ML17097A445: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  April 5, 2017  Mr. George Lippard III, Vice President Nuclear Operations  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  April 5, 2017  Mr. George Lippard III, Vice President Nuclear Operations  
South Carolina Electric & Gas Company  
South Carolina Electric & Gas Company  
Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC  29065  SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED  OPERATOR INITIAL EXAMINATION 05000395/2017301   
Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC  29065  SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED  OPERATOR INITIAL EXAMINATION 05000395/2017301   
Line 57: Line 57:
cc:  Distribution via Listserv  
cc:  Distribution via Listserv  


_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE DXB2 GXG      NAME BACON GUTHRIE      DATE 4/5/2017 4/5/2017 8/    /2017 8/    /2017 8/    /2017 8/    /2017 8/    /2017 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    
_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE DXB2 GXG      NAME BACON GUTHRIE      DATE 4/5/2017 4/5/2017 8/    /2017 8/    /2017 8/    /2017 8/    /2017 8/    /2017 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO
 
}}
}}

Revision as of 22:36, 18 May 2018

Virgil C. Summer - Notification of Licensed Operator Initial Examination 05000395/2017301
ML17097A445
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/05/2017
From: Guthrie E F
NRC/RGN-II/DRS/EB2
To: Lippard G
South Carolina Electric & Gas Co
References
50-395/17-301
Download: ML17097A445 (4)


See also: IR 05000395/2017301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 5, 2017 Mr. George Lippard III, Vice President Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000395/2017301

Dear Mr. Lippard: During a meeting on March 16, 2017, between Mr. Robert Johnston, Lead Developer, and

Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration

of licensing examinations at the Virgil C. Summer (Unit 1) Nuclear Station. The operating test is

scheduled to be administered during the week of September 18, 2017. The written examination

is scheduled to be administered the week of September 25, 2017. The on-site preparatory week is scheduled for the week of August 28, 2017.

As agreed during the meeting, your staff will prepare both the operating test and written

examination based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

Your staff provided the NRC regional office with the operating test outlines on December 15, 2016. Mr. Mark Bates provided the written examination outline to your staff on September 29, 2016. The operating test, written examination, and the supporting reference materials identified

in Attachment 3 to ES-201 will be due by July 12, 2017. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations before they are submitted

to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

G. Lippard 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 60 days before the first examination date. If the applications are not

received at least 60 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response,

including the time for reviewing instructions, gathering and maintaining the data needed, writing

the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to

the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

G. Lippard 3 Thank you for your cooperation in this matter. Mr. Johnston has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at (404) 997-4518, (Internet E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). Sincerely,

/RA/ Eugene F. Guthrie, Chief Operations Branch 2

Division of Reactor Safety

Docket No.: 50-395 License No.: NPF-12

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 GXG NAME BACON GUTHRIE DATE 4/5/2017 4/5/2017 8/ /2017 8/ /2017 8/ /2017 8/ /2017 8/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO