ML13291A290

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report (Ufsar), Revision 24 for License Renewal and Period of Extended Operation
ML13291A290
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/26/2013
From: Dacimo F
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-13-130
Download: ML13291A290 (4)


Text

mEntegy Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6700 Fred Dacimo Site Vice President Administration NL-13-130 September 26, 2013 U.S. Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738

Subject:

Indian Point 2 Nuclear Power Plant Amendment Update to the Updated Final Safety Analysis Report (UFSAR), Revision 24 for License Renewal and Period of Extended Operation Indian Point, Unit 2 Docket No. 50-247 License No. DPR-26 Indian Point Energy Center letters to NRC, License Renewal Application, dated April 23, 2007

Reference:

Dear Sir or Madam:

Pursuant to 10 CFR 51 and 10 CFR 54, Entergy Nuclear Operations, Inc. (Entergy)submitted the referenced letters applying for renewal of the operating license for Indian Point Energy Center (IPEC) Unit 2 to extend the license for an additional 20 years beyond the current expiration date. On September 28, 2013 at midnight Indian Point Unit 2 will enter the Period of Extended Operations (PEO) because the license renewal proceedings have not yet been completed.

Entergy) hereby transmits an update to the Updated Final Safety Analysis Report (UFSAR) for Indian Point Unit 2. This UFSAR change incorporates the IPEC Unit 2 License Renewal Application (LRA) Appendix A, UFSAR Supplement in accordance with the NRC commitment NL-13-071.

Appendix A of the License Renewal Application is divided into two parts. The first part identifies changes to the existing sections of the UFSAR related to license renewal. The second part provides new information to be incorporated in the UFSAR as a new section, Appendix A. This submittal incorporates only applicable changes made to the Indian Point Unit 2 facility for License Renewal and constitutes the twenty forth (24)revision to the Indian Point Unit 2 UFSAR.The UFSAR changes to the text and tables are indicated by gray highlighted background rather than a revision bar next to the line containing the change. This update to the UFSAR also contains information that has been classified as "Historical" information and is no longer subject to updating.

Material designated as "Historical" information in the UFSAR is indicated by a green highlighted background.

Atz'A)55 Indian Point Unit 2 Docket No. 50-247 NL-13-130 Page 2 of 2 Entergy is making no new commitments in this letter.Should you or your staff have any questions regarding this submittal, please contact Mr.Robert Walpole, Manager, Licensing, Indian Point Energy Center (IPEC) at (914) 254-6710.I declare under penalty of perjury that the foregoing is true and correct.Executed on -111, , Date FD/cbr

Enclosure:

CD-ROM containing the Indian Point Unit 2 UFSAR (Rev. 24) files cc: NRC Resident Inspector's Office (w/o enclosure)

Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL (w/o enclosure)

Mr. William M. Dean, Regional Administrator, NRC Region 1 (w/o enclosure)

Mr. Francis J. Murray, Jr., President and CEO, NYSERDA (w/o enclosure)

Ms. Bridget Frymire, NYS Department of Public Service (w/o enclosure)

INDIAN POINT ENERGY CENTER (IPEC)UNIT 2. Docket No. 50-247 September 2013 File Naming Table Document Title File Name Multiple File Document -Indian Point 2 UFSAR, Rev. 24 Chapter 1, Introduction and Summary 1001_1.1 Introduction and Summary.pdf Chapter 1, Figures 001_1.2 Ch 1 Figures.pdf Chapter 2, Site and Environment 1002_2.1 Site and Environment.pdf Chapter 2, Figures 002_2.2 Ch 2 Figures.pdf Chapter 3, Reactor 003_3.1 Reactor.pdf Chapter 3, Figures 003_3.2 Ch 3 Figures.pdf lChapter 4, Reactor Coolant System 004_4.1 Reactor Coolant Sys.pdf Chapter 4, Figures 004_4.2 Ch 4 Figures.pdf Chapter 4, Plant Drawings 004_4.3 Ch 4 Drawings.pdf Chapter 5, Containment Spray System 1005-5.1 Containment Spray Sys.pdf Chapter 5, Figures 1005_5.2 Ch 5 Figures.pdf JChapter 5, Plant Drawings 1005-5.3 Ch 5 Drawings.pdf ,Chapter 6, Engineered Safety Features 006_6.1 Engineered Safety Features.pdf JChapter 6, Figures 006_6.2 Ch 6 Figures.pdf Chapter 6, Plant Drawings [006_6.3 Ch 6 Drawings.pdf 1 Chapter 7, Instrumentation and Control [007_7.1 Instrumentation

& Control.pdf JChapter 7, Figures 1007_7.2 Ch 7 Figures.pdf Chapter 7, Plant Drawings 007_7.3 Ch 7 Drawings.pdf ,Chapter 8, Electrical Systems 1008_8.1 Electrical Systems.pdf Chapter 8, Figures 1008-8.2 Ch 8 Figures.pdf Chapter 8, Plant Drawings 1008-8.3 Ch 8 Drawings.pdf Chapter 9, Auxiliary and Emergency 0099.1 Auxiliary and Emergency Sys.pdf Systems Chapter 9, Figures 1009 9.2 Ch 9 Figures.pdf

'Chapter 9, Plant Drawings 009_9.3 Ch 9 Drawings.pdf ,Chapter 10, Steam and Power Conversion 010_10.1 Steam and Power Conversion 0 .System Sys.tpdf I Chapter 10, Figures 010_10.2 Ch 10 Figures.pdf I

Chapter 10, Plant Drawings 1010 _10.3 Ch 10 Drawings.pdf Chapter 11, Waste and Radiation Protection 1011 _11.1 Waste and Rad Protection System j Sys.pdf Chapter 11, Figures 1011_11.2 Ch 11 Figures.pdf Chapter 11, Plant Drawings 011_11.3 Ch 11 Drawings.pdf Chapter 12, Conduct of Operation 101212.1 Conduct of Operation.pdf Chapter 12, Figures 1012_12.2 Ch 12 Figures.pdf Chapter 13, Test and Operation 1013_13.1 Test and Operation.pdf Chapter 14, Safety Analysis 014_14.1 Safety Analysis.pdf Chapter 14, Section 14.1 Figures 014_14.2 Ch 14.1 Figures.pdf Chapter 14, Section 14.2 Figures 01414.3 Oh 14.2 Figures.pdf Chapter 14, Section 14.3 Figures 014_14.4 Ch 14.3 Figures.pdf Unit 2 License Renewal Appendix A 1015_15.1 Lip Renewal App A.pdf Information Key 1016_16.1 Information Key.pdf Table of Contents (TOC) 101717.1 TOC.pdf 2