessive pressure in the feed piping."

9321-3140 Sh. 7&12 0260531 CHAPTER 11 None

NL-18-069 Docket No. 50-247 Attachment 1 Page 3 of 3 Summary Report of IP2 UFSAR Revision 27 Changes AFFECTED SOURCE($) of UFSAR PAGES, CHANGE, EC, INFORMATION/ DESCRIPTION OF CHANGES SECTION TABLE, 50.59, PAD, FIGURE SCREEN NOs CHAPTER12 12.6 5,6 Editorial Ed itorial corrections regarding applicable paragraphs of 10 CFR 73.55, title of the approved plant security program ,

the correct code citation for withholding security plan documents from public disclosure (10 CFR 2.390(d)), the correct name of the Security Department, and deletion of Reference 1 CHAPTER13 None CHAPTER14 None Appendix A - License Renewal A.2.1.17 12, 13 SEP-ISI-IP2-001 R5, Update A to include information on the Fifth ISi Interval SEP-ISI-IP2-002 R2 ASME Section XI Code 2007 Edition through 2008 Addenda Drawings 5.1 , 6.2 , 7.2, 30 drawings Other Approval - Replacement of drawings with their current revisions 8.2, 9.2 , 9.3, -see listed drawings are 9.4, 9.6, LBDCR for Controlled 10.2 list documents

Attachment 2 to NL-18-069 Summary of Revisions to the IP2 Technical Specification Bases ENTERGY NUCLEAR OPERATIONS , INC.

Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26

NL-18-069 Docket Nos. 50-24 7 Attachment 2 Page 1 of 2 Summary of Revisions to the IP2 Technical Specification Bases (Since last reported September 19, 2016)

AFFECTED REV EFFECTIVE DESCRIPTION SECTION DATE BASES UPDATE PACKAGE 51 - 09302016 83.7 .13 5 09/30/2016 Added beginning material regarding non-conservative B 3.8.1 8 09/30/2016 Added beginning material regarding non-conservative.

Clarified SBO logic in revised paragraph BASES UPDATE PACKAGE 52 - 12062016 B 3.4.17 1 8/27/2015 TS Amendment 281 SG Inspection frequencies and tube sample selection BASES UPDATE PACKAGE 53 -10092017 B 3.4.12 4 10/9/2017 Editorial Change B 3.4.13 6 10/9/2017 Editorial Change B 3.4.15 5 10/9/2017 Editorial Change B 3.4.17 2 10/9/2017 Editorial Change B 3.7.10 8 10/9/2017 Editorial Change 83.7.13 6 10/9/2017 Editorial Change B 3.8.1 9 10/9/2017 Editorial Change B 3.9.3 2 10/9/2017 Editorial Change B 3.9.4 3 10/9/2017 EC-17512 B 3.9.5 3 10/9/2017 Editorial Change BASES UPDATE PACKAGE 54- 02012018 B 3.7.10 9 2/01/2018 Corrected discussion for Bases 3.7.10 Action C.1 to be consistent with LCO 3.7 .10 Condition C which is applicable for two CRVS trains inoperable for reasons other than Condition B

NL-18-069 Docket Nos. 50-24 7 Attachment 2 Page 2 of 2 Summary of Revisions to the IP2 Technical Specification Bases (Since last reported September 19, 2016)

AFFECTED REV EFFECTIVE DESCRIPTION SECTION DATE BASES UPDATE PACKAGE 55- 02132018 8 3.3.4 4 2/13/2018 Editorial Change 83.7.13 7 2/13/2018 TS Amendment 287 Inter-Unit Transfer of Spent Fuel Appendix C, 8 1 2/13/2018 TS Amendment 287 Inter-Unit Transfer of Spent Fuel 3.1.2 BASES UPDATE PACKAGE 56 - 04132018 8 3.2.4 1 4/13/2018 Revised discussion for Bases 3.2.4 Action A.1 to be consistent with TS Required Action 3.2.4.A.1 . and TSTF-549-T, Rev. 0 (LR-LAR-2017-00037 CA-1) 8 3.3.3 5 4/13/2018 Editorial Change (CR-IP2-2018-01099 CA-1) 8 3.3.7 3 4/13/2018 Editorial Change (CR-IP2-2018-01099 CA-2)

BASES UPDATE PACKAGE 57 - 04152018 8 3.3.4 5 4/15/2018 Table 83.3.4-1 Function 1.c Removed 21 MG Set & 22 MG Set Trip Switch as an "or option" since this function is not verified to be capable of performing the intended function in Function 3.i accordance with SR 3.3.4.2 Editorial

Attachment 3 to NL-18-069 Summary of Revisions to the IP2 Technical Requirements Manual (TRM)

ENTERGY NUCLEAR OPERATIONS, INC.

Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26

NL-18-069 Docket Nos. 50-24 7 Attachment 3 Page 1 of 3 Summary of Revisions to the IP2 Technical Requirements Manual (TRM)

(since last reported September 19, 2016)

AFFECTED NEW EFFECTIVE DESCRIPTION SECTIONS REV# DATE 3.7.G 3 9/15/2017 - Corrected the electrical power sources for PAB B 3.7 .G 3 Exhaust Fans 21 and 22 as shown on Bases B3.7.G , "Plant Auxiliary Building Ventilating System" page B3.7.G-1 in accordance with design drawings

- Corrected the term "PAB" from Plant Auxiliary Building to Primary Auxiliary Building 3.1 1.A 0 3/12/2018 Revised to add new requirements for B.5.b equipment B 3.11 .A 0 B 3.8.C 5 3/26/2018 Revised to correct various pages that were implemented 3.9.B 2 incorrectly B 3.9.B 3 5.0 14 TOC 16 4/4/2018 1. Removed in its entirety TRM 3.3.L, "Containment/

3.3.L 1 Recirculation Sump Level Indication ," as this TRM was added as an administrative control consistent B 3.3.L 2 with NRC Admin istrative Letter 98-10 until TS 3.3.3, B 3.4.D 3 Table 3.3.3-1 was revised. TS 3.3.3 has since been 3.7.E 3 revised by Amendment 270.

B 3.7.E 3 2. Added in the Bases for TRM B 3.4.D, "Containment 3.7.H Free Volume Leakage," a description of the 2

CHANNEL CALIBRATION requirements for TRS B 3.7.H 2 3.4.D.7 associated with the recirculation sump level B 3.8.B 4 monitors

3. Revised the description for TRS 3.7.H.1 in TRM 3.7.H, "Emergency Diesel Generator Ventilation System ," to be consistent with the description in the Bases
4. Revised the description for TRS 3.8.B.2 in TRM 3.8.B, "SBO / Appendix R Diesel Generator and Electrical Distribution System," to be consistent with the description in the Bases
5. Revised the description for TRS 3.7.E.4 in TRM 3.7.E, "City Water Supply," to delete the requirement to perform CHANNEL CALIBRATION on automatic fill instruments, and the description in the associated Bases

NL-18-069 Docket Nos. 50-24 7 Attachment 3 Page 2 of 3 Summary of Revisions to the IP2 Technical Requirements Manual (TRM)

(since last reported September 19, 2016)

AFFECTED NEW EFFECTIVE DESCRIPTION SECTIONS REV# DATE 3.9.B 3 4/15/2018 Corrected the surveillance requirement in TRM 3.9.B 3.1.B.1 3 4/30/2018 Corrected and/or otherwise clarified the Surveillance 3.1 .B.2 2 Requirements contained in TRM 3.1.B.1 , 3.1.B.2, and 3.8.B 3.8.B 4 TOC 17 7/28/2018 Revised to effect editorial corrections . Also to :

1.5 3 1. Add Section 3.9.E to the Table of Contents (TOC) 3.3.C 3 2. Add B 3.7.A-1 to the List of Effective Sections 3.3.K 1 B 3.3.K 2 B 3.3.L 3 B 3.7.A 3 3.7.D 5 B 3.7.D 5 B 3.7.E 4 B 3.7.G 4 B 3.7 .H 3 3.7.1 2 B 3.7.1 2 3.7.J 2 B 3.7.J 2 3.8.B 5 B 3.8.B 5 3.8.C 4 B 3.9.A 3 3.9.E 1 B 3.9.E 1 3.10.A 1 B 3.10.A 1 3.10.B 1 83.10.B 1 3.10.C 1 83.10.C 1

NL-18-069 Docket Nos. 50-24 7 Attachment 3 Page 3 of 3 Summary of Revisions to the IP2 Technical Requirements Manual (TRM)

(since last reported September 19, 2016)

AFFECTED NEW EFFECTIVE DESCRIPTION SECTIONS REV# DATE 3.11 .A 1 B 3.11.A 1

Attachment 4 to NL-18-069 IP2 Commitment Change Summary Report ENTERGY NUCLEAR OPERATIONS, INC.

Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26

NL-18-069 Docket Nos. 50-24 7 Attachment 4 Page 1 of 1 IP2 COMMITMENT CHANGE

SUMMARY

REPORT (Since last reported September 19, 2016)

COMMITMENT CURRENT CHANGED DESCRIPTION NUMBER STATUS DATE A-3088 Open 6/29/16 Original Commitment

Description:

WE HAVE A QA RADIOGRAPHIC PLAN IN PLACE, WHICH RANDOMLY INSPECTS 10% OF THE SERVICE WATER PIPING WELDS ANNUALLY Revised Commitment

Description:

WE HAVE A RADIOGRAPHIC PLAN IN PLACE. THIS PLAN PROVIDES AN APPROACH FOR EXAMINING CRITICAL WELDS THAT HAVE BEEN PREVIOUSLY IDENTIFIED AS HAVING EROSION IN THE PAST AS WELL AS EXAMINING NON SUSPECT WELDS AND PREVIOUSLY ACCEPTED WELDS . THE RADIOGRAPHIC INSPECTIONS/EXAMINATIONS OF THE SERVICE WATER PIPING WELDS TAKE PLACE DURING REFUELING OUTAGES.

ENCLOSURE 1 TO NL-18-069 INDIAN POINT ENERGY CENTER (IPEC)

UNIT 2, Docket No. 50-247 File Naming Table Document Title File Name Multiple File Document -

Indian Point 2 UFSAR, Rev. 27 1

Chapter 1, Introduction and Summary 001_ 1.1 Introduction and Summary.pdf Chapter 1, Figures

~---- ------- --

1001_ 1.2 Ch 1 Figures .pd_f _ __ _J Chapter 2, Site and Environment I002_2 .1 Site & Environment. pdf _J Chapter 2, Figures joo2_2 .2 Ch 2 Figures.pdf - --

Chapter 3, Reactor 003_3 .1 Reactor.pdf Chapter 3, Figures ioo3_3.2 Ch 3 Figures.pdf Chapter 4, Reactor Coolant System 004_4.1 Reactor Coolant Sys.pdf r--

Chapter 4 , Figures


-- - - ~ -

004_4 .2 Ch 4 Figures.pdf _J Chapter 4 , Plant Drawings I004_4 .3 Ch 4 Drawings.pdf Chapter 5, Containment Systems 005_5 .1 Containment Sys.pdf 005_5 .2 Ch 5 Figures - NON-Chapter 5, Figures - NON-REDACTED I REDACTED .pdf Chapter 5, Plant Drawings - NON- 005_5.3 Ch 5 Drawings - NON-REDACTED REDACTED.pdf

. i Chapter 6 , Engineered Safety Features i006_6 .1 Engineered Safety Features .pdf I006_6.2 Ch 6 Figures - NON-Chapter 6 , Figures - NON-REDACTED REDACTED .pdf I Chapter 6 , Plant Drawings I006_6.3 Ch 6 Drawings.pdf Chapter 7, Instrumentation and Control I007 _7 .1 Instrumentation & Control.pdf Chapter 7 , Figures 007 _7 .2 Ch 7 Figures.pdf Chapter 7, Plant Drawings joo7 _7.3 Ch 7 Drawings.pdf Chapter 8 , Electrical Systems 008_8 .1 Electrical Systems.pdf Chapter 8 , Figures ioo8_8 .2 Ch 8 Figures.pdf ------4 1

Chapter 8 , Plant Drawings I008_8 .3 Ch 8 Drawings .pdf -----

Chapter 9, Auxil iary and Emergency Systems 009_9 .1 Auxiliary and Emergency 1

Sys.pdf Chapter 9 , Figures ,009_9 .2 Ch 9 Figures .pdf Chapter 9, Plant Drawings /009_9 .3 Ch 9 Drawings .pdf Page 1 of 2

ENCLOSURE 1 TO NL-18-069 INDIAN POINT ENERGY CENTER (IPEC)

UNIT 2 1 Docket No. 50-247

~----

File Naming Table (continued)

_J Document Title File Name Multiple File Document -

Indian Point 2 UFSAR, Rev. 25 Chapter 10, Steam and Power Conversion 010_10.1 Steam and Power Conversion System 1Sys.pdf '

Chapter 10, Figures 1010_10.2 Ch 10 Figures.pdf Chapter 10, Plant Drawings 1010_10.3 Ch 10 Drawings.pdf Chapter 11, Waste Disposal and Radiation IO11 _ 11 .1 Waste Disposal and Rad Protection System Protection Sys.pdf Chapter 11, Figures 011_11 .2 Ch 11 Figures.pdf

,---- - - - - - - - - - - - -- _J Chapter 11 , Plant Drawings 1 011_ 11.3 Ch 11 Drawings.pdf Chapter 12, Conduct of Operations 012_ 12.1 Conduct of Operations.pdf Chapter 13, Tests and Operations 013_ 13.1 Tests and Operations.pdf Chapter 14, Safety Analysis ---.-1014_ 14.1 Safety Analysis .pdf

-- I Chapter 14, Section 14.1 Figures -!. 014_ 14.2 Ch 14.1 Figures .pdf _ _

-j Chapter 14, Section 14.2 Figures 014_ 14.3 Ch 14.2 Figures.pdf I I

Chapter 14, Section 14.3 Figures 1014_14.4 Ch 14.3 Figures.pdf Appendix A, License Renewal - + - ;0_1_

5_ 15 1 _A_p_

p _A_, _

Li_c _R_e_ne

_w_a_l_

.p_df_ _ ___.!

Instructions and Key

- - - - - - - ~ -- ---

016_16.1 Instructions and Key.pdf I

Table of Contents ,017 _ 17.1 TOC.pdf Page 2 of 2

ENCLOSURE 2 TO NL-18-069 INDIAN POINT ENERGY CENTER (IPEC)

UNIT 2, Docket No. 50-247 File Naming Table Document Title File Name Multiple File Document -

Indian Point 2 UFSAR, Rev. 27 II 001_1.1 Introduction and Chapter 1, Introduction and Summary Summary.pdf Chapter 1, Figures ----j0-0-1_- 1___2 _C_h_1_F_i-gu_r_e-s.-pd- f- - - - ~

Chapter 2, Site and Environment I002_2 .1 Site & Environment.pdf I

Chapter 2, Figures I 002_2.2 Ch 2 Figures.pdf Chapter 3, Reactor I003_3.1 Reactor.pdf Chapter 3, Figures I003_3.2 Ch 3 Figures.pdf Chapter 4, Reactor Coolant System 004_4.1 Reactor Coolant Sys.pdf 1

Chapter 4, Figures 004_4.2 Ch 4 Figures.pdf I

Chapter 4, Plant Drawings 004_4.3 Ch 4 Drawings.pdf Chapter 5, Containment Systems loo5_5 .1 Containment Sys.pdf

~------- -- -

I 005_5.2 Ch 5 Figures -

Chapter 5, Figures - REDACTED

,REDACTED.pdf

- - --r- ------4 005 5.3 Ch 5 Drawings -

Chapter 5, Plant Drawings - REDACTED I REDACTED .pdf r---

1 006_6.1 Engineered Safety Chapter 6, Engineered Safety Features IFeatures.pdf 1 006_6.2 Ch 6 Figures -

Chapter 6, Figures - REDACTED IREDACTED.pdf Chapter 6, Plant Drawings j006_6.3 Ch 6 Drawings.pdf Chapter 7, Instrumentation and Control 007 _7 .1 Instrumentation & Control.pdf I Chapter 7, Figures loo7 _7.2 Ch 7 Figures.pdf i Chapter 7, Plant Drawings 007 _7.3 Ch 7 Drawings.pdf _J


1 Chapter 8, Electrical Systems 008_8.1 Electrical Systems. ~

Chapter 8, Figures 008_8.2 Ch 8 Figures.pdf Chapter 8, Plant Drawings 008_8.3 Ch 8 Drawings.pdf 009_9.1 Auxiliary and Emergency Chapter 9, Auxiliary and Emergency Systems 1

Sys.pdf Chapter 9, Figures ~ 9_9.2 Ch 9 Fi_g_u r_e_s_.p_df_ _ _ ___,

Chapter 9, Plant Drawings 009_9.3 Ch 9 Drawings.pdf Page 1 of 2

ENCLOSURE 2 TO NL-18-069 INDIAN POINT ENERGY CENTER (IPEC)

UNIT 2, Docket No. 50-247 File Naming Table (continued) I Document Title / File Name I Multiple File Document - I

~C_h_a_p-te_r_1_0_, S System

_ t_e_a_m_a_n_d_P Indian Point 2 UFSAR, Rev. 25

_o_w_e_r_C_o_n_v-e r-sion T 10_ 10.1 Steam and Power IConversion Sys.pdf J

- - - --r- * - - -

Chapter 10, Figures 1010_10.2 Ch 10 Figures.pdf Chapter 10, Plant Drawings 010_10.3 Ch 10 Drawings.pdf Chapter 11 , Waste Disposal and Radiation 011_ 11 .1 Waste Disposal and Rad Protection System

  • Protection Sys.pdf Chapter 11 , Figures 011_ 11.2 Ch 11 Figures.pdf Chapter 11 , Plant Drawings 011_ 11 .3 Ch 11 Drawings.pdf
  • r:-:: - -- - -- - ___,

Chapter 12, Conduct of Operations 012_ 12.1 Conduct of Operations.pdf Chapter 13, Tests and Operations io13_13 .1 Tests and Operations.pdf I

Chapter 14, Safety Analysis 1014_14.1 Safety Analysis .pdf Chapter 14, Section 14.1 Figures 014_ 14.2 Ch 14.1 Figures.pdf Chapter 14, Section 14.2 Figures T:

014_ 14.3 Ch 14.2 Figures.pdf Chapter 14, Section 14.3 Figures 1 014_ 14.4 Ch 14.3 Figures.pdf

-r* - -

Appendix A, License Renewal J 015_ 15.1 App A , Lie Renewal.pdf Instructions and Key O16_ 16 .1 Instructions and Key.pdf Table of Contents 1017_17.1 TOC .pdf Single File Documents Indian Point 2 Technical Requirements Manual 1001_1P2 TRM 7-28-18.pdf (TRM)

Indian Point 2 Technical Specification Bases 002_1 P2 Tech Spec Bases R57. pdf Holtec Licensing Report on the Inter-Unit 1003_Holtec Licensing Report R1 O.pdf Transfer of Spent Nuclear Fuel Page 2 of 2