OPERATING DATA REPORT DOCKET NO.      80-/83      i DATE FEB. B E6 CO3tPLETED BY      Cc-Loc c    i TELEPHONE 707/v v3- 2 7 g y l OPERATING STATUS
: 1. Unit Name:      Humsowr Env Powu. ?Lur-f}mr3                        Notcs
: 2. Reporting Period:      h u AstN        PC
: 3. Licensed Thermal Power (5tht):                          220
: 4. Nameplate Rating (Gross alWe):                              45
: 5. Design Electrical Rating (Net 31We):                        Ss
: 6. Sinimum Dependable Capacity (Gross 31Wel:                  S6
: 7. Staximum Dependable Capacity iNet 31We):                  S8
: 8. If Changes Occurin Capacity Ratings (Irems Number 3 Through 7)Since Last Report.Give Reasons:
A//A
: 9. Power Level To Which Restricted. lf Any (Net 31We):      4/!A
: 10. Reasons For Restrictions. If Any:                      AI/A l
This 31onth          Yr..to.Dat e      Cumulatise
: 11. Hours In Reporting Period                            'IM                    M                    N~I?~l9
: 12. Number Of Hours Reactor Was Critical                    o                      o              TF/71
: 13. Reactor Resene Shutdown Hours                            O                      O                      O I4. Hours Generator On-Line                                  0                    0              972S2.
: 15. Unit Resene Shutdown Hours                              O                    M                        O        l
: 16. Gross Thermal Energy Generated (%lWH)                  o                    M            / C 4 / 8. '/5 6
: 17. Gross Electrical Energy Generated (31WHI                o        . _ .      o              % 7JL 732
: 18. Net Electrical Ener;;y Generated (alWH)                o                    n              4 532 Aoi
: 19. Unit Service Factor                                    O                    M                    W- 3'/o        ,
: 20. Unit Availability Factor                                O                    o                    #Fl.3%        I
: 21. Unit Capacity Factor iUsing 31DC Net)                  o                  O                      3 d' .G' /. l
: 22. Unit Capacity Factor (Using DER Net)                    o                    d                      35 3%.
: 23. Unit Forced Outage Rate                                O                    d                      /. 9/ %
: 24. Shutdowns Scheduled O~er Nest 6 31onths (Type. Date,and Duration of Eschi:
                                                                                            ///A i
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:        NC 0 * * 'M / d d /^/6
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achiesed INITIAL CRITICA LITY 1.' ITIAL ELECTRICITY CUN!\tERCIAL OPER ATION 8604240060 860131 3                                                                        g7, ,    i PDR ADOCK 0500 R                                                                                .
                                                                                                            \
 
l l
2                              -
J O~                      m. m.    .
  ~
m              e e
                                                        -?_
L'
                          !. 5            J c_ c_
a
                                          'e-
: c.              O J            E O              E f4 es
::~'-=  - C O C: > F                    Lq        Type l
  --.-.=n ii i 2 5- E E E E E_ uc u
a- g 'o
  .t~
: :. I:
: >: : ,Ea3      un
                                          -4 4        Duration
  -- [ . . y Q        gE              -4'        (Hours) n cam
            = R' E : :. E e " = -
:. c. :-      HE                sO t ;. E Ea                            g        Reason ,
      -        =
a        m u
      -h54 Y                      Method of E              %.      Shutting                            E 7u                                  Down Reactor 3                        4
            =.
            -                                                                        m S                                                      x                C m
E-5 z      -
3 x
e o
4 T R'                              K E2m            H
                                                    -n    "
g                2
                                                    #              o                >
Z 2
w                                  ld.                O
              .                                                                      m t Y Y -- E                          System e
O>IE2                                                                *
( ode 4                          3" 5-  E y y '.
25ec8                                              /
              . = u. t*_      -
x m
m ". m C
5E2m                            Componen:          4                C
                                                                    @                O e 2 s"                              Code 5                          :$
e-                                              P                o
                    .=                                                                2 m
M 0:
to k
          +                      b        O                            n "8    n          o m          omm                      g        a      y      H ,g          e i          ~ n E 'p m  E E          C EQ 7&                  o        2
                                                  *>X            EP Z
:            x mS '                b            Ch        QE            Y" q Ye o y        R =E cq        =m  c>gzy can-e              o                    z a                *gy                %        E=-            zzw u
      =            - go e                p        ;;
m R
m<mm.o m            F Or" " C "=                      O      N      Q S t 4 g b
5            CEEE                                          (        $ D 2            25ca og                    1                      (
                  -                      M                      <    3-v.,
g Q Ni 2                                              Q        "      g DQ Q C                                              g  D x                                              y r-4        D M o                                              te
: s.  (
 
  $)
* AVERAGE D AILY UNIT P0hER LEVEL DOCKET NO.        50'l33 UNIT    H BPP M3 DATE    FE6 apC, COMPLETED BY CC h oc TELEPHONE 207,/WS-27/7 MONTH    TAcund ' O DAY        AVERAGE D I          P    ER LEVEL                  DAY        AVER AGE DAILY POWER LEVEL (MWe-Net)
I                                                          17 2
is 3                                                            19 4                                                          20
                    $                                                          3g 22 l
7                                                          33 8                                                          24
                  '                                                          :s 30                                                            26 II                                                            27 I2                                                            2S 33                                                            29 14                                        --                30                                                      f 15                                                            3 y
16                          v                                                                                          ,
I INSTRUCTIONS On this format. list the aserage daily unit power !cselin MWe Net for each day in the reportine month. Compute to the nearest whole megswatt.
PF77) 9
 
h'
* 4 PACIFIC OAS AND E LE C T RIC C O M PANY
      @@*Dif3                          l  1034 SIXTH STREET . EUREKA. C ALIFO R NI A 95501 e (707) 443 2787 E.D. WEEKS
                ,LANT MANAGER NUCLEAR PLAh? OPERAftOhS-s* Wet 0LDT February 5, 1986 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:
Enclosed are the completed monthly report forms and *.he narrat.ive of operating and major maintenance experience for H wboldt Bay Powar Plant i                    Unit No. 3 (HBPP-Unit 3) for January, 1986. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Techr.ical Specifications.
Sincerely, 0$&g E. D. Weeks Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California        95501 (707-443-2787)
Enclosure cc:      Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Ads.inistrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596                                                  l EDWeeks:me 1  i
                                                                                                          ,  i 1
 
W MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE t
This report describes the operating and major maintenance experience for the month of January, 1986. This report was prepared by the Plant Staff and is submitted in accordance with Section IK:I.l.c. of the Technical Specifications.
i During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. During the month the following items were conducted:
: 1. Construction of the radwaste enclosure.
: 2. Continued vacuuming the spent fuel pool and processing hardware for shipment.
i 1
.t
                                                                              +
I a
                                                                                          -. , . , - - - - - -- - - - - - - ,  - , . , - , -}}

Latest revision as of 23:04, 31 December 2020

Monthly Operating Rept for Jan 1986
ML20203E015
Person / Time
Site: Humboldt Bay
Issue date: 01/31/1986
From: Kwok C, Weeks E
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8604240060
Download: ML20203E015 (5)


Text

'

\ .

OPERATING DATA REPORT DOCKET NO. 80-/83 i DATE FEB. B E6 CO3tPLETED BY Cc-Loc c i TELEPHONE 707/v v3- 2 7 g y l OPERATING STATUS

1. Unit Name: Humsowr Env Powu. ?Lur-f}mr3 Notcs
2. Reporting Period: h u AstN PC
3. Licensed Thermal Power (5tht): 220
4. Nameplate Rating (Gross alWe): 45
5. Design Electrical Rating (Net 31We): Ss
6. Sinimum Dependable Capacity (Gross 31Wel: S6
7. Staximum Dependable Capacity iNet 31We): S8
8. If Changes Occurin Capacity Ratings (Irems Number 3 Through 7)Since Last Report.Give Reasons:

A//A

9. Power Level To Which Restricted. lf Any (Net 31We): 4/!A
10. Reasons For Restrictions. If Any: AI/A l

This 31onth Yr..to.Dat e Cumulatise

11. Hours In Reporting Period 'IM M N~I?~l9
12. Number Of Hours Reactor Was Critical o o TF/71
13. Reactor Resene Shutdown Hours O O O I4. Hours Generator On-Line 0 0 972S2.
15. Unit Resene Shutdown Hours O M O l
16. Gross Thermal Energy Generated (%lWH) o M / C 4 / 8. '/5 6
17. Gross Electrical Energy Generated (31WHI o . _ . o  % 7JL 732
18. Net Electrical Ener;;y Generated (alWH) o n 4 532 Aoi
19. Unit Service Factor O M W- 3'/o ,
20. Unit Availability Factor O o #Fl.3% I
21. Unit Capacity Factor iUsing 31DC Net) o O 3 d' .G' /. l
22. Unit Capacity Factor (Using DER Net) o d 35 3%.
23. Unit Forced Outage Rate O d /. 9/ %
24. Shutdowns Scheduled O~er Nest 6 31onths (Type. Date,and Duration of Eschi:

///A i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NC 0 * * 'M / d d /^/6
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY 1.' ITIAL ELECTRICITY CUN!\tERCIAL OPER ATION 8604240060 860131 3 g7, , i PDR ADOCK 0500 R .

\

l l

2 -

J O~ m. m. .

~

m e e

-?_

L'

!. 5 J c_ c_

a

'e-

c. O J E O E f4 es
~'-= - C O C: > F Lq Type l

--.-.=n ii i 2 5- E E E E E_ uc u

a- g 'o

.t~

:. I:
>: : ,Ea3 un

-4 4 Duration

-- [ . . y Q gE -4' (Hours) n cam

= R' E : :. E e " = -

. c. :- HE sO t ;. E Ea g Reason ,

- =

a m u

-h54 Y Method of E  %. Shutting E 7u Down Reactor 3 4

=.

- m S x C m

E-5 z -

3 x

e o

4 T R' K E2m H

-n "

g 2

  1. o >

Z 2

w ld. O

. m t Y Y -- E System e

O>IE2 *

( ode 4 3" 5- E y y '.

25ec8 /

. = u. t*_ -

x m

m ". m C

5E2m Componen: 4 C

@ O e 2 s" Code 5  :$

e- P o

.= 2 m

M 0:

to k

+ b O n "8 n o m omm g a y H ,g e i ~ n E 'p m E E C EQ 7& o 2

x mS ' b Ch QE Y" q Ye o y R =E cq =m c>gzy can-e o z a *gy  % E=- zzw u

= - go e p  ;;

m R

m<mm.o m F Or" " C "= O N Q S t 4 g b

5 CEEE ( $ D 2 25ca og 1 (

- M < 3-v.,

g Q Ni 2 Q " g DQ Q C g D x y r-4 D M o te

s. (

$)

  • AVERAGE D AILY UNIT P0hER LEVEL DOCKET NO. 50'l33 UNIT H BPP M3 DATE FE6 apC, COMPLETED BY CC h oc TELEPHONE 207,/WS-27/7 MONTH TAcund ' O DAY AVERAGE D I P ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

I 17 2

is 3 19 4 20

$ 3g 22 l

7 33 8 24

' :s 30 26 II 27 I2 2S 33 29 14 -- 30 f 15 3 y

16 v ,

I INSTRUCTIONS On this format. list the aserage daily unit power !cselin MWe Net for each day in the reportine month. Compute to the nearest whole megswatt.

PF77) 9

h'

  • 4 PACIFIC OAS AND E LE C T RIC C O M PANY

@@*Dif3 l 1034 SIXTH STREET . EUREKA. C ALIFO R NI A 95501 e (707) 443 2787 E.D. WEEKS

,LANT MANAGER NUCLEAR PLAh? OPERAftOhS-s* Wet 0LDT February 5, 1986 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the completed monthly report forms and *.he narrat.ive of operating and major maintenance experience for H wboldt Bay Powar Plant i Unit No. 3 (HBPP-Unit 3) for January, 1986. These forms and the narrative are submitted in accordance with Section IX I.l.c of our Techr.ical Specifications.

Sincerely, 0$&g E. D. Weeks Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)

Enclosure cc: Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Ads.inistrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 l EDWeeks:me 1 i

, i 1

W MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE t

This report describes the operating and major maintenance experience for the month of January, 1986. This report was prepared by the Plant Staff and is submitted in accordance with Section IK:I.l.c. of the Technical Specifications.

i During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. During the month the following items were conducted:

1. Construction of the radwaste enclosure.
2. Continued vacuuming the spent fuel pool and processing hardware for shipment.