ML20154J514: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000285/1988010]]
{{Adams
| number = ML20154J514
| issue date = 05/19/1988
| title = Forwards Notice of Violation & Notice of Deviation Re Insp Rept 50-285/88-10 on 880314-18.Documents Inadvertently Transmitted to Third Party One Day Before Rept Signed Out
| author name = Milhoan J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000285
| license number =
| contact person =
| document report number = NUDOCS 8805270025
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 6
}}
See also: [[see also::IR 05000285/1988010]]
 
=Text=
{{#Wiki_filter:2*#  Wg,                            UNITED STATES
  !  y%            '
                  i    ,          NUCLEAR REGULATORY COMMISSION
      h.            . ,b                          REGION IV
      *,,            8                  611 RYAN PLAZA DRIVE. SUITE 1000
        k**"*8
                                                                                                    ,
                                            ARLINGTfN,
                                                MA I91988 TEXAS 79011
                                                                                                    .
                                                                                                    '
          MEMORANDUM FOR:  File
          FROM:            James L. Milhoan, Director, Division of Reactor Safety
          SUBJECT:          INADVERTENT RELEASE OF DRAFT MATERIAL
          The purpose of this memorandum is to place in the PDR copies of documents
          related to NRC Inspection Report 50-285/88-10.              These documents were
            inadvertently transmitted via fascimile to a third party on April 18, 1988,
          the day before the report in question was signed out.
                                                                                M
                                                  h  James          .    lho n, Director
                                                  T        Division    of Reactor  Safety
            Enclosure: Ai stated
          cc w/ enclosure:
            R Martin, RIV
          v?DR 50-285 File Copy
;
                                                                                                  \*
                  k$$5270025880519
;                o      ADOCK 05000285
                                      PDR
  .-,                              .--.                .    ._-
                                                                        .      -            , _ _
 
                                              ---.                            .                                                              .-  -  -. .    .-
                                                                        '                                                                                                                  .
                , /'
        y T'< &,
                                                        p WNitto sTAYts                                            ,
                                                                                                                                                                                              .
    :. >              -                  NUCLEAR REGULATORY COMMISSION '                                                                                                                I.
                  '
                          l                                      mt010N IV                                                                                                                I
              ~
                      *
                        *                            fit AY AN PL AZ A ORIVE. (Uif t 1000                                                                                                l
  **                *                                    ARLINGTON. TEKAS M011
      ,      ,,                                                                                                                                                                          "
.
                                  F ACSI'(ILE                        TRANSMITTAL
              0ATEtrivt:                        -
                                                    /ff                    -      _
                                                                                                                        PatentTY:
                                                                                                                        Imeetately                  /
                                                                                                                        1 Hout
                                                                        ,
                                                                                                                        2 4 Hours
                                                                              %:
                                                            - QHbnd,d . O Ad4 A N
                                                                                                          W@A
              mtssact To:                I
              Mtssast m ox:                                          EAlf .                  2 / L/
                                                wumsEn Or PAaEs:              Y                Plus TRAxsMITTAL SHEET
                                              -57)l-16Y-31fl
                TELECOPY NUMB
                                              -S Ol-752                      YERIFICATION MUMBER:                                                O /~ /[_
                COMhCT: '
                      '
                                    / IMM                  bod                      kJ 7 2#-J/3/                                                                                        .
                                                                                                                                                                                          '
            ,
                                            U
                                                      >
                ....................- m ......................................................
          '
                SPECIAL INSTRUCTIONS / ATTACHMENT ($):
                                      ,
                                                                                                                                                                                        ,
                                                                                                                                                                                        ,
                                                                                                                                                                                        i
                                      l                                                                                                                                                1
                    ................................... n ..............'..........................
.
                                        & Verified by:                                                                            D15P0$!71'Gt:
                    Trans      tt'                                                                                                Return is %viginator      V                  j
                                    dd @                  4 d                                                                    Place b 4$.1
l
!                            tdAME                            DATE                                                                Other _
i
                            1
                                                                                                                                                              e  . .
                                                                                    ,.,---.------,,--,.-,,-,-....,-,,,,-,n,-,-,---,--c~-----n,,                      - - - - - . - - - -
 
                  __m  ,
                                                                                a-
  &
      ,
                                    f                                  f
                                                                                                      ,
                                                APPENDIX A
                                          _ NOTICE OF VIOLATION
      Omaha Public Power District
      Fort Calhoun Station                                    Docket: 50-285
                                                              Operating License: DPR-40
    During an NRC inspection conducted from March
    NRC requirements were identified.                      14-18, 1988, two violations of
    resolve deficiencies identified during a surveillance test and failure
    licensee
    reactor  coolant to verify
                            systemthe
                                  leakcorrect
                                        test.    qualifications for an examiner completing a
    Policy
    (1987), the and        Procedure
                      violations          forbelow:
                                  are listed    NRC Enforcement Actions " 10 CFR Part 2
  A.
          Failure To Promptly Resolve Test Deficiencies                                            ,
                                                                                                    O
          quality assurance program requires that a test program sI
          established
          satisfactorily.    to assure that . . . systems and components will perfonn                )
          documented
          satisfied.              and evaluated to assure that test requirements ha
                                                                                                      i
                                                                                                      j
          Contrary to the above, Surveillance Test ST-NZ-1 was completed on May 8,                    i
          1987, with anamolies or deficiencies involving 11 nozzles.                                  i
                                                                              There was not
i        an  evaluation started of these anomalies or deficiencies
          1988.                                                                    until March 15,
          This is a Severity Level IV violation.
                                                        (SupplementI)(285/8810-01)
  B.                                                                                                  j
          Failure
          Test  Evaluationto Use  Correct Qualification level of Examiner for Surveillance
                                                                                                      i
        Section 5.8.1 of the Technical Specifications (TS) requires that written
        procedures and administrative policies shall be established, implemented
        and 5.2 of ANSI N18.7-1972.and maintained that meet or exceed the minimum
                                            Table 1 of G-26 of the licensee's Standing
        Order G-26, R17. "Maintenance Quality Control Program," requires a minimum
        level II capability for personnel who evaluate and report test results.
        Contrary to the above, Surveillance Test ST-RLT-1, F.1 (leak test) results
        were evaluated and reported on May
        a lower capability level (Level 1). 29, 1987, by an individual qualified to
        This is a Severity Level IV violation.
                                                        (SupplementI)(285/8810-02)
i
l
5
    .
 
        .J
<
.
..,
    -                            O                                ^
                                                  2
          Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is
          hereby required to submit to this office, within 30 days of the date of the
          letter transmitting this Notice, a written statement or explanation in reply,
          including for each violation: (1) the reason for the violations if admitted,
          (2) the corrective steps which have been taken and the results achieved,
          (3) the corrective steps which will be taken to avoid further violations, and
          (4) the date when full compliance will be achieved. Where good cause is shown,
          consideration will be given to extending the response time.
          Dated at Arlington, Texas,
          this            day of              1988.
                                                                                        l
                                                                                        l
      .
 
      . 3l
                                                                                              .
  ,e                              O
    f7
  }                                                                                          !
                                                                                              !
                                                APPENDIX B                                    '
                                          NOTICE OF DEVIATION
        ~0maha Public Power District                                Docket:    50-285
        Fort Calhoun Station
                                                                    Operating License: DPR-40
        Based on the results of an NRC inspection conducted from March          14-18, 1988, a
        deviation from your comitment was identified.
                                                              The deviation consisted of
        failure to continue implementation of corrective actions comitted to in the
        response to an NRC violation.
                                            In accordance with the "General Statement of
        Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C
        (1987), the deviation is listed below:
              Failure to Continue Implementation of Corrective Actions
              Violation 285/8511-01, dated June 26, 1985, involved failure to account
              for six surveillance
              ending  in July 1984,tests (STs),
                                      in the  files.performed  during the refueling outage
                                                      The licensee's response to this
              violation stated, in part, "Each month the surveillance test clerk will
              issue a list of STs that are due but not filed and those due but not
            completed.
                          Each
              indicating the      supervisor
                              status  of each will
                                                test.be required to respond to this list by
                                                        This status list will then be
            compiled and presented to the Plant Review Committee (PRC) by the
            Supervisor-Technical indicating those tests not completed /not filed and
            the action taken to assure completion / filing by the end of the next
            monthly review period."
            Contrary to the above, in deviation to that written comitment, a status
            list indicating the action taken to assure completion / filing by the end
            of the next monthly review period did not exist for a delinquent ST list
            dated March 2, 1988, which showed 11 STs dating from August 22, 1986,            t
            through  the end of the 1987 spring refueling outage, as being delinquent
            for filing.    (285/8810-03)
      Omaha Public Power District is hereby requested to submit a written statement
      or explanation to this Office within 30 days of the date of the letter
      transmitting this Notice. This reply, should include for each deviation:
      (1) the reason for the deviation if admitted, (2) the corrective steps that
      have been taken and the results achieved. (3) the corrective steps that will be
,
      taken to avoid further deviations, and (4) the date when full compliance will
      be achieved. Where good cause is shown, consideration will be given to
      extending the response time.
>
      Dated at Arlington, Texas,
      this              day of                1988.
                                                                                              ,
]
 
-
                          O                                *
@w[
                                          /
      of test results records for each procedure.    The TS surveillance
      requirements or IST component together with the associated test procedures
      reviewed by the NRC inspector are tabulated in the Attachment.
    The NRC inspector determined that the required tests were being scheduled
    and performed as required in accordance with approved procedures.
    Acceptance criteria were specified in the procedures and, with the
    exceptions discussed below, the records stated satisfaction of acceptance
    criteria. Appropriate instructions for returning equipment to service
    following testing were given. Some problems involving failure to complete
    timely reviews of completed test records are discussed in Section 2.a.
    above and an example is given below.
    The NRC inspector discovered that completed Procedure ST-NZ-1,
    Section F.1, for flow testing containment spray nozzles noted anomalies
    and deficiencies which had not been formally reviewed and dispositioned.
    Specifically, it was noted that ten nozzles were not tested because of
    inaccessibility and that one nozzle was not working properly. The test had
    been completed on May 8, 1987, and was listed as delinquent for filing in
    the list updated on March 2, 1988. The failure to evaluate the anomolies
    or deficiencies with these nozzles is an apparent violation of 10 CFR          i
    Part 50, Appendix B, Criterion XI, and the approved quality assurance          I
    program.    (285/8810-01)
    The NRC inspector discussed the deficiencies noted in the test record for
    ST-NZ-1 with plant management on March 15, 1988.      The NRC inspector        !
                                                                                    1
    expressed concern that the plant was restarted with the operability of the
    containment spray system undetermined. A second conc. n expressed was
    that the licensee's administrative procedures for followup on test
    deficiencies were apparently not followed. The Supervisor-Maintenance
    initiated an Incident Report on March 16, 1988, to address the test
    problems noted.    It contained the results of a preliminary safety analysis
                                                                                    i
    which indicated that over 100 spray nozzles must be plugged before the          i
    design flow rate of 5100 gpm would be decreased. The NRC inspector had no
    further safety concerns on this test.
    During the inspection, the NRC inspector requested records verifying the
    appropriate qualification level of examiners who completed reactor coolant
    system leak testing on May 29, 1987, and on June 1, 1987, in accordance
    with Procedure ST-RLT-1, Section F.1.    Because these records were not made
    available prior to the exit, it was discussed as an unresolved item.
    Copies of qualification records were subsequently forwarded by the
    licensee to the NRC Region IV office on March 22, 1988. The qualification
    record for the examiner completing the test on May 29, 1987, indicated he
    had only an ANSI N45.2.6, level I qualification for hydrostatic testing.
    Paragr6ph F.1.b.(2)(a) of ST-RLT-1 states that examiners must be qualified
    in accordance with ASME Section XI, Article IWA-2000. Paragraph IWA-2212
    of Article IWA-2000 requires the use of VT-2 visual examination for leak
    testing. Subarticle IWA-2300 requires qualification of personnel
                                                                                    l
                                                                                  -
}}

Latest revision as of 00:44, 15 November 2020

Forwards Notice of Violation & Notice of Deviation Re Insp Rept 50-285/88-10 on 880314-18.Documents Inadvertently Transmitted to Third Party One Day Before Rept Signed Out
ML20154J514
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/19/1988
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8805270025
Download: ML20154J514 (6)


See also: IR 05000285/1988010

Text

2*# Wg, UNITED STATES

! y% '

i , NUCLEAR REGULATORY COMMISSION

h. . ,b REGION IV

  • ,, 8 611 RYAN PLAZA DRIVE. SUITE 1000

k**"*8

,

ARLINGTfN,

MA I91988 TEXAS 79011

.

'

MEMORANDUM FOR: File

FROM: James L. Milhoan, Director, Division of Reactor Safety

SUBJECT: INADVERTENT RELEASE OF DRAFT MATERIAL

The purpose of this memorandum is to place in the PDR copies of documents

related to NRC Inspection Report 50-285/88-10. These documents were

inadvertently transmitted via fascimile to a third party on April 18, 1988,

the day before the report in question was signed out.

M

h James . lho n, Director

T Division of Reactor Safety

Enclosure: Ai stated

cc w/ enclosure:

R Martin, RIV

v?DR 50-285 File Copy

\*

k$$5270025880519

o ADOCK 05000285

PDR

.-, .--. . ._-

. - , _ _

---. . .- - -. . .-

' .

, /'

y T'< &,

p WNitto sTAYts ,

.

. > - NUCLEAR REGULATORY COMMISSION ' I.

'

l mt010N IV I

~

  • fit AY AN PL AZ A ORIVE. (Uif t 1000 l
    • * ARLINGTON. TEKAS M011

, ,, "

.

F ACSI'(ILE TRANSMITTAL

0ATEtrivt: -

/ff - _

PatentTY:

Imeetately /

1 Hout

,

2 4 Hours

%:

- QHbnd,d . O Ad4 A N

W@A

mtssact To: I

Mtssast m ox: EAlf . 2 / L/

wumsEn Or PAaEs: Y Plus TRAxsMITTAL SHEET

-57)l-16Y-31fl

TELECOPY NUMB

-S Ol-752 YERIFICATION MUMBER: O /~ /[_

COMhCT: '

'

/ IMM bod kJ 7 2#-J/3/ .

'

,

U

>

....................- m ......................................................

'

SPECIAL INSTRUCTIONS / ATTACHMENT ($):

,

,

,

i

l 1

................................... n ..............'..........................

.

& Verified by: D15P0$!71'Gt:

Trans tt' Return is %viginator V j

dd @ 4 d Place b 4$.1

l

! tdAME DATE Other _

i

1

e . .

,.,---.------,,--,.-,,-,-....,-,,,,-,n,-,-,---,--c~-----n,, - - - - - . - - - -

__m ,

a-

&

,

f f

,

APPENDIX A

_ NOTICE OF VIOLATION

Omaha Public Power District

Fort Calhoun Station Docket: 50-285

Operating License: DPR-40

During an NRC inspection conducted from March

NRC requirements were identified. 14-18, 1988, two violations of

resolve deficiencies identified during a surveillance test and failure

licensee

reactor coolant to verify

systemthe

leakcorrect

test. qualifications for an examiner completing a

Policy

(1987), the and Procedure

violations forbelow:

are listed NRC Enforcement Actions " 10 CFR Part 2

A.

Failure To Promptly Resolve Test Deficiencies ,

O

quality assurance program requires that a test program sI

established

satisfactorily. to assure that . . . systems and components will perfonn )

documented

satisfied. and evaluated to assure that test requirements ha

i

j

Contrary to the above, Surveillance Test ST-NZ-1 was completed on May 8, i

1987, with anamolies or deficiencies involving 11 nozzles. i

There was not

i an evaluation started of these anomalies or deficiencies

1988. until March 15,

This is a Severity Level IV violation.

(SupplementI)(285/8810-01)

B. j

Failure

Test Evaluationto Use Correct Qualification level of Examiner for Surveillance

i

Section 5.8.1 of the Technical Specifications (TS) requires that written

procedures and administrative policies shall be established, implemented

and 5.2 of ANSI N18.7-1972.and maintained that meet or exceed the minimum

Table 1 of G-26 of the licensee's Standing

Order G-26, R17. "Maintenance Quality Control Program," requires a minimum

level II capability for personnel who evaluate and report test results.

Contrary to the above, Surveillance Test ST-RLT-1, F.1 (leak test) results

were evaluated and reported on May

a lower capability level (Level 1). 29, 1987, by an individual qualified to

This is a Severity Level IV violation.

(SupplementI)(285/8810-02)

i

l

5

.

.J

<

.

..,

- O ^

2

Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is

hereby required to submit to this office, within 30 days of the date of the

letter transmitting this Notice, a written statement or explanation in reply,

including for each violation: (1) the reason for the violations if admitted,

(2) the corrective steps which have been taken and the results achieved,

(3) the corrective steps which will be taken to avoid further violations, and

(4) the date when full compliance will be achieved. Where good cause is shown,

consideration will be given to extending the response time.

Dated at Arlington, Texas,

this day of 1988.

l

l

.

. 3l

.

,e O

f7

}  !

!

APPENDIX B '

NOTICE OF DEVIATION

~0maha Public Power District Docket: 50-285

Fort Calhoun Station

Operating License: DPR-40

Based on the results of an NRC inspection conducted from March 14-18, 1988, a

deviation from your comitment was identified.

The deviation consisted of

failure to continue implementation of corrective actions comitted to in the

response to an NRC violation.

In accordance with the "General Statement of

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C

(1987), the deviation is listed below:

Failure to Continue Implementation of Corrective Actions

Violation 285/8511-01, dated June 26, 1985, involved failure to account

for six surveillance

ending in July 1984,tests (STs),

in the files.performed during the refueling outage

The licensee's response to this

violation stated, in part, "Each month the surveillance test clerk will

issue a list of STs that are due but not filed and those due but not

completed.

Each

indicating the supervisor

status of each will

test.be required to respond to this list by

This status list will then be

compiled and presented to the Plant Review Committee (PRC) by the

Supervisor-Technical indicating those tests not completed /not filed and

the action taken to assure completion / filing by the end of the next

monthly review period."

Contrary to the above, in deviation to that written comitment, a status

list indicating the action taken to assure completion / filing by the end

of the next monthly review period did not exist for a delinquent ST list

dated March 2, 1988, which showed 11 STs dating from August 22, 1986, t

through the end of the 1987 spring refueling outage, as being delinquent

for filing. (285/8810-03)

Omaha Public Power District is hereby requested to submit a written statement

or explanation to this Office within 30 days of the date of the letter

transmitting this Notice. This reply, should include for each deviation:

(1) the reason for the deviation if admitted, (2) the corrective steps that

have been taken and the results achieved. (3) the corrective steps that will be

,

taken to avoid further deviations, and (4) the date when full compliance will

be achieved. Where good cause is shown, consideration will be given to

extending the response time.

>

Dated at Arlington, Texas,

this day of 1988.

,

]

-

O *

@w[

/

of test results records for each procedure. The TS surveillance

requirements or IST component together with the associated test procedures

reviewed by the NRC inspector are tabulated in the Attachment.

The NRC inspector determined that the required tests were being scheduled

and performed as required in accordance with approved procedures.

Acceptance criteria were specified in the procedures and, with the

exceptions discussed below, the records stated satisfaction of acceptance

criteria. Appropriate instructions for returning equipment to service

following testing were given. Some problems involving failure to complete

timely reviews of completed test records are discussed in Section 2.a.

above and an example is given below.

The NRC inspector discovered that completed Procedure ST-NZ-1,

Section F.1, for flow testing containment spray nozzles noted anomalies

and deficiencies which had not been formally reviewed and dispositioned.

Specifically, it was noted that ten nozzles were not tested because of

inaccessibility and that one nozzle was not working properly. The test had

been completed on May 8, 1987, and was listed as delinquent for filing in

the list updated on March 2, 1988. The failure to evaluate the anomolies

or deficiencies with these nozzles is an apparent violation of 10 CFR i

Part 50, Appendix B, Criterion XI, and the approved quality assurance I

program. (285/8810-01)

The NRC inspector discussed the deficiencies noted in the test record for

ST-NZ-1 with plant management on March 15, 1988. The NRC inspector  !

1

expressed concern that the plant was restarted with the operability of the

containment spray system undetermined. A second conc. n expressed was

that the licensee's administrative procedures for followup on test

deficiencies were apparently not followed. The Supervisor-Maintenance

initiated an Incident Report on March 16, 1988, to address the test

problems noted. It contained the results of a preliminary safety analysis

i

which indicated that over 100 spray nozzles must be plugged before the i

design flow rate of 5100 gpm would be decreased. The NRC inspector had no

further safety concerns on this test.

During the inspection, the NRC inspector requested records verifying the

appropriate qualification level of examiners who completed reactor coolant

system leak testing on May 29, 1987, and on June 1, 1987, in accordance

with Procedure ST-RLT-1, Section F.1. Because these records were not made

available prior to the exit, it was discussed as an unresolved item.

Copies of qualification records were subsequently forwarded by the

licensee to the NRC Region IV office on March 22, 1988. The qualification

record for the examiner completing the test on May 29, 1987, indicated he

had only an ANSI N45.2.6, level I qualification for hydrostatic testing.

Paragr6ph F.1.b.(2)(a) of ST-RLT-1 states that examiners must be qualified

in accordance with ASME Section XI, Article IWA-2000. Paragraph IWA-2212

of Article IWA-2000 requires the use of VT-2 visual examination for leak

testing. Subarticle IWA-2300 requires qualification of personnel

l

-