MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210J9721999-08-0202 August 1999 Notification of 990817 Meeting with Util in Rockville,Md to Discuss Util Radiological Consequences Improvement Program Implementation,Program Impact on Util Response to GL 99-02 & Alternate Course of Action to Requirements Discussed in GL ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196J5661999-07-0101 July 1999 Notification of 990714 Meeting with OPPD & CE in Rockville, Maryland to Discuss Staff Concerns with OPPD PTLR Submittal & CEOG Topical Rept CE NPSD-683 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207G4241999-06-0202 June 1999 Notification of 990630 Meeting with Util in Fort Calhoun, Nebraska to Discuss Miscellaneous Management Topics & Plant Status ML20207D3251999-05-28028 May 1999 Notification of 990617 Meeting with Util in Blair,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Fort Calhoun Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205N1741999-04-12012 April 1999 Notification of Revised Licensee Meeting with Util on 990419 to Discuss Results of PPR Completed 990211.New Location of Meeting Will Be in Visiting Inspector room,2nd Floor at Fort Calhoun Station,Admin Bldg,Fort Calhoun,Ne ML20204J0221999-03-19019 March 1999 Notification of 990419 Meeting with Omaha Public Power District to Discuss Results of Plant Performance Review Completed on 990211 ML20207L7181999-03-0202 March 1999 Notification of 990318 Meeting with OPPD in Rockville, Maryland to Discuss OPPD NPSH Calculation Used to Support Fort Calhoun Station USAR Change to Take Credit for Containment Overpressure or Sump Subcooling ML20198M3071998-12-31031 December 1998 Notification of 990114 Meeting with Util in Rockville,Md to Discuss Fort Calhoun Station Radiological Consequences Improvement Program Issues & Implementation ML20196D3341998-11-24024 November 1998 Notification of 981204 Meeting with Util in Rockville,Md to Discuss Fort Calhoun Station Radiological Consequences Improvement Program Issues & Implementation ML20195B4071998-11-0404 November 1998 Notification of 981130 Licensee Meeting with Util in Arlington,Tx to Discuss Recent License Exam Results ML20154L3781998-10-15015 October 1998 Notification of 981020 Meeting W/Util to Discuss Regional Administrator OPPD Common Cause Analysis ML20154C2211998-10-0101 October 1998 Notification of Licensee Meeting with Util on 981015 in Arlington,Tx to Discuss Maint & Engineering Issues Related to turbine-driven & diesel-driven Auxiliary Feedwater Pumps Overspeed Events ML20153D7441998-09-21021 September 1998 Notification of 981006 Meeting with Util in Fort Calhoun,Ne to Discuss Common Cause Analysis ML20236X5111998-08-0606 August 1998 Notification of 980819 Meeting W/Omaha Public Power District in Rockville,Md to Discuss Fort Calhoun Station Refueling Outage Accomplishments,Challenges & Emerging Issues ML20236M9621998-07-0808 July 1998 Notification of 980723 Meeting W/Util in Arlington,Tx to Discuss Licensee Performance ML20249C6141998-06-22022 June 1998 Revised Notification of Licensee Meeting W/Util on 980710 to Discuss Switchyard Mods at Fort Calhoun Station ML20248L2961998-06-0505 June 1998 Notification of Significant Licensee Meeting W/Util on 980710 to Discuss Switchyard Mods at Fort Calhoun Station ML20247M1631998-05-14014 May 1998 Refers to GL 92-01,Rev 1,Supplement 1, Rv Structural Integrity, Issued in May 1995.RAI Re Plant 971013 Submittal of Revised Rv Weld Chemistry Valves Encl.Response Requested within 90 Days of Receipt of Ltr ML20217K3251998-04-28028 April 1998 Notification of 980505 Meeting W/Nebraska Public Power District in Arlington,Tx to Discuss Current Operations Dept Issues ML20203F7461998-02-23023 February 1998 Notification of 980309 Meeting W/Util in Arlington,Tx to Discuss Switchyard Mods at FCS ML20198E2091997-12-30030 December 1997 Requests Attached 4 Pages Be Placed in Docket File & Pdr. Suppl to 961120 Application to Amend Fort Calhoun License & Tss.Document Faxed Concurrence of License Commitment Re Relocation of Certain TS Requirements ML20199H2531997-11-24024 November 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) Fs Bandy,For Transmittal to Ofc of Fr for Publication.W/O Encl ML20198Q2461997-10-31031 October 1997 Notification of 971113 Meeting W/Util in Rockville,Md to Discuss Issues Related to FCS Fire Protection Improvements, USAR Verification & OPPD Proposal for Submitting Substantial TS Changes in Lieu of Coverting to Std TS ML20217B4311997-09-22022 September 1997 Notification of 971007 Predecisional Enforcement Conference W/Util in Arlington,Tx to Discuss Disabling of Containment Spray Sys ML20210N8801997-08-21021 August 1997 Notification of Licensee Meeting W/Util on 970924 in Blair, Ne to Discuss Systematic Assessment of Licensee Performance. Meeting Open to Attendance by Members of General Public ML20217M0521997-08-14014 August 1997 Informs That Operator Licensing Exams Administered on 970414-0506 at Fort Calhoun,Unit 1.Listed Info for Processing Through Nudocs & Distribution to NRC Staff Including NRC PDR Also Encl ML20210J0951997-08-0505 August 1997 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam at Facility on 971008.Requests That Listing of Names of Candidates for Exam Be Submitted to Listed Individuals by 970908 ML20141G9081997-07-0707 July 1997 Notification of 970721 Predecisional Enforcement Conference in Arlington,Texas to Discuss Apparent Violation of 10CFR50.65 Related to 970421 Steamline Rupture Event ML20138E3261997-04-29029 April 1997 Notification of Significant Licensee Meeting W/Util on 970505 to Discuss Steam Line Break,Root Cause Analysis & Corrective Actions ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20133H7781997-01-14014 January 1997 Notification of Significant Licensee Meeting W/Util on 970129 in Arlington,Tx to Discuss Issues Re Post-Accident Sample Sys ML20129E7041995-12-29029 December 1995 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 951204-08 ML20136A7871995-12-19019 December 1995 Partially Withheld Memo Discussing Petition Filed by Jf Doherty Requesting Six Plant Reactors Be Immediately Shutdown & Directors Decision 95-22 Which Denies Request NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059H8831994-01-24024 January 1994 Submits Daily Highlight Re 940127 Meeting W/Util in Rockville,Md to Discuss Plant Plans for Future Amends & Current Licensing Status ML20058K1231993-12-0202 December 1993 Forwards CS Wingo of FEMA Transmitting Final Exercise Rept for 930629 Exercise of Offsite Radiological Emergency Response Plans for Plant.Eight Deficiencies Noted During Exercise ML20057B3401993-09-13013 September 1993 Requests That NRR Provide Review of Concern Re Licensee TS Action Statement for Inoperable Channel for SIRWT Level to Determine If It Is Appropriate to Request Change Be Initiated to Plant TS ML20127E5081993-01-13013 January 1993 Notification of 930203 Meeting W/Util in Rockville,Md to Discuss Significant Plant Issues Such as Pts,Pra & Power Uprate & Current Status ML20126M2671992-12-24024 December 1992 Notification of Canceled 930107 Meeting in Rockville,Md Re Pressurized Thermal Shock,Probabalistic Risk Assessment & Plans for Future Power Uprate & Current Status.Proposed Agenda Encl ML20125B8211992-12-0404 December 1992 Notification of 921204 Meeting W/Util in Rockville,Md to Discuss Significant Plant Issues,Including Pts,Pra & Plan for Future Power Uprate & Current Status.Date Changed ML20128D1651992-11-24024 November 1992 Notification of 921209 Meeting W/Util in Rockville,Md to Discuss Significant Issues Such as Pts,Pra & Plans for Future Power Uprate & Current Status ML20055G4901990-07-16016 July 1990 Notification of 900726 Mgt Meeting W/Util in Omaha,Ne to Discuss SALP Rept 50-285/90-24 for May 1989 - Apr 1990 ML20198C4071990-06-22022 June 1990 Requests That NRR Review Basis of TS 2.16 to Determine If Basis Represents Nonconservative Approach to Safe Plant Operation ML20055C8721990-06-21021 June 1990 Notification of Significant Licensee Meeting W/Util on 900724 to Discuss Changes in Rev 6 of Examiner Stds & Exam Schedule for 1991 ML20248E8841989-10-0202 October 1989 Notification of 891005 Meeting W/Util in Region IV Ofc to Present Results of Licensee Evaluation of Delta T/Nuclear Power Deviation Anomaly 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210J9721999-08-0202 August 1999 Notification of 990817 Meeting with Util in Rockville,Md to Discuss Util Radiological Consequences Improvement Program Implementation,Program Impact on Util Response to GL 99-02 & Alternate Course of Action to Requirements Discussed in GL ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196J5661999-07-0101 July 1999 Notification of 990714 Meeting with OPPD & CE in Rockville, Maryland to Discuss Staff Concerns with OPPD PTLR Submittal & CEOG Topical Rept CE NPSD-683 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207G4241999-06-0202 June 1999 Notification of 990630 Meeting with Util in Fort Calhoun, Nebraska to Discuss Miscellaneous Management Topics & Plant Status ML20207D3251999-05-28028 May 1999 Notification of 990617 Meeting with Util in Blair,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Fort Calhoun Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205N1741999-04-12012 April 1999 Notification of Revised Licensee Meeting with Util on 990419 to Discuss Results of PPR Completed 990211.New Location of Meeting Will Be in Visiting Inspector room,2nd Floor at Fort Calhoun Station,Admin Bldg,Fort Calhoun,Ne ML20204J0221999-03-19019 March 1999 Notification of 990419 Meeting with Omaha Public Power District to Discuss Results of Plant Performance Review Completed on 990211 ML20207L7181999-03-0202 March 1999 Notification of 990318 Meeting with OPPD in Rockville, Maryland to Discuss OPPD NPSH Calculation Used to Support Fort Calhoun Station USAR Change to Take Credit for Containment Overpressure or Sump Subcooling ML20198M3071998-12-31031 December 1998 Notification of 990114 Meeting with Util in Rockville,Md to Discuss Fort Calhoun Station Radiological Consequences Improvement Program Issues & Implementation ML20196D3341998-11-24024 November 1998 Notification of 981204 Meeting with Util in Rockville,Md to Discuss Fort Calhoun Station Radiological Consequences Improvement Program Issues & Implementation ML20195B4071998-11-0404 November 1998 Notification of 981130 Licensee Meeting with Util in Arlington,Tx to Discuss Recent License Exam Results ML20154L3781998-10-15015 October 1998 Notification of 981020 Meeting W/Util to Discuss Regional Administrator OPPD Common Cause Analysis ML20154C2211998-10-0101 October 1998 Notification of Licensee Meeting with Util on 981015 in Arlington,Tx to Discuss Maint & Engineering Issues Related to turbine-driven & diesel-driven Auxiliary Feedwater Pumps Overspeed Events ML20153D7441998-09-21021 September 1998 Notification of 981006 Meeting with Util in Fort Calhoun,Ne to Discuss Common Cause Analysis ML20236X5111998-08-0606 August 1998 Notification of 980819 Meeting W/Omaha Public Power District in Rockville,Md to Discuss Fort Calhoun Station Refueling Outage Accomplishments,Challenges & Emerging Issues ML20236M9621998-07-0808 July 1998 Notification of 980723 Meeting W/Util in Arlington,Tx to Discuss Licensee Performance ML20249C6141998-06-22022 June 1998 Revised Notification of Licensee Meeting W/Util on 980710 to Discuss Switchyard Mods at Fort Calhoun Station ML20248L2961998-06-0505 June 1998 Notification of Significant Licensee Meeting W/Util on 980710 to Discuss Switchyard Mods at Fort Calhoun Station ML20247M1631998-05-14014 May 1998 Refers to GL 92-01,Rev 1,Supplement 1, Rv Structural Integrity, Issued in May 1995.RAI Re Plant 971013 Submittal of Revised Rv Weld Chemistry Valves Encl.Response Requested within 90 Days of Receipt of Ltr ML20217K3251998-04-28028 April 1998 Notification of 980505 Meeting W/Nebraska Public Power District in Arlington,Tx to Discuss Current Operations Dept Issues ML20203F7461998-02-23023 February 1998 Notification of 980309 Meeting W/Util in Arlington,Tx to Discuss Switchyard Mods at FCS ML20198E2091997-12-30030 December 1997 Requests Attached 4 Pages Be Placed in Docket File & Pdr. Suppl to 961120 Application to Amend Fort Calhoun License & Tss.Document Faxed Concurrence of License Commitment Re Relocation of Certain TS Requirements ML20199H2531997-11-24024 November 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) Fs Bandy,For Transmittal to Ofc of Fr for Publication.W/O Encl ML20198Q2461997-10-31031 October 1997 Notification of 971113 Meeting W/Util in Rockville,Md to Discuss Issues Related to FCS Fire Protection Improvements, USAR Verification & OPPD Proposal for Submitting Substantial TS Changes in Lieu of Coverting to Std TS ML20217B4311997-09-22022 September 1997 Notification of 971007 Predecisional Enforcement Conference W/Util in Arlington,Tx to Discuss Disabling of Containment Spray Sys ML20210N8801997-08-21021 August 1997 Notification of Licensee Meeting W/Util on 970924 in Blair, Ne to Discuss Systematic Assessment of Licensee Performance. Meeting Open to Attendance by Members of General Public ML20217M0521997-08-14014 August 1997 Informs That Operator Licensing Exams Administered on 970414-0506 at Fort Calhoun,Unit 1.Listed Info for Processing Through Nudocs & Distribution to NRC Staff Including NRC PDR Also Encl ML20210J0951997-08-0505 August 1997 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam at Facility on 971008.Requests That Listing of Names of Candidates for Exam Be Submitted to Listed Individuals by 970908 ML20141G9081997-07-0707 July 1997 Notification of 970721 Predecisional Enforcement Conference in Arlington,Texas to Discuss Apparent Violation of 10CFR50.65 Related to 970421 Steamline Rupture Event ML20138E3261997-04-29029 April 1997 Notification of Significant Licensee Meeting W/Util on 970505 to Discuss Steam Line Break,Root Cause Analysis & Corrective Actions ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20133H7781997-01-14014 January 1997 Notification of Significant Licensee Meeting W/Util on 970129 in Arlington,Tx to Discuss Issues Re Post-Accident Sample Sys ML20129E7041995-12-29029 December 1995 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 951204-08 ML20136A7871995-12-19019 December 1995 Partially Withheld Memo Discussing Petition Filed by Jf Doherty Requesting Six Plant Reactors Be Immediately Shutdown & Directors Decision 95-22 Which Denies Request NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059H8831994-01-24024 January 1994 Submits Daily Highlight Re 940127 Meeting W/Util in Rockville,Md to Discuss Plant Plans for Future Amends & Current Licensing Status ML20058K1231993-12-0202 December 1993 Forwards CS Wingo of FEMA Transmitting Final Exercise Rept for 930629 Exercise of Offsite Radiological Emergency Response Plans for Plant.Eight Deficiencies Noted During Exercise ML20057B3401993-09-13013 September 1993 Requests That NRR Provide Review of Concern Re Licensee TS Action Statement for Inoperable Channel for SIRWT Level to Determine If It Is Appropriate to Request Change Be Initiated to Plant TS ML20127E5081993-01-13013 January 1993 Notification of 930203 Meeting W/Util in Rockville,Md to Discuss Significant Plant Issues Such as Pts,Pra & Power Uprate & Current Status ML20126M2671992-12-24024 December 1992 Notification of Canceled 930107 Meeting in Rockville,Md Re Pressurized Thermal Shock,Probabalistic Risk Assessment & Plans for Future Power Uprate & Current Status.Proposed Agenda Encl ML20125B8211992-12-0404 December 1992 Notification of 921204 Meeting W/Util in Rockville,Md to Discuss Significant Plant Issues,Including Pts,Pra & Plan for Future Power Uprate & Current Status.Date Changed ML20128D1651992-11-24024 November 1992 Notification of 921209 Meeting W/Util in Rockville,Md to Discuss Significant Issues Such as Pts,Pra & Plans for Future Power Uprate & Current Status ML20055G4901990-07-16016 July 1990 Notification of 900726 Mgt Meeting W/Util in Omaha,Ne to Discuss SALP Rept 50-285/90-24 for May 1989 - Apr 1990 ML20198C4071990-06-22022 June 1990 Requests That NRR Review Basis of TS 2.16 to Determine If Basis Represents Nonconservative Approach to Safe Plant Operation ML20055C8721990-06-21021 June 1990 Notification of Significant Licensee Meeting W/Util on 900724 to Discuss Changes in Rev 6 of Examiner Stds & Exam Schedule for 1991 ML20248E8841989-10-0202 October 1989 Notification of 891005 Meeting W/Util in Region IV Ofc to Present Results of Licensee Evaluation of Delta T/Nuclear Power Deviation Anomaly 1999-08-27
[Table view] |
Text
W' l<p .
- IDocket No. 50-285 November 24, 1992
"\ MEMORANDUM FOR: John T. Larkins, Director Project Directorate IV-1 Division of Reactor Projects III/IV/V Office of Nuclear Reacte- Regulation-FROM: Steven D. Bloom, Project Manager Project Directorate IV-1
- l. Division of Reactor Projects III/IV/V , ,
Office of Nuclear Reactor Regulation-
SUBJECT:
FORTHCOMING MEETING WITH OMAHA PUBLIC POWER DISTRICT - FORT CALHOUN SiATION DATE & TIME: Wednesday, December'9, 1992 - 10:30 to 12:00 LOCATION: One Whits Flint North 11555 Rockville Pike
.Rockville, Maryland 20852 Room 12 B 11 PURPOSE: To discuss significant Fort Calhoun Station issues such as pressurized thermal shock, probablistic risk ,
assessment-and rians for future power uprate and current status.
PARTICIPANTS *: NRC QPf3 T. Murley B. Jones J. Partlow W. Gates J. Roe S. Gambhir M. Virgilio R. Short J. Larkins S. Bloom ORIrdNAL SIGNED BY:
c" jMO Steyr. D. Bloom, Projec.t Manager Project Directosate IV-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation Enclo.ure: Proposed Agenda cc w/ enclosure: See next page
- Meetings between NRC technical staff and applicants or licensees are open for
-interested me.nbers of the public, pctitioners, intervenors, or other parties
-to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal- Reaister 28058,6/28/78.
..see Distribution next page $t N $$ Y$hb??
LA:PDIVGA,PM:,PDIV-1 OFC D:PDIV-1 NAME PNoonah SBNm/vw JLMns 1 DATE J/ /Y/92 /tT/92 : N/b/92
,0FFICIALRECORDCOPy Document Name: G:0EC095iE.N0T 9212070166 921124- 1
-PDR ADOCK 05000285 ' (n
/
@ _ .i P _i PDR h
4
=
+ f.Mapk ,
c 6 UNITED STATES y'O . ,1 = -NUCLEAR REGULATORY COMMISSION - .
' o, g WASHINoToN, D.C. 20666 .
%' * * * * / Novomber 2'4. 1992 Docket No. 50-285.
MEMORANDUH FOR: . John T. Larkins, Director Project Directorate IV-1 Division'of-Reactor Projects III/IV/V '
Office of Nuclear Reactor Regulation FROM: Steven D. Bloom, Project Manager Project Directorate IV-1 ,
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH OMAHA PUBLIC POWER DISTRICT - FORT CALHOUN STATION DATE & TIME: Wednesday, December 9, 1992 - 10:30 to 12:00 ;
LOCATION: One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 12 8 11 PURPOSE: To discuss significant Fort Calhoun .1-tion issues.auch as pressurized thermal shock, probablistic risk assessment and plans for future power uprate and current status.
PARTICIPANTS *: NRC QEEQ T. Murley- B. Jones J. Partlow W. Gates J. Roe S.-Gambhir M. Virgilio R. Short J. -- Larkins '
S. Bloom v
Steven D. Bloom, Project Manager Project Directorate IV-1 Division of-Reactor Projects III/IV/V Office'of-Nuclear Reactor Regulation
Enclosure:
Proposed Agenda cc w/ enclosure: See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties
--to attend as. observers pursuant to'"Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058,6/28/78.
1.
Omaha Public Power District fort Calhoun Station, Unit No. 1 CC:
Mr. W. Gary Gates Division Manager - Nuclear Services Omaha Public Power District -
444 South 16th Street Hall Omaha, Nebraska 68102-2247 Harry H. Voigt, Esg.
LeBoeuf, Lamb, Leiby &'MacRae 1875 Connecticut Avenue, NW Washington, D.C. 20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors ,
Blair,_ Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commiss on Post Office Box 309 fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Hebraska Department of Health 1301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 Mr. T. L. Pattersor,, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023 c ,-im-
O I
NRC/0 PPD MANAGEMENT MEETING - DECEMBER 9, 1992 L
PROPOSED AGENDA OPENING COMMENTS BILL JONES FCS PERFORMANCE INDICATORS GILL J0NES POWER UPRATE BILL JONES ,
PRESSURIZED THERMAL SHOCK SUDESH GAMBHIR PRA/IPE/IPEEE PROJECTS SUDESH GAMBHIR DESIGN BASIS RECONSTITUTION SUDESH GAMBHIR SPENT FUEL POOL RERACKING SUDESH GAMBHIR LESSONS LEARNED FROM JULY 3, 1992 EVENT GARY GATES 1993 CHALLENGES GARY GATES NRC QUESTIONS NRC
DISTRIBUTION: