| Semor Vice President Flintridge Building Alabar, tbwei tte souttuvn aminc sys:em | | Semor Vice President Flintridge Building Alabar, tbwei tte souttuvn aminc sys:em |
| -March 1, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 1 and 2 Charcoal Filter Technical Specifications Gentl emen: | | -March 1, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 1 and 2 Charcoal Filter Technical Specifications Gentl emen: |
| Alabama Power Company letter dated March 4,1983 requested a technical specification change regarding charcoal filter surveillance | | Alabama Power Company {{letter dated|date=March 4, 1983|text=letter dated March 4,1983}} requested a technical specification change regarding charcoal filter surveillance |
| -testing. Subsequent discussions with the NRC Staff has resulted in an agreement to supplement the March 4,1983 letter and revise some of the proposed technical specification changes. Contained herein is the supplemented technical specification change request and associated bases. | | -testing. Subsequent discussions with the NRC Staff has resulted in an agreement to supplement the {{letter dated|date=March 4, 1983|text=March 4,1983 letter}} and revise some of the proposed technical specification changes. Contained herein is the supplemented technical specification change request and associated bases. |
| The current Farley Nuclear Plant Technical Specifications on charcoal filters have been difficult to interpret and contain references to testing standards that have been superseded by later editions. In an effort to clarify and update the technical specifications, Alabama Fower Company proposes changes as described in Attachment 1 and contained in Attachment 2. | | The current Farley Nuclear Plant Technical Specifications on charcoal filters have been difficult to interpret and contain references to testing standards that have been superseded by later editions. In an effort to clarify and update the technical specifications, Alabama Fower Company proposes changes as described in Attachment 1 and contained in Attachment 2. |
| The proposed changes can be categorized as follows: | | The proposed changes can be categorized as follows: |
Line 39: |
Line 39: |
| Based on the above and the detailed discussion contained in Attachment 1, Alabama Power Company proposes to make changes to the Farley Nuclear Plant Technical Specifications 3/4.7.7, 3/4.7.8 and 3/4.9.14 as contained in Attachment 2. Alabama Power Company's Plant Operations Review Committee has reviewed these proposed changes. The Nuclear Operations Review Board will review these proposed changes at a future meeting. | | Based on the above and the detailed discussion contained in Attachment 1, Alabama Power Company proposes to make changes to the Farley Nuclear Plant Technical Specifications 3/4.7.7, 3/4.7.8 and 3/4.9.14 as contained in Attachment 2. Alabama Power Company's Plant Operations Review Committee has reviewed these proposed changes. The Nuclear Operations Review Board will review these proposed changes at a future meeting. |
| This proposed change does not involve a Significant Hazards Consideration as defined in 10CFR50.92. This change is similar to er. ample (vi) of " Examples of Amendments That Are Considered Not Likely to Involve Significant Hazards Considerations" listed in 48FR14870 dated April 6, 1983. . This change is similar in that the intent of all acceptance criteria are met as specified in the Standard Review Plan with respect to charcoal filters. | | This proposed change does not involve a Significant Hazards Consideration as defined in 10CFR50.92. This change is similar to er. ample (vi) of " Examples of Amendments That Are Considered Not Likely to Involve Significant Hazards Considerations" listed in 48FR14870 dated April 6, 1983. . This change is similar in that the intent of all acceptance criteria are met as specified in the Standard Review Plan with respect to charcoal filters. |
| The class of this proposed change is designated as Class III for Unit 1 and Class I .for Unit 2 in accordance with 10CFR170.22 requirements. A check for $4,400 to cover the total amount of fees required was included with the March 4,1983 letter. In accordance with the 1984 Alabama Power Company licensing plan previously discussed with the NRC Staff, NRC approval of this change is requested by May 1, 1984. | | The class of this proposed change is designated as Class III for Unit 1 and Class I .for Unit 2 in accordance with 10CFR170.22 requirements. A check for $4,400 to cover the total amount of fees required was included with the {{letter dated|date=March 4, 1983|text=March 4,1983 letter}}. In accordance with the 1984 Alabama Power Company licensing plan previously discussed with the NRC Staff, NRC approval of this change is requested by May 1, 1984. |
| p , .s | | p , .s |
|
| |
|
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
g- .
Melling Address Allbama Pow 2r Corepany 600 North 18th Street 1 Post Office Box 2641 Birmingham. Atabama 35291
- Telephone 205 7124W81 F. L Clayton, Jr.
Semor Vice President Flintridge Building Alabar, tbwei tte souttuvn aminc sys:em
-March 1, 1984 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 1 and 2 Charcoal Filter Technical Specifications Gentl emen:
Alabama Power Company letter dated March 4,1983 requested a technical specification change regarding charcoal filter surveillance
-testing. Subsequent discussions with the NRC Staff has resulted in an agreement to supplement the March 4,1983 letter and revise some of the proposed technical specification changes. Contained herein is the supplemented technical specification change request and associated bases.
The current Farley Nuclear Plant Technical Specifications on charcoal filters have been difficult to interpret and contain references to testing standards that have been superseded by later editions. In an effort to clarify and update the technical specifications, Alabama Fower Company proposes changes as described in Attachment 1 and contained in Attachment 2.
The proposed changes can be categorized as follows:
- 1. Incorporation of Specific Efficiency Requirements. The current technical specifications reference NRC Regulatory Guide 1.52, Revision 2, rather than stating specific filter efficiency requirements. Since Regulatory Guide 1.52, Revision 2, is difficult to interpret, the proposed technical specification change removes the regulatory guide reference and replaces it with specific efficiency values based on FSAR values and recent NRC interpretations. This change will ensure that the appropriate requirements are incorporated into the Farley Nuclear Plant testing procedures.
f olo 8403130031 840301 PDR ADOCK 05000348 p PDR
, 8j
[
L
p Mr. S. A. Varga March 1,1984 Nuclear Regulatory Conunission Page 2
- 2. Elimination of Surveillance Requirements for Non-Existent Farley Design Features. The current technical specifications are based on filter systems designed with filter bypass capability. Since the Farley Nuclear Plant design does not include filter bypass capability, the proposed change eliminates all filter bypass requirements.
- 3. Update of References to ANSI Standards. The current technical specifications reference ANSI N509-1976, " Nuclear Power Plant Air Cleaning Units and Components," and N510-1975, " Testing of Nuclear Air Cleaning Systems." The NRC has endorsed the use of ANSI N509-1980 and N510-1980 in the Standard Review Plan (NUREG-0800). The 1980 versions of these ANSI standards are, therefore, NRC approved updates of charcoal filter test methods. The proposed change references the 1980 standards and will update the charcoal filter testing methods at the Farley Nuclear Plant to reflect the latest guidance.
Based on the above and the detailed discussion contained in Attachment 1, Alabama Power Company proposes to make changes to the Farley Nuclear Plant Technical Specifications 3/4.7.7, 3/4.7.8 and 3/4.9.14 as contained in Attachment 2. Alabama Power Company's Plant Operations Review Committee has reviewed these proposed changes. The Nuclear Operations Review Board will review these proposed changes at a future meeting.
This proposed change does not involve a Significant Hazards Consideration as defined in 10CFR50.92. This change is similar to er. ample (vi) of " Examples of Amendments That Are Considered Not Likely to Involve Significant Hazards Considerations" listed in 48FR14870 dated April 6, 1983. . This change is similar in that the intent of all acceptance criteria are met as specified in the Standard Review Plan with respect to charcoal filters.
The class of this proposed change is designated as Class III for Unit 1 and Class I .for Unit 2 in accordance with 10CFR170.22 requirements. A check for $4,400 to cover the total amount of fees required was included with the March 4,1983 letter. In accordance with the 1984 Alabama Power Company licensing plan previously discussed with the NRC Staff, NRC approval of this change is requested by May 1, 1984.
p , .s
~ Mr. S. A. Varga _
March 1, 1984 Nuclear Regulatory Commission Page 3 In accordance with 10CFR50.90, three (3) signed originals and 40 additional copies of this proposed change are enclosed. As noted by the distribution, a copy of the letter is being sent to the Alabama State Designee in accordance with 10CFR50.91 (b)(1).
1 Yours very truly,
- ) -/"
. a on, J FLCJ r/CJS:grs-D43 SWORN T0 TA:D SUBSCRIBED BEFORE ME Attachments THIS / "S DAY OF jfacx,1984 cc: Mr. R. A. Thomas Mr. J. P. O'Reilly [d /L /.,fw /
Mr. E. A. Reeves --' Ndtary PuYlic
- Mr. W. H. Bradford Dr. I. i. Myers My Commission Expires: jo,d y/As-e f
f
~- 1 1
ATTACHMENT 1 DISCUSSION OF PROPOSED CHANGES TO FNP-1 AND 2 TECHNICAL SPECIFICATIONS SECTIONS 4.7.7, 4.7.8, AND 4.9.14 Background Discussion NRC Regulatory Guide 1.52, Revision 2, dated March 1978, provides reconsnended guidelines for testing requirements and acceptance criteria of safety-related filters. Testing of the Control Room Emergency Ventilation System and the Penetration Room Filtration System is performed in accordance with Technical Specifications 4.7.7 and 4.7.8 respectively. Testing of the Containment Purge Exhaust Filter is performed in accordance with Technical Specification 4.9.14. As written, these technical specifications do not fully reflect the appropriate testing requirements that should be implemented based on actual plant design. In addition, clarification of the requirements of Regulatory Guide 1.52, Revision 2, is necessary in order to assure proper implementation of the regulatory guide reconsnendations. Al so, Regulatory Guide 1.52, Revision 2, references ANSI N509-1976 and ANSI N510-1975 as standards for testing a'ir cleaning systems for nuclear power plants. These standards have been superseded by ANSI N509-1990 and ANSI N510-1980 and endorsed by the IGC in the Standard Review Plan (NUREG-0800). Therefore, a change to Farley Nuclear Plant Unit 1 and 2 Technical Specifications 4.7.7, 4.7.8 and 4.9.14 is requested to incorporate these improvements.
Discussion of Specific Changes The following provides the bases for the proposed technical specification changes by paragraphs.
Technical Specification 4.7.7 Paragraph c.1: The Standard Technical Specifications (NUREG-0452) allow up to one percent leakage through a filter system if bypass piping is installed around the filters. Farley Nuclear Plant does not have filter bypass provisions, and therefore, total system leakage is equal to the leakage through the HEPA and charcoal absorbers (i.e., filter penetration for HEPA filters and bypass leakage through the absorber section for activated charcoal). When the filters are tested for penetration or leakage, the acceptance criteria of Regulatory Guide 1.52, Sections C.5.c and C.S.d, are applicable. This requires a filter penetration of less than 0.05 percent and a maximum of 0.05 percent bypass leakage through the adsorber section. As discussed with the NRC Staff, this criteria requires a 99.95 percent efficient filter which is overly restrictive. In accordance with recommendations i
Attachment 1 Discussion Page 2 from the NRC Staff, the proposed testing acceptance criteria for filter penetration for Technical Specification 4.7.7.c.1 is less than or equal to 0.5 percent filter penetration or adsorber section bypass leakage (i.e., 99.5% efficient filter and absorber) . Reference to Regulatory Guide 1.52, Revision 2, has been replaced with the specific testing requirements and acceptance criteria applicable to the FNP filters. In addition, reference to ANSI N510-1975 has been replaced with ANSI N510-1980, Sections 5,10 and 12, for clarification in accordance with the Standard Review Plan.
Paragraph c.2: Reference to Regulatory Guide 1.52, Revision 2, has been replaced with specific testing requirements and acceptance criteria from the regulatory guide which is applicable to the FNP filters. Note 2 is proposed to clarify the efficiency limits for the charcoal filters. As stated in FSAR Section 9.4.1.6, the following efficiencies for the charcoal filters were assumed for the Post-LOCA control room doses:
a) Control Room Recirculation Filter Unit 95.0%
b) Control Room Filter 95.0%
c) Control Room Pressurization (Inlet)
Filter Unit 95.0%
In accordance with Regulatory Guide 1.52, Revision 2, in order to assume the above efficiencies, laboratory analyses oust demonstrate the following efficiencies for the charcoal filters.
a) Control Room Recirculation Filter Unit 99.0%
(2 inch sample size) b) Control Room Filter Unit 99.0%
(2 inch sample size) c) Control Room Pressurization (Inlet) 99.825%
Filter Unit (4 inch or greater sample size)
Therefore, the laboratory analyses criteria are specifically stated in Technical Specification 4.7.7.c.2 rather than simply referencing Regulatory Guide 1.52.
Paragraph c.3: Reference to ANSI N510-1975 has been replaced with ANSI N510-1980, Section 8, for clarification in accordance with the Standard Review Plan.
Attachment 1 Discussion Page 3 Paragraph d: Same change and Justification as provided above for changes to Paragraph 4.7.7.c.2.
Paragraph e.4: Reference to ANSI N510-1975 has been replaced with AKSI N510-1980, Section 14, for clarification in accordance with the Standard Review Plan.
Paragraph f: Same change and justification as provided above for changes to paragraph 4.7.7.c.1. regarding filter penetration testing.
Reference to ANSI N510-1979 has been replaced with ANSI N510-1980, Section 10, for clarification in accordance with the Standard Review Plan.
Paragraph g: Same change and justification as provided above for changes to paragraph 4.7.7.c.1. regarding filter penetration testing.
Reference to ANSI N.510-75 has been replaced with ANSI N510-80, Section 12, for clarification purposes.
Technical Specification 4.7.8 Paragraph b.1: Same change and justification as provided above for changes to Paragraph 4.7.7.c.1.
Paragraph b.2: Reference to Regulatory Guide 1.52, Revision 2, has been replaced with specific testing requirements and acceptance criteria from the regulatory guide which is applicable to the Farley Nuclear Plant filters. Accordingly, Section 13 of ANSI N510-1980 has been referenced for the testing requirements.
With resrect to the acceptance criteria, an efficiency of 90% was assumed for the charcoal filter in the spent fuel handling accident by the NRC confimatory analysis described in the SER
! (NUREG-0117). In accordance with the regulatory l guide, in order to assume this efficiency the laboratory analysis must demonstrate a charcoal efficiency of 95% (2 inch sample size).
Paragraph b.3: Reference to ANSI N510-1975 has been replaced with ANSI'N510-1980, Section 8, for clarification in i accordance with the Standard Review Plan.
l
Attachment 1-
' Discussion Page 4.
' Paragraph e: Same change and justification as provided above for changes to Paragraph 4.7.7.f..
Paragraph f: Same change 'and' justification as providad above for changes to Paragraph 4.7.7.g.
Technical Specification 4.9.14 Paragraph a.1: This specification has been deleted because the
'Farley Nuclear Plant does not have bypass piping installed around the containment purge exhaust fil ters.
Paragraph a.2: Same change and justification as provided above for .
changes to Paragraph 4.7.7.c.1. This paragraph has been changed to be paragraph a.1.
Paragraph a.3: Reference to Regulatory Guide 1.52, Revision 2, has been replaced with ANSI N510-1980, Section 13, for clarification in accordance with the Standard Review Plan. The laboratory testing criteria of greater than or equal to 90% efficiency has been stated for clarification purposes and is in accordance with NRC Staff recommendations. A 90%
efficiency acceptance criteria is extremely conservative since the fuel handling accident inside containment analysis assumed a 70%
efficiency as stated in FSAR Section 15.4.5.2 This paragraph has been changed to be paragraph a.2.
Paragraph b: Same change and justification as provided above for changes to Paragraph 4.9.14.a.3.
Paragraph d: Same change and justification as provided above for changes to Paragraph 4.7.7.f.
Paragraph e: Same change and justification as provided above for changes to Paragraph 4.7.7.g.
l GGY:grs-D43 I
ATTACHENT 2 1
Proposed Technical Specification Changes i Unit 1 Pages 3/4 7-16 3/4 7-17 3/4 7-17a 3/4 7-18 3/4 7-19 3/4 9-17 3/4 9-18 Unit 2 Pages 3/4 7-16 3/4 7-17 3/4 7-17a 3/4 7-18 3/4 7-19 3/4 9-17 3/4 9-18 h