|
|
Line 1: |
Line 1: |
| #REDIRECT [[IR 05000289/1987016]]
| | {{Adams |
| | | number = ML20236S982 |
| | | issue date = 11/16/1987 |
| | | title = Insp Rept 50-289/87-16 on 871020-23.No Violations Noted. Major Areas Inspected:Licensee Full Participation Annual Emergency Preparedness Exercise & Training Records for Emergency Response Organization.Response Actions Adequate |
| | | author name = Amato C, Fox E, Lazarus W |
| | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| | | addressee name = |
| | | addressee affiliation = |
| | | docket = 05000289 |
| | | license number = |
| | | contact person = |
| | | document report number = 50-289-87-16, NUDOCS 8711300218 |
| | | package number = ML20236S949 |
| | | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS |
| | | page count = 5 |
| | }} |
| | See also: [[see also::IR 05000289/1987016]] |
| | |
| | =Text= |
| | {{#Wiki_filter:- - _ - _ - _ |
| | . |
| | ! ,' |
| | .- |
| | . |
| | U. S. NUCLEAR REGULATORY COMMISSION |
| | REGION I |
| | [ ' Report No.- 50-289/87-16 3 |
| | 1 |
| | Docket No. .50-289 ) |
| | License No. DPR-50 Priority -- Category C- |
| | Licensee: GPU. Nuclear Corporation |
| | l: Post Office Box 480 |
| | ' |
| | Middletown, Pennsylvania 17057-0191 |
| | Facility Name: Three Mile Island Unit 1 |
| | l |
| | Inspection At: Middletown, Pennsylvania |
| | Inspection Conducted: October 20-23, 1987 |
| | Inspectors: -ft L M / Ke M (s w / n/ /t /r 7 |
| | C. G. Amato, EPS, EPRPB, DRSS date |
| | $.c A b P f%.la ( f.m) o r l /4 /*7 |
| | E. F. Fox., Sr. EPS, EP&RPB, DRSS date |
| | NRC Team Members: K. Christopher, Region I |
| | R. Conte, SRI, TMI-1 |
| | C.-Gordon, Region I |
| | J. Jamison, Battelle PNL |
| | D. Johnson, Region I |
| | T. Tuccinardi, Region I |
| | Approved by: //ca/h r64i M/ /,hd/ 7 |
| | W. J. Lazarus, Chief. Emergency 'date |
| | Preparedness Section |
| | Inspection Summary: Inspection on October 20-23, 1987 (Report No.50-289/87-16) |
| | Areas Inspected: Routine announced emergency preparedness inspection and |
| | observation of the licensee's full-participation annual emergency preparedness |
| | exercise conducted on October 20-23, 1987, inspection of the training records |
| | for the Emergency Response Organization, and review of evaluation of the |
| | .possible changes to the alternate communications system to ensure |
| | communications with offsite agencies (see section 4.0 of Combined Inspection |
| | Reports 50-289/87-14 and 50-320/87-06)). |
| | Results: No violations were identified. The licensee's response actions for |
| | this exercise were adequate to provide protective measures for the health and |
| | safety of the public. All follow-up items were closed. |
| | 8711300218 371125 |
| | DR ADOCK 0 % g9 |
| | |
| | -_ _ - - _ - _ _ - ___ - _ _- - - _ - - - - _ ___ ____ __ |
| | ... |
| | ' DETAILS |
| | 1.0 Persons Contacted |
| | *D.H. Bedell, Manager, Public Information |
| | , *A. K. Bhattacharyga, Nuclear Engineer, Commonwealth of. Pennsylvania |
| | *G. Broughton, Director, Operations and Maintenance |
| | ~ |
| | *J. J. Colitz, Director, Plant Engineering |
| | ' |
| | B.A. Good, Manager, Radiation Programs |
| | ! *G. Giangi, Corporate Manager, Emergency Preparedness, GPUNC |
| | _ |
| | H. Hukill, Vice President and Director, TMI-1- |
| | *G. Simmonetti, Jr., Manager, TMI Emergency Preparedness |
| | *C. Smyth, Licensing Manager.'TMI-1 |
| | * Indicates those present at the Exit Meeting. |
| | The inspector also' interviewed and observed the activities of other |
| | licensee personnel. |
| | 2.0 Emergency Exercise |
| | The TMI-1 Generating Station unannounced full-participation exercise was |
| | conducted on October 22, 1987, 5:00 p.'m. til 11:35 p.m. |
| | a .~ Pre-exercise Activities |
| | 'The exercise' objectives, submitted to NRC Region I on July 13, 1987, |
| | were reviewed and, following revision, determined to adequately test |
| | , |
| | the licensee's Emergency Plan. On September 23, 1987, the licensee |
| | submitted the complete scenario package for NRC review and |
| | evaluation. Region I representatives had telephone conversations |
| | with the licensee's emergency preparedness staff to discuss the |
| | . scope and content of the scenario. As'a result, minor revisions |
| | were made to the scenario and supporting data provided by the |
| | licensee. It was determined that the revised scenario would provide |
| | for the adequate testing of major portions of the Emergency Plan and |
| | Emergency Plan Implementing Procedures (EPIP) and also provided the |
| | opportunity for licensee personnel to demonstrate those areas |
| | previously identified by the NRC as in need of corrective action. |
| | NRC observers attended a licensee briefing on October 21, 1987, and |
| | participated in the discussion of emergency response actions |
| | expected during the scenario. Suggested NRC changes to the scenario |
| | made by the licensee were discussed during the briefing. The |
| | licensee stated that certain emergency response activities would be |
| | simulated and indicated in the scenario that controllers would |
| | intercede in exercise activities to prevent scenario deviations or |
| | disruption of normal plant operations. |
| | The exercise scenario included the following events: |
| | 1 |
| | .. . |
| | __ _ - -_ |
| | |
| | . |
| | . 3 |
| | * |
| | Low river water level; |
| | Fire in Rad Waste Compactor area; |
| | " |
| | Primary to secondary leakage; |
| | Loss of offsite power; |
| | Station Black-out; |
| | Superheat conditions; |
| | Accountability and evacuation; |
| | Core uncovery and fuel damage; |
| | * Release of radioactive material to the environment; |
| | In-plant, onsite and offsite radiological monitoring; |
| | Dispatch of teams from the Operations Support Center; |
| | Emergency Classification i |
| | Calculation of projected offsite dose equivalents and dose |
| | commitment equivalents; |
| | Development of Protective Action Recommendations. |
| | b. Activities Observed |
| | During the conduct of the licensee's exercise, NRC team members made |
| | detailed observations of the activation and augmentation of the |
| | emergency organization, activation of emergency response facilities, |
| | and actions of emergency response personnel during the operation of |
| | the emergency response facilities. The following activities were |
| | observed: |
| | 1. Recognition of initiating conditions, correlation of these with |
| | Emergency Action Levels, selection and use of Emergency |
| | Operation Procedures; and completion of notification to offsite |
| | governmental authorities within the prescribed times; |
| | 2. Staffing and activation of Emergency Response Facilities |
| | (ERFs); |
| | 3. Communication between and within ERFs; |
| | 4. Assessments of accident conditions; |
| | 5. Application of barrier breech analysis; |
| | 6. Development of Protective Action Recommendations (PARS) and |
| | communications of these to the Commonwealth of Pennsylvania; |
| | 7. Provisions for in-plant radiation protection; |
| | 8. Performance of offsite and in-plant radiological surveys; |
| | 9. Performance of technical support, repair and corrective |
| | actions; |
| | 10. Assembly and accountability of personnel. |
| | 3.0 Exercise Observations |
| | The NRC team noted that the licensee's activation and augmentation of the j |
| | emergency organization, activations of the emergency response facilities, j |
| | and use of the facilities were generally consistent with their emergency |
| | response plan and implementing procedures. The team also noted the |
| | following actions of the licensee's emergency response organization that |
| | were indicative of their ability to cope with the simulated emergency. j |
| | ) |
| | I |
| | I |
| | < |
| | |
| | _ _ _ _ - _ - |
| | C' |
| | I 4 |
| | 1 |
| | 1 |
| | - Recognition of Initiating Conditions; |
| | -- Accident Classification; ' |
| | - Communication with offsite authorities; |
| | - Activation of Emergency Response Facilities * - |
| | - Communication within and among Emergency Response Facilities; 1 |
| | - Onsite Corrective Actions; 1 |
| | - Use of Barrier Breech analysis; ) |
| | - Projection of dose equivalent; l |
| | - Deployment of field teams; |
| | - Interface with the Nuclear Engineer from the Commonwealth of |
| | Pennsylvania assigned to the Emergency Operations Facility; |
| | - Command and Control; |
| | - Development of Protective Action Recommendations and communication |
| | of these in a timely manner to Pennsylvania. { |
| | The NRC identified the following areas which need to be evaluated by the |
| | licensee for corrective action (the licensee conducted an adequate |
| | self-critique of the exercise). These items will be evaluated during a I |
| | subsequent inspection. |
| | Engineers assigned to the Technical Support Center (TSC) did not |
| | identify, track and anticipate trends, develop a composite of the |
| | emergency situation and respond on a proactive basis. There were |
| | indications of a lack of understanding of plant conditions. |
| | (50-289/87-16-01) j |
| | i |
| | Activation of the Parsippany Technical Functions Center (PTFC) was ; |
| | delayed one hour. The TSC Coordinator had a TSC staff member call a ) |
| | Parsippany staff member at home and ask that individual to staff the l |
| | PTFC. (50-289/87-16-02) |
| | 4.0 Licensee Actions on Previously Identified Items |
| | Based upon discussions with licensee representatives, examination of |
| | records, Plans and Procedures and observations made by the NRC team |
| | during the exercise the following items were acceptably demonstrated and |
| | are closed. |
| | , |
| | 1. (Closed) IFI (50-289/86-20-01 and 50-320/86-14-01): The Emergency l |
| | Director (ED) initially did not effectively utilize TSC personnel. ! |
| | For example, the TSC was not requested to verify the leak rate source ) |
| | term calculations, or trend key plant systems. ] |
| | 1 |
| | 2. (Closed) IFI (50-289/86-10-02 and 50-320/86-14-02): Follow-up J |
| | notifications to off-site agencies was slow. For example, a |
| | significant increase in steam generator leak rate was not |
| | transmitted until after a second request by the ED was made. |
| | I |
| | 3. (Closed) IFI (50-289/86-20-03 and 50-320/86-14-03): Continuous |
| | accountability was not maintained in the OSC, and the design made |
| | command and control difficult. |
| | l |
| | ; |
| | I |
| | _____ ___ a |
| | |
| | _ _ _ _ _ _ _ _ _ _ _ _ |
| | e |
| | .' 5 |
| | ) |
| | '4. (Closed)IFI(50-289-20-04and50-320/86-14-04): Call-out and ! |
| | mobilization of emergency response personnel off hours was not 4 |
| | demonstrated during this exercise due to a large portion of the |
| | staff being onsite in support of the outage (Objective C.2). |
| | 5. (Closed) IFI (50-289-20-05 and 50-320/86-14-05): Additional |
| | training is needed for proper call-in procedures by emergency |
| | response personnel. Several personnel who called in gave garbled |
| | messages and/or did not indicate appropriate arrival times (i.e., a |
| | half hour arrival time and no clock reference time). Also, the |
| | reliability of the code-a-phone during off-hours should be |
| | re-evaluated. |
| | 5.0 Training |
| | 5.1 The inspector reviewed training records. About 300 TMI staff are |
| | currently qualified for shift, initial and support Emergency |
| | Response Organization positions. |
| | 6.0 Emergency Communications |
| | Following the May and August temporary loss of primary emergency |
| | communication capability to offsite locations and use of the alternate |
| | system, the licensee undertook steps to explore means to upgrade the |
| | alternate system. This study is currently on-going and results will be |
| | subject to a future NRC inspection. |
| | 7.0 Licensee Critique |
| | The NRC team attended the licensee's post-exercise critique on |
| | October 23, 1987, during which licensee controllers presented and |
| | disc %d their observations of the exercise. The critique was |
| | adeqete. Licensee participants highlighted areas for improvement which |
| | the licensee indicated would be evaluated and appropriate actions taken. |
| | 8.0 Exit Meeting and NRC Critique |
| | Following the licensee's self-critique, the NRC team met and evaluated |
| | the licensee's critique. Subsequently, the NRC team met with licensee's |
| | representatives listed in Section 1 of this report. The NRC Regional |
| | Team Leader summarized the observations made during the exercise. |
| | The licensee was informed that previously identified items were |
| | adequately addressed and that no violations were observed. Although |
| | there were areas identified for corrective action, the NRC team |
| | determined that within the scope and limitations of the scenario, the |
| | licensee's performance demonstrated that they could implement their |
| | Emergency Plan and Emergency Plan Implementing Procedures in a manner that |
| | would provide adequate protective measures for the health and safety of |
| | the public. |
| | i |
| | At no time during this inspection did the inspectors provide any written |
| | ' |
| | information to the licensee. |
| | l |
| | _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ |
| | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel ML20058A4941993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness IR 05000289/19930041993-02-0404 February 1993 Physical Security Insp Rept 50-289/93-04 on 930125-28.No Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Emergency Power Supply,Maint & Security Training IR 05000289/19920221993-02-0202 February 1993 Insp Repts 50-289/92-22 & 50-320/92-16 on 921208-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000320/19930021993-01-29029 January 1993 Insp Rept 50-320/93-02 on 921221.Violation Noted.Major Areas Inspected:Util Was Originator of Radwaste Shipment Which Was Inspected by State of Wa at Us Ecology Waste Disposal Site Near Richland,Wa IR 05000289/19930011993-01-29029 January 1993 Insp Rept 50-289/93-01 on 930111-15.No Violations Noted. Major Areas Inspected:Fire Protection Program Including Implementation of Administrative Controls,Fire Surveillance Program,Fire Audits & Fire Training Programs IR 05000289/19920211993-01-12012 January 1993 Insp Repts 50-289/92-21 & 50-320/92-15 on 921207-11. Violation Noted.Major Area Inspected:Postings & Other Controls Observed During Facility Tours,Reactor Building Entry During Power Operation & Organization & Staffing IR 05000289/19920201992-12-23023 December 1992 Insp Repts 50-289/92-20 & 50-320/92-14 on 921027-1207. Violations Noted.Major Areas Inspected:Power Operations & Cleanup Activities,Plant Operations,Maint,Radiological Controls,Security & Engineering IR 05000289/19920191992-11-25025 November 1992 Insp Repts 50-289/92-19 & 50-320/92-13 on 921102-06.No Safety Concerns or Violations Noted.Major Areas Inspected: Unit 1 Radioactive Liquid & Gaseous Effluent Control Programs,Projected Dose Calculations & Mgt Controls 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel ML20058A4941993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness IR 05000289/19930041993-02-0404 February 1993 Physical Security Insp Rept 50-289/93-04 on 930125-28.No Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Emergency Power Supply,Maint & Security Training IR 05000289/19920221993-02-0202 February 1993 Insp Repts 50-289/92-22 & 50-320/92-16 on 921208-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000320/19930021993-01-29029 January 1993 Insp Rept 50-320/93-02 on 921221.Violation Noted.Major Areas Inspected:Util Was Originator of Radwaste Shipment Which Was Inspected by State of Wa at Us Ecology Waste Disposal Site Near Richland,Wa IR 05000289/19930011993-01-29029 January 1993 Insp Rept 50-289/93-01 on 930111-15.No Violations Noted. Major Areas Inspected:Fire Protection Program Including Implementation of Administrative Controls,Fire Surveillance Program,Fire Audits & Fire Training Programs IR 05000289/19920211993-01-12012 January 1993 Insp Repts 50-289/92-21 & 50-320/92-15 on 921207-11. Violation Noted.Major Area Inspected:Postings & Other Controls Observed During Facility Tours,Reactor Building Entry During Power Operation & Organization & Staffing IR 05000289/19920201992-12-23023 December 1992 Insp Repts 50-289/92-20 & 50-320/92-14 on 921027-1207. Violations Noted.Major Areas Inspected:Power Operations & Cleanup Activities,Plant Operations,Maint,Radiological Controls,Security & Engineering IR 05000289/19920191992-11-25025 November 1992 Insp Repts 50-289/92-19 & 50-320/92-13 on 921102-06.No Safety Concerns or Violations Noted.Major Areas Inspected: Unit 1 Radioactive Liquid & Gaseous Effluent Control Programs,Projected Dose Calculations & Mgt Controls 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety IR 05000289/19930211993-11-0808 November 1993 Insp Rept 50-289/93-21 on 931018-21.No Violations Noted. Major Areas Inspected:Mgt Support & Security Program Plans, Protected Areas Physical Barriers,Detection & Assessment Aids & Protected & Vital Area Access Control of Personnel ML20058A4941993-11-0808 November 1993 Insp Rept 50-289/93-23 on 931004-08.Violations Noted.Major Areas Inspected:Radiological Controls During Planned Shutdown of Plant Operations for Refueling & Maint IR 05000286/19930161993-10-19019 October 1993 Insp Rept 50-286/93-16 on 930802-06 & 0920-24.No Violations Noted.Major Areas Inspected:Isi Program,Procedures,Scope of ISI Work for Outage,Current Insp Plan & Testing Procedures IR 05000289/19930191993-09-24024 September 1993 Insp Repts 50-289/93-19 on 930801-0909.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support Activities Re Plant Safety ML20057A3861993-09-0303 September 1993 Enforcement Conference Rept 50-289/93-08 on 930824 to Discuss Delay in Callout of Emergency Response Organization During Vehicle Intrusion on 930207 IR 05000289/19930151993-08-27027 August 1993 Insp Rept 50-289/93-15 on 930727-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensees C/As of Three Previously Identified Edsfi & follow-up of Unresolved Item Which Resulted in non-cited Violation ML20056F4291993-08-11011 August 1993 Safety Insp Rept 50-289/93-14 on 930622-0731.Violations Noted.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Control & Security as Related to Plant Safety ML20056D9101993-08-0505 August 1993 Insp Rept 50-289/93-08 on 930607-11.Violations Noted.Major Areas Inspected:Changes to EP & Implementing Procedures, Emergency Facilities,Equipment,Instrumentation & Supplies, Organization & Mgt Control & Training Effectiveness IR 05000289/19930041993-02-0404 February 1993 Physical Security Insp Rept 50-289/93-04 on 930125-28.No Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Emergency Power Supply,Maint & Security Training IR 05000289/19920221993-02-0202 February 1993 Insp Repts 50-289/92-22 & 50-320/92-16 on 921208-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Radiological Controls,Security & Engineering & Technical Support Activities Re Plant Safety IR 05000320/19930021993-01-29029 January 1993 Insp Rept 50-320/93-02 on 921221.Violation Noted.Major Areas Inspected:Util Was Originator of Radwaste Shipment Which Was Inspected by State of Wa at Us Ecology Waste Disposal Site Near Richland,Wa IR 05000289/19930011993-01-29029 January 1993 Insp Rept 50-289/93-01 on 930111-15.No Violations Noted. Major Areas Inspected:Fire Protection Program Including Implementation of Administrative Controls,Fire Surveillance Program,Fire Audits & Fire Training Programs IR 05000289/19920211993-01-12012 January 1993 Insp Repts 50-289/92-21 & 50-320/92-15 on 921207-11. Violation Noted.Major Area Inspected:Postings & Other Controls Observed During Facility Tours,Reactor Building Entry During Power Operation & Organization & Staffing IR 05000289/19920201992-12-23023 December 1992 Insp Repts 50-289/92-20 & 50-320/92-14 on 921027-1207. Violations Noted.Major Areas Inspected:Power Operations & Cleanup Activities,Plant Operations,Maint,Radiological Controls,Security & Engineering IR 05000289/19920191992-11-25025 November 1992 Insp Repts 50-289/92-19 & 50-320/92-13 on 921102-06.No Safety Concerns or Violations Noted.Major Areas Inspected: Unit 1 Radioactive Liquid & Gaseous Effluent Control Programs,Projected Dose Calculations & Mgt Controls 1999-09-27
[Table view] Category:UTILITY
MONTHYEARIR 05000289/19900151990-10-18018 October 1990 Safety IRs 50-289/90-15 & 50-320/90-08 on 900807-0921. Violations Noted.Areas Inspected:Power Operations & Unit 2 Cleanup Activities,Including Maint & Surveillance,Security Measures & Engineering Support Activities IR 05000289/19900801990-10-0303 October 1990 Safety Insp Rept 50-289/90-80 on 900911-13.Exercise Weaknesses Noted.Major Areas Inspected:Licensee Annual & partial-participation,emergency Preparedness Exercise Conducted on 900911-13 IR 05000289/19900161990-08-23023 August 1990 Insp Repts 50-289/90-16 & 50-320/90-07 on 900806-10.No Violations Noted.Major Areas Inspected:Radiological Controls Program,Including Corrective Actions Re NRC Followup Items, Organization & Staffing & Applied Health Physics IR 05000289/19900101990-06-22022 June 1990 Insp Rept 50-289/90-10 on 900507-11.Violation Noted.Major Areas Inspected:Licensee Implementation of Reg Guide 1.97, Rev 3 Re post-accident Monitoring Instrumentation IR 05000320/19890051989-09-0707 September 1989 Insp Rept 50-320/89-05 on 890603-0818.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890151989-09-0505 September 1989 Insp Repts 50-289/89-15 & 50-320/89-06 on 890724-28.No Violations Noted.Major Areas Inspected:Organization, Staffing & Hot Particle Control Program at Unit 2 Reactor & Events Connected W/Suspected Intake of Radioactive Matl IR 05000289/19890161989-08-30030 August 1989 Insp Rept 50-289/89-16 & 50-320/89-07 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys,Transportation & Liquid & Gaseous Effluents Programs Including Mgt Controls,Audits & QA IR 05000289/19890131989-08-22022 August 1989 Insp Rept 50-289/89-13 on 890626-0707.No Violations Noted. Major Areas Inspected:Corrective Actions Resulting from IE Bulletin 85-003 Addressing Improper Limit Switch & Torque Switch Settings in motor-operated Valves IR 05000289/19890121989-08-16016 August 1989 Insp Rept 50-289/89-12 on 890610-0714.No Violations Noted. Major Areas Inspected:Power Operations Activities,Plant Operations & Maint/Surveillance,Control Rod Drive Indication Problem & Diesel Generator Fuel Oil QA Program IR 05000289/19890081989-07-12012 July 1989 Insp Rept 50-289/89-08 on 890401-0508.No Violations Noted. Major Areas Inspected:Plant Operations,Equipment Operability,Emergency Power Sys Operability & Licensee Action on Previous Insp Findings IR 05000289/19890801989-07-0707 July 1989 Insp Rept 50-289/89-80 on 890306-17.No Violations or Deviations Noted.Major Areas Inspected:Review of Adequacy of Emergency Operating Procedures IR 05000289/19890111989-06-28028 June 1989 Insp Rept 50-289/89-11 on 890510-0609.Two non-cited Violations Identified.Major Areas Inspected:Plant Operations,Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings IR 05000320/19890041989-06-20020 June 1989 Insp Rept 50-320/89-04 on 890422-0602.Major Areas Inspected: Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping Measures & Actions on Previous Insp Findings IR 05000289/19890101989-06-0707 June 1989 Insp Rept 50-289/89-10 on 890508-12.No Violations Noted. Major Areas Inspected:Licensee Evaluation & Resolution of EQ Issues IR 05000320/19880051989-06-0505 June 1989 Errata to Insp Rept 50-320/88-05.Unresolved Item 50-320/87-14-02 Should Be 50-320/87-14-01 IR 05000320/19880131989-06-0505 June 1989 Errata to Insp Rept 50-320/88-13.Unresolved Item 50-320/88-12-02 Should Be 50-320/88-12-01 IR 05000320/19850101989-06-0505 June 1989 Errata to Insp Rept 50-320/85-10.Inspector Followup Item 50-320/84-24-01 Should Be 50-320/84-24-03 IR 05000289/19870141989-05-25025 May 1989 Errata to Insp Rept 50-289/87-14,correcting Item Numbers as Stated IR 05000289/19890091989-05-25025 May 1989 Insp Rept 50-289/89-09 on 890417-21.No Violations Noted. Major Areas Inspected:Measurement Control,Qc,Training & Analytical Procedure Evaluations IR 05000289/19880071989-05-25025 May 1989 Errata to Insp Rept 50-289/88-07,correcting Sims Number in Section 2.3 IR 05000289/19870081989-05-25025 May 1989 Errata to Insp Rept 50-289/87-08,correcting Insp Item Number on Page 19 IR 05000289/19880301989-05-25025 May 1989 Errata to Insp Rept 50-289/88-30,correcting Page 3,Paragraph 3.1 Inspector Followup Item from 50-289/86-17-01 to 50-289/86-17-07 IR 05000289/19870111989-05-25025 May 1989 Errata to Insp Rept 50-289/87-11,correcting Unresolved Item Number on Page 18 IR 05000289/19870191989-05-25025 May 1989 Errata to Insp Rept 50-289/87-19,correcting Page 29 to Note Info Notice 84-52,not 84-51 IR 05000289/19870161989-05-25025 May 1989 Errata to Insp Rept 50-289/87-16,correcting Item Number on Page 4,Section 4.0 to 50-289/86-20-02 ML20247K0221989-05-15015 May 1989 Mgt Meeting Rept 50-289/89-09 on 890428.Major Area Discussed:Nrc Nonradiological Chemistry Program for Clarification on NRC Acceptance Criteria & Statistical Method Used to Evaluate Program & NRC Training Program IR 05000320/19890031989-05-0909 May 1989 Insp Rept 50-320/89-03 on 890305-0421.No Violations Noted. Major Areas Inspected:Routine Safety Insp of Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890041989-05-0808 May 1989 Insp Rept 50-289/89-04 on 890226-0331.No Violations Noted. Major Areas Inspected:Plant Operations Activities,Equipment Operability & Licensee Action on Previous Insp Findings IR 05000289/19890061989-04-27027 April 1989 Insp Rept 50-289/89-06 on 890403-07.No Violations Noted. Major Areas Inspected:Implementation of Radiation Protection Program IR 05000320/19890021989-04-26026 April 1989 Insp Rept 50-320/89-02 on 890129-0306.No Violations Noted. Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19890071989-04-24024 April 1989 Insp Rept 50-289/89-07 on 890404-06.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions for Previously Identified Environ Qualification Issues IR 05000289/19890011989-03-27027 March 1989 Insp Rept 50-289/89-01 on 890115-0225 & 27.No Violations Noted.Major Areas Inspected:Areas of Plant Operations, Equipment Operability (Maint & Surveillance) & Licensee Action on Previous Insp Findings ML20236B9891989-03-10010 March 1989 Insp Repts 50-289/89-02 & 50-320/89-01 on 890123-26.No Violations Noted.Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000289/19880291989-02-27027 February 1989 Safety Insp Rept 50-289/88-29 on 881203-890114 & 18.No Violations Noted.Major Areas Inspected:Plant Operations, Equipment Operability (Maint & Surveillance) & Engineering & Technical Support ML20235V0501989-02-21021 February 1989 Insp Rept 50-289/89-05 on 890214-15.No Violations Noted. Major Areas Inspected:Performance of Visual Fire Damper Surveillance Test,Surveillance Test Records,Security Records of Personnel Access & Witnessing of Surveillance Test IR 05000320/19880201989-02-15015 February 1989 Insp Rept 50-320/88-20 on 881218-890131.No Major Problems Noted.Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000289/19880271988-11-28028 November 1988 Insp Rept 50-289/88-27 on 881115-17.No Violations or Deviations Noted.Major Areas Inspected:Licensee Partial Participation Annual Emergency Preparedness Exercise Conducted 881116 IR 05000320/19880161988-11-23023 November 1988 Insp Rept 50-320/88-16 on 881009-1109.No Violations Noted. Major Areas Inspected:Defueling & Decontamination Activities Including Proper Implementation of Radiological Controls & Housekeeping Measures IR 05000320/19880141988-10-26026 October 1988 Safety Insp Rept 50-320/88-14 on 880910-1008 & 11.No Violations Noted.Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls,Housekeeping & Licensee Actions ML20205J7141988-10-18018 October 1988 Insp Rept 50-289/88-16 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previously Identified Insp Findings.Deficiencies Noted Re Failure to Implement & Evaluate Emergency Feedwater Upgrade IR 05000289/19880161988-10-18018 October 1988 Insp Rept 50-289/88-16 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previously Identified Insp Findings.Deficiencies Noted Re Failure to Implement & Evaluate Emergency Feedwater Upgrade IR 05000289/19880171988-10-14014 October 1988 Insp Rept 50-289/88-17 on 880808-19.Violations Noted.Major Areas Inspected:Licensee Preventive & Corrective Maint Activities,Design Changes & Mods,Including Reg Guide 1.97 Re Selected Plant & Environ Monitoring Instrumentation IR 05000289/19880181988-10-12012 October 1988 Safety Insp Rept 50-289/88-18 on 880716-0827.Violations Noted.Major Areas Inspected:Plant Outage Activities,Plant Startup Evolution & Power Operations.Addl Emphasis Needs to Be Placed on Identification of Low Threshold Events IR 05000289/19880231988-10-12012 October 1988 Insp Rept 50-289/88-23 on 880829-0902.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program Including,Program Administration & Organization & Administrative Control of Combustibles & Ignition Sources ML20155E5251988-10-0505 October 1988 Safety Insp Rept 50-320/88-13 on 880806-0909.No Violations Noted.Major Areas Inspected:Defueling & Decontamination Activities & Implementat/On of Radiological Controls & Housekeeping IR 05000289/19880221988-09-29029 September 1988 Insp Rept 50-289/88-22 on 880822-26.No Violations Noted. Major Areas inspected:post-mod Test Program Performed During Recent Refueling Outage,Including Review of post-mod Test Procedures & Review of Completed post-mod Tests ML20155A5731988-09-20020 September 1988 Enforcement Conference Rept 50-289/86-06 on 880824.Major Areas Discussed:Significance of Concerns Re Environ Qualification of Emergency Fan Cooling Cable.Viewgraphs Encl IR 05000320/19880121988-09-0202 September 1988 Insp Rept 50-320/88-12 on 880708-0805.No Unacceptable Conditions Noted.Major Areas Inspected:Defueling & Decontamination Activities,Including Proper Implementation of Radiological Controls & Fire Protection Measures IR 05000289/19880211988-08-30030 August 1988 Insp Rept 50-289/88-21 on 880801-05.No Violations or Deviations Noted.Major Areas Inspected:Test Witnessing & Administration of Control of Local Leak Rate Testing & Followup of Previously Identified Open Items IR 05000289/19880131988-08-23023 August 1988 Safety Insp Rept 50-289/88-13 on 880612-0715.Violations Noted.Major Areas Inspected:Power Operations,Outage Activities & Transition from One Mode to Another,Including Plant Operations,Equipment Operability & Security Program 1990-08-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000289/19990071999-09-27027 September 1999 Insp Rept 50-289/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000289/19990041999-08-19019 August 1999 Insp Rept 50-289/99-04 on 990606-0717.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19990051999-07-0909 July 1999 Insp Rept 50-289/99-05 on 990510-28.No Violations Noted. Major Areas Inspected:Effectiveness of Engineering Functions in Providing for Safe Operation of Plant IR 05000289/19990061999-07-0808 July 1999 Insp Rept 50-289/99-06 on 990608-11.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Plan IR 05000289/19990031999-06-29029 June 1999 Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19990021999-05-14014 May 1999 Insp Rept 50-289/99-02 on 990314-0424.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support.Security Program Met Safeguards Requirements IR 05000289/19990011999-04-16016 April 1999 Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000289/19980091999-03-0505 March 1999 Insp Rept 50-289/98-09 on 981227-990130.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000289/19980081999-01-12012 January 1999 Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000289/19980071998-12-0303 December 1998 Insp Rept 50-289/98-07 on 980920-1031.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support,Including Results of Insps by Regional Inspector Re Emergency Preparedness & Radiological Controls ML20154L9821998-10-15015 October 1998 Notice of Violation from Insp on 980810-27.Violation Noted: in Oct 1997,change to Facility as Described in Section 6.1, Eccs,Of TMI-1 Ufsar,Involving Unreviewed Safety Question,Was Made Without Prior Commission Approval ML20154M0251998-10-15015 October 1998 Insp Rept 50-289/98-06 on 980810-27.Violations Noted.Major Areas Inspected:Engineering Activities Associated with Findings from NRC Architect Engineering Team Insp Completed in Jan 1997 & Documented in NRC Insp Rept 50-289/96-201 IR 05000289/19980051998-10-0202 October 1998 Insp Rept 50-289/98-05 on 980726-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Security Facilities & Equipment Were Well Maintain, Reliable & Met Licensee Commitments & NRC Requirements ML20153E9471998-09-24024 September 1998 Exam Rept 50-289/98-301 Conducted on 980824-27.Exam Results: Four SRO Applicants Passed All Portions of Initial License Exam IR 05000289/19980031998-09-0404 September 1998 Insp Rept 50-289/98-03 on 980524-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000289/19980021998-06-22022 June 1998 Insp Rept 50-289/98-02 on 980322-0523.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000289/19980011998-04-0909 April 1998 Insp Rept 50-289/98-01 on 980125-0321.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20203L7821998-02-26026 February 1998 Notice of Violation from Insp on 971102-980124.Violation Noted:Licensee Not Review & Approve Substantive Change to Existing Inservice Test Surveillance Procedure. Page 25 of Incoming Submittal Not Included ML20197A8771998-02-26026 February 1998 SALP Rept 50-289/98-99 for Period 960805-980124 IR 05000289/19970101998-02-26026 February 1998 Insp Repts 50-289/97-10 & 50-320/97-03 on 971102-980124. Violations Noted.Major Areas Inspected:Maint,Engineering & Plant Support.License Operator Requalification Program, Corrective Actions Program & Security Also Inspected ML20199H6141998-01-27027 January 1998 Notice of Violation from Insp on 970907-1101.Violation Noted:Pressurizer Power Operated Relief Valve Was Returned to Svc Without Performing an IST to Verify Proper Valve Operation After Valve Replaced ML20203D7591997-12-0202 December 1997 Insp Rept 50-289/97-09 on 970907-1101.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support Over 8 Wk Period PNO-I-97-068, on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities1997-11-0505 November 1997 PNO-I-97-068:on 971103,unplanned Shutdown Greater than 72 H Occurred.Oil Leaks Detected & Repaired.Third RCP Inspected & Engineers Found Low Seal Flow at Second Stage Pump Seal. Resident Inspectors Following Onsite Activities IR 05000289/19970081997-10-0909 October 1997 Insp Rept 50-289/97-08 on 970728-0906.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support & Results of Announced Insp in Area of Emergency Preparedness ML20217H3281997-10-0808 October 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $210,000.Violation Noted:On 940601,design Bases Were Not Correctly Translated Into Operating Procedures Re Switchover of Dhrs Pumps from Bwst to Reactor Building Sump ML20198R2831997-10-0303 October 1997 EN-97-096:on 971008,notice of Proposed Imposition of Civil Penalty in Amount of $210,000 Issued to Licensee.Action Based on Violations Involving Design Engineering,Equipment Classification & Corrective Actions ML20210R9641997-08-19019 August 1997 Notice of Violation from Insp on 970616-0727.Violation Noted:Licensee Failed to Implement EP Implementing Procedure EPIP-TMI-.03,Exhibit 1, Emergency Notifications & Call Outs IR 05000289/19970061997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210R9801997-08-19019 August 1997 Insp Repts 50-289/97-06 & 50-320/97-02 on 970616-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149K0171997-07-23023 July 1997 Insp Rept 50-289/97-07 on 970428-0502 & 0512-16.Violations Noted.Major Areas Inspected:Engineering ML20149K0081997-07-23023 July 1997 Notice of Violation from Insp on 970428-0502 & 0512-16. Violations Noted:On 970430,LER 97-03,did Not Contain Clear, Specific,Narrative Description of What Occurred IR 05000289/19970051997-07-11011 July 1997 Insp Rept 50-289/97-05 on 970428-0615.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20148S2321997-06-27027 June 1997 Insp Rept 50-289/97-04 on 970512-15.Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Performance During Remedial EP Exercise IR 05000289/19970031997-05-29029 May 1997 Insp Rept 50-289/97-03 on 970303-0427.Apparent Violations Being Considered for Escalated Enforcement Action IAW NUREG-1600.Major Areas Inspected:Plant Operations,Maint, Engineering & Plant Support IR 05000289/19970021997-04-24024 April 1997 Insp Rept 50-289/97-02 on 970305-07.No Violations Noted. Major Areas Inspected:Insp Evaluated Licensee Emergency Response Capabilities Demonstrated During Biennial Full Participation EP Exercise ML20137W9391997-04-15015 April 1997 Insp Rept 50-289/96-201 on 961202-20 & 970106-10.No Violations Noted.Major Areas Inspected:Conduct of Engineering,Insp Scope & Methodology,Makeup & Purification Sys,Decay Heat Removal Sys & Control of Calculations PNO-I-97-018, on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event1997-03-28028 March 1997 PNO-I-97-018:on 970328,protest Related to TMI-2 Accident Occurred.Protesters Walked in Circle,Outside of Util Property,Blocking Plant Entrance Lane.Plant Notified NRC Headquarter to Inform of Event ML20140B7051997-03-21021 March 1997 Insp Repts 50-289/97-01 & 50-320/97-01 on 970106-970302. Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering & Plant Support IR 05000289/19960091997-01-22022 January 1997 Insp Rept 50-289/96-09 on 961119-970105.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20135F1641996-12-0606 December 1996 Notice of Violation from Insp on 960929-1118.Violation Noted:Scaffold tied-off & Supported by Safety Related Pipe Support for Nuclear River Water Sys W/O Prior Engineering Evaluation & Approval IR 05000289/19960071996-11-18018 November 1996 Insp Rept 50-289/96-07 on 960929-1118.Violations Noted. Major Areas Inspected:Conduct of Operations, Quality Assurance in Operations & Conduct of Maint ML20135B0901996-11-14014 November 1996 Insp Rept 50-289/96-06 on 960804-0928.Violations Noted.Major Areas Inspected:Plant Operations,Engineering,Maint & Plant Support ML20135B0851996-11-14014 November 1996 Notice of Violation from Insp on 960804-0928.Violation Noted:Improper Control of Posted High Radiation Area Entrance IR 05000289/19960081996-11-0707 November 1996 Insp Rept 50-289/96-08 on 960603-07 & 0926-27.No Violations Noted.Major Areas Inspected:Maintenance ML20129B3761996-09-13013 September 1996 Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20129B3601996-09-13013 September 1996 Notice of Violation from Insp on 960617-0803.Violation Noted:Inspectors Could Not Confirm Valve Factor Inputs to Calculations Which Establish Design Basis Functionality of Motor Operated Valves in Safety Re Applications IR 05000289/19930251994-01-0404 January 1994 Insp Rept 50-289/93-25 on 931026-1206.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering,Radiological Controls,& Security Activities in Relation to Plant Safety IR 05000320/19930071993-12-23023 December 1993 Insp Rept 50-320/93-07 on 931101-1217.No Violations Noted. Major Areas Inspected:Licensee Completion of Pdms Requirements & Commitments for TMI-2 ML20058A4891993-11-12012 November 1993 Notice of Violation from Insp on 931004-08.Violation Noted: Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000289/19930221993-11-0909 November 1993 Insp Rept 50-289/93-22 on 930910-1025.Violation Noted But Not Cited.Major Areas Inspected:Plant Operations,Maint, Engineering,Radiological Controls & Security Activities as Related to Plant Safety 1999-09-27
[Table view] |
See also: IR 05000289/1987016
Text
- - _ - _ - _
.
! ,'
.-
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
[ ' Report No.- 50-289/87-16 3
1
Docket No. .50-289 )
License No. DPR-50 Priority -- Category C-
Licensee: GPU. Nuclear Corporation
l: Post Office Box 480
'
Middletown, Pennsylvania 17057-0191
Facility Name: Three Mile Island Unit 1
l
Inspection At: Middletown, Pennsylvania
Inspection Conducted: October 20-23, 1987
Inspectors: -ft L M / Ke M (s w / n/ /t /r 7
C. G. Amato, EPS, EPRPB, DRSS date
$.c A b P f%.la ( f.m) o r l /4 /*7
E. F. Fox., Sr. EPS, EP&RPB, DRSS date
NRC Team Members: K. Christopher, Region I
R. Conte, SRI, TMI-1
C.-Gordon, Region I
J. Jamison, Battelle PNL
D. Johnson, Region I
T. Tuccinardi, Region I
Approved by: //ca/h r64i M/ /,hd/ 7
W. J. Lazarus, Chief. Emergency 'date
Preparedness Section
Inspection Summary: Inspection on October 20-23, 1987 (Report No.50-289/87-16)
Areas Inspected: Routine announced emergency preparedness inspection and
observation of the licensee's full-participation annual emergency preparedness
exercise conducted on October 20-23, 1987, inspection of the training records
for the Emergency Response Organization, and review of evaluation of the
.possible changes to the alternate communications system to ensure
communications with offsite agencies (see section 4.0 of Combined Inspection
Reports 50-289/87-14 and 50-320/87-06)).
Results: No violations were identified. The licensee's response actions for
this exercise were adequate to provide protective measures for the health and
safety of the public. All follow-up items were closed.
8711300218 371125
DR ADOCK 0 % g9
-_ _ - - _ - _ _ - ___ - _ _- - - _ - - - - _ ___ ____ __
...
' DETAILS
1.0 Persons Contacted
- D.H. Bedell, Manager, Public Information
, *A. K. Bhattacharyga, Nuclear Engineer, Commonwealth of. Pennsylvania
- G. Broughton, Director, Operations and Maintenance
~
- J. J. Colitz, Director, Plant Engineering
'
B.A. Good, Manager, Radiation Programs
! *G. Giangi, Corporate Manager, Emergency Preparedness, GPUNC
_
H. Hukill, Vice President and Director, TMI-1-
- C. Smyth, Licensing Manager.'TMI-1
- Indicates those present at the Exit Meeting.
The inspector also' interviewed and observed the activities of other
licensee personnel.
2.0 Emergency Exercise
The TMI-1 Generating Station unannounced full-participation exercise was
conducted on October 22, 1987, 5:00 p.'m. til 11:35 p.m.
a .~ Pre-exercise Activities
'The exercise' objectives, submitted to NRC Region I on July 13, 1987,
were reviewed and, following revision, determined to adequately test
,
the licensee's Emergency Plan. On September 23, 1987, the licensee
submitted the complete scenario package for NRC review and
evaluation. Region I representatives had telephone conversations
with the licensee's emergency preparedness staff to discuss the
. scope and content of the scenario. As'a result, minor revisions
were made to the scenario and supporting data provided by the
licensee. It was determined that the revised scenario would provide
for the adequate testing of major portions of the Emergency Plan and
Emergency Plan Implementing Procedures (EPIP) and also provided the
opportunity for licensee personnel to demonstrate those areas
previously identified by the NRC as in need of corrective action.
NRC observers attended a licensee briefing on October 21, 1987, and
participated in the discussion of emergency response actions
expected during the scenario. Suggested NRC changes to the scenario
made by the licensee were discussed during the briefing. The
licensee stated that certain emergency response activities would be
simulated and indicated in the scenario that controllers would
intercede in exercise activities to prevent scenario deviations or
disruption of normal plant operations.
The exercise scenario included the following events:
1
.. .
__ _ - -_
.
. 3
Low river water level;
Fire in Rad Waste Compactor area;
"
Primary to secondary leakage;
Loss of offsite power;
Station Black-out;
Superheat conditions;
Accountability and evacuation;
Core uncovery and fuel damage;
- Release of radioactive material to the environment;
In-plant, onsite and offsite radiological monitoring;
Dispatch of teams from the Operations Support Center;
Emergency Classification i
Calculation of projected offsite dose equivalents and dose
commitment equivalents;
Development of Protective Action Recommendations.
b. Activities Observed
During the conduct of the licensee's exercise, NRC team members made
detailed observations of the activation and augmentation of the
emergency organization, activation of emergency response facilities,
and actions of emergency response personnel during the operation of
the emergency response facilities. The following activities were
observed:
1. Recognition of initiating conditions, correlation of these with
Emergency Action Levels, selection and use of Emergency
Operation Procedures; and completion of notification to offsite
governmental authorities within the prescribed times;
2. Staffing and activation of Emergency Response Facilities
(ERFs);
3. Communication between and within ERFs;
4. Assessments of accident conditions;
5. Application of barrier breech analysis;
6. Development of Protective Action Recommendations (PARS) and
communications of these to the Commonwealth of Pennsylvania;
7. Provisions for in-plant radiation protection;
8. Performance of offsite and in-plant radiological surveys;
9. Performance of technical support, repair and corrective
actions;
10. Assembly and accountability of personnel.
3.0 Exercise Observations
The NRC team noted that the licensee's activation and augmentation of the j
emergency organization, activations of the emergency response facilities, j
and use of the facilities were generally consistent with their emergency
response plan and implementing procedures. The team also noted the
following actions of the licensee's emergency response organization that
were indicative of their ability to cope with the simulated emergency. j
)
I
I
<
_ _ _ _ - _ -
C'
I 4
1
1
- Recognition of Initiating Conditions;
-- Accident Classification; '
- Communication with offsite authorities;
- Activation of Emergency Response Facilities * -
- Communication within and among Emergency Response Facilities; 1
- Onsite Corrective Actions; 1
- Use of Barrier Breech analysis; )
- Projection of dose equivalent; l
- Deployment of field teams;
- Interface with the Nuclear Engineer from the Commonwealth of
Pennsylvania assigned to the Emergency Operations Facility;
- Command and Control;
- Development of Protective Action Recommendations and communication
of these in a timely manner to Pennsylvania. {
The NRC identified the following areas which need to be evaluated by the
licensee for corrective action (the licensee conducted an adequate
self-critique of the exercise). These items will be evaluated during a I
subsequent inspection.
Engineers assigned to the Technical Support Center (TSC) did not
identify, track and anticipate trends, develop a composite of the
emergency situation and respond on a proactive basis. There were
indications of a lack of understanding of plant conditions.
(50-289/87-16-01) j
i
Activation of the Parsippany Technical Functions Center (PTFC) was ;
delayed one hour. The TSC Coordinator had a TSC staff member call a )
Parsippany staff member at home and ask that individual to staff the l
PTFC. (50-289/87-16-02)
4.0 Licensee Actions on Previously Identified Items
Based upon discussions with licensee representatives, examination of
records, Plans and Procedures and observations made by the NRC team
during the exercise the following items were acceptably demonstrated and
are closed.
,
1. (Closed) IFI (50-289/86-20-01 and 50-320/86-14-01): The Emergency l
Director (ED) initially did not effectively utilize TSC personnel. !
For example, the TSC was not requested to verify the leak rate source )
term calculations, or trend key plant systems. ]
1
2. (Closed) IFI (50-289/86-10-02 and 50-320/86-14-02): Follow-up J
notifications to off-site agencies was slow. For example, a
significant increase in steam generator leak rate was not
transmitted until after a second request by the ED was made.
I
3. (Closed) IFI (50-289/86-20-03 and 50-320/86-14-03): Continuous
accountability was not maintained in the OSC, and the design made
command and control difficult.
l
I
_____ ___ a
_ _ _ _ _ _ _ _ _ _ _ _
e
.' 5
)
'4. (Closed)IFI(50-289-20-04and50-320/86-14-04): Call-out and !
mobilization of emergency response personnel off hours was not 4
demonstrated during this exercise due to a large portion of the
staff being onsite in support of the outage (Objective C.2).
5. (Closed) IFI (50-289-20-05 and 50-320/86-14-05): Additional
training is needed for proper call-in procedures by emergency
response personnel. Several personnel who called in gave garbled
messages and/or did not indicate appropriate arrival times (i.e., a
half hour arrival time and no clock reference time). Also, the
reliability of the code-a-phone during off-hours should be
re-evaluated.
5.0 Training
5.1 The inspector reviewed training records. About 300 TMI staff are
currently qualified for shift, initial and support Emergency
Response Organization positions.
6.0 Emergency Communications
Following the May and August temporary loss of primary emergency
communication capability to offsite locations and use of the alternate
system, the licensee undertook steps to explore means to upgrade the
alternate system. This study is currently on-going and results will be
subject to a future NRC inspection.
7.0 Licensee Critique
The NRC team attended the licensee's post-exercise critique on
October 23, 1987, during which licensee controllers presented and
disc %d their observations of the exercise. The critique was
adeqete. Licensee participants highlighted areas for improvement which
the licensee indicated would be evaluated and appropriate actions taken.
8.0 Exit Meeting and NRC Critique
Following the licensee's self-critique, the NRC team met and evaluated
the licensee's critique. Subsequently, the NRC team met with licensee's
representatives listed in Section 1 of this report. The NRC Regional
Team Leader summarized the observations made during the exercise.
The licensee was informed that previously identified items were
adequately addressed and that no violations were observed. Although
there were areas identified for corrective action, the NRC team
determined that within the scope and limitations of the scenario, the
licensee's performance demonstrated that they could implement their
Emergency Plan and Emergency Plan Implementing Procedures in a manner that
would provide adequate protective measures for the health and safety of
the public.
i
At no time during this inspection did the inspectors provide any written
'
information to the licensee.
l
_ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _