ML20138E326

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 970505 to Discuss Steam Line Break,Root Cause Analysis & Corrective Actions
ML20138E326
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/29/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9705020153
Download: ML20138E326 (4)


Text

. .,m._.__.___ .._____.___.-._.-.__.._.m..__- _.__...-.m-.. . _ _ - .

l, g > A a t ,, UNtTED ST ATES f, NUCLEAR REGULATORY COMMISSION

[ .T.

tdh((

f[t } necioN ev Gli HY AN PL AZA DRIVE SUITE 400 l  % , , ,' , , ' ^R'*Gg 7]S ig2[ g am NOTICE OF LICENSEE MEETING Name of Licensee: Omaha Public Power District Name of Facility: Fort Calhoun Station Docket: 50-285 Date and Time May 5,1997 of Meeting: 1 p.m. (CDT)

Location of Meeting: Fort Calhoun Station Blair, Nebraska Purposes of Meeting: (1) Topics related to steam line break, root cause analysis, and

corrective actions (2) Exit meeting for specialinspection related to the extraction steam line break (tentative) j NRC Attendees
E. Merschoff, Regional Administrator A. Howell, Director, Division of Reactor Safety (DRS)

K. E. Brockman, Deputy Director, Division of Reactor Projects (DRP)  !

T. F. Stetka, Senior Reactor inspector, DRS J. L. Shackelford, Senior Reactor Analyst, DRS D. N. Graves, Senior Project Engineer, DRP  !

W. C. Walker, Senior Resident inspector, DRP V. G. Gaddy, Resident Inspector, DRP Licensee Attendees: W. G. Gates, Vice President S. K. Gambhir, Division Manager - Production Engineering J. W. Chase, Manager - Fort Calhoun Station R. L. Phelps, Manager - Station Engineering Nuclear J. Tills, Manager - Nuclear Licensing B. Lisowyj, Erosion / Corrosion Program Engineer NOTE:

(1) This meeting is open to attendance by members of the general public. /7 lO (2) NRC personnel, not listed above, that desire to attend this meeting should notify '

W. D. Johnson at (817) 860-8148 by COB May 1,1997.

/ ,/

t Approved By: A<-.-- -

Thomas P. Gwyd[n,J')ireg'tof i Division of ReactofProjects 9705020153 970429 PDR ADOCK 05000285 G PDR - ll....,...

ll ll ll llilll l lll

Omaha Public Power District  !

l l

I cc: I S. K. Gambhir, Division Manager Production Engineering Omaha Public Power District I Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399  ;

James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 i Perry D. Robinson, Esq.

Winston & Strewn 1400 L. Street, N.W.

Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 l

[

l Omaha Public Power District APR 2 91997 i

i E-Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator i JKR E. L. Jordan, DEDO  ;

PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR l RPZ R. P. Zimmerrnan, ADP/NRR '

LRW R. Wharton, Project Manager, NRR l OEMAIL J. Lieberrnan, D/OE l LJC L. J. Chandler, OGC j CAH C. A. Hackney, RSLO j DMK1 D. M. Kunihiro, WCFO i GFS G. F. Sanborn, EO  !

BWH B. Henderson, PAO MFH2 M. Hammond, PAO j KEP Ken Perkins, Director, WCFO l JAC1, CMS, CJG RA Secretaries )

LAT, DLF, CAM 3 DRP Di"'-ion j C.G, LMB, DXY DRS Division  !

CLS1, NLH, WSW DNMS Division l LSO Linda Ousley j I

cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File l

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No RIV:DRP/B l C:DRP/B D D:DRSr/l PA0 lNt RSLO l/

DNGraves:dfLM WDJohnson7 ATHowbu BWHenderson~ CAHackney 4/ M /97 4/ M /97 4/y /97 4/f//97 4/ M /97 D:DRP _ IJ IPGwynn \]/9 4/ 29 /97 /

OFFICIAL RECORD COPY l

l

)

)

Orraha Public Power District APR 2 91997 E-Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator j JKR E. L. Jordan, DEDO l PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR LRW R. Wharton, Project Manager, NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division CLG, LMB, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File "E" = Copy wth enclosures "N" = No c To receive copy of document, indicate in box: "C" = Copy without enclosures C:DRP/B () D:DRS 7 / l PA0 l Sit RSLO l/

h/:DRP/B l ATHowbU BWHenderson' CAHackney hDr.3 raves:df P WDJohnsor/7 4 [47M /97 4/ M /97 " 4/ y /97 4/0 6f/97 4/M /97 6J l l l D:DRP _ l IPGwynn \]//j/

4/29/97 /

OFFICIAL RECORD COPY

_ _ - _ _