tk* *' W%,
UNITED ST ATEs
.s
[$
. 't NUCLEAR REGULATORY COMMISSION
- 2 c
l8 i
REGION Iv Y
' t
^
S.,
s j
611 RY AN PLAZA DRIVE, SUITE 400
t J'
AR LINGT ON, TE X AS 76011 8064 9 * " *
- JAN I 41997 NOTICE OF LICENSEE MEETING Name of Licensee:
Omaha Public Power District Name of Facility:
Fort Calhoun Station Docket:
50-285 l
EA No.:
96-489 Date and Time January 29,1997 of Meeting:
1 p.m. (CST)
Location of Meeting:
NRC Region IV Office, Arlington, Texas
]
Training Conference Room (4th Floor)
Purpose of Meeting:
Predecisional Enforcement Conference to Discuss issues Regarding the Post-Accident Sample System NRC Attendues:
J. Dyer, Director, Division of Reactor Projects (DRP)
T. Gwynn, Director, Division of Reactor Safety (DRS)
W. Bateman, Director, Project Directorate IV-2, (PDIV-2) Office of Nuclear Reactor Regulation (NRR)
A. Howell, Deputy Director, DRP W. Johnson, Chief, Project Branch B, DRP 1
B. Murray, Chief, Plant Support Branch, DRS W. Walker, Senior Resident inspector R. Wharton, Project Manager, NRR D. Graves, Senior Project Engineer, DRP M. Vasquez, Enforcement Specialist V. Gaddy, Resident inspector Licensee Attendees:
W. Gates, Vice President S. Gambhir, Division Manager, Production Engineering R. Andrews, Division Manager, Nuclear Services J. Chase, Manager, Fort Calhoun Station D. Spires, Manager, Chemistry J. Tills, Manager, Nuclear Licensing C. Fritts, System Engineer j
i NOTE:
)
}
(1)
This meeting is open to attendance by rnembers of the general public.
I i
9701170286 970114 PDR ADOCK 05000285 P
o ATTACHMENT 4 LIST OF ACRONYMS USED AITS Action item Tracking System l
ALARA As Low As Reasonably Achievable CEDE Committed Effective Dose Equivalent I
CFR Code of Federal Regulations CRS Control Room Supervisor DSSS Director, Site Support Services EAL Emergency Action Level ECR Engineering Change Request EDG Emergency Diesel Generator EHC Electro-hydraulic Control
)
EO Equipment Operator EOC End-of-Cycle l
EOF Emergency Operations Facility i
EP Emergency Preparedness EPZ Emergency Planning Zone ERO Emergency Response Organization l
ERP Emergency Response Procedure ESF Engineered Safety Feature ETT Equipment Trouble Tag FME Foreign Material Exclusion HCU Hydraulic Control Unit HP Health Physics HPCI High Pressure Coolant injection IFl Inspection Follow-up ltem ISEG Independent Safety Engineering Group l&C Instrumentation and Control LCO Limiting Condition For Operation LER Licensee Event Report LFIN Limerick Fix-It-Now LOCA Loss of Coolant Accident LOOP Loss of Offsite Power NCV Non-Cited Violation l
NMD Nuclear Maintenance Division NOA Nuclear Quality Assurance NRB Nuclear Review Board NRC Nuclear Regulatory Commission OSC Operations Support Center PCIG Primary Containment Instrument Gas PEP Performance Enhancement Process l
PORC Plant Operations Review Committee l
RCA Radiological Controlled Area RETS Relayed Emergency Trip Supply RFP Reactor Feed Pump RHR Residual Heat Removal RO Reactor Operator RP&C Radiological Protection and Chemistry
(
4 ATTACHMENT 'e EMERGENCY RESPONSE PLAN AND IMPLEMENTING PFiOCEDURES REVIEWED Document Document Title Revision Nuclear Emergency Plan 11,12 ESP-101 Classification of Emergencies 4-7 ESP-106 Written Summary Notification 3
ESP-110 Emergency Notification 12-18 ESP-120 Station Evacuations 4, 5 ESP-140 Staffing Augmentation 6
ESP-200 Emergency Director (ED) Response 5-8 ESP-230 Operations Support Center (OSC) Director 3-7 ESP-300 TSC/MCR Dose Assessment Team 12-16 ESP-340 Field Survey Group 5, 6 ESP-360 Adjustment of Wide Range Gas Monitor Conv. Factors 2
{
ESP-400 Chemistry Sampling and Analysis Team 8-10 ESP-440 Off-site Analysis of High Activity Samples 2
ESP-500 Security Team 10-14 ESP-600 Health Physics Team 8, 9 ESP-630 Vehicle and Evacuee Control Group 3
ESP-640 Emergency Response Facility Habitability 6
ESP-650 Entry for Emergency Repair and Operations 5, 6 ESP-660 Distribution of Thyroid Blocking Tablets 4
ESP-700 Technical Support Team 9,10 ESP-800 Maintenance Team 9-15 ESP-C-1200 Emergency Response Manager 5
ESP-C-1300 Emergency Operations Facility (EOF) Dose Assessment Team Leader 5
. _ _ _.... _ _ -. _. _. _ _ _ _ _ _. ~. -. _.. -.. - -....
i i
l I
i l
ATTACHMENT 3 INSPECTION PROCEDURES USED l
IP 37551:
Onsite Engineering IP 61726:
Surveillance Observation IP 62707:
Maintenance Observation IP 71707:
Plant Operations l
lP 82701:
Operational Status of the Emergency Preparedness Program IP 83750:
Occupational Radiation Exposure IP 90712:
In-office Review of Written Reports IP 93702:
Prompt Onsite Response to Events at Operating Power Reactors Temporary instruction 2515/134: Licensee On-Shift Dose Assessment Capabilities l
l ITEMS OPENED, CLOSED, AND DISCUSSED j
Ooened i
I 352,353/96-09-01 URI Apparent non-compliance with fire safe shutdown license condition (E1.3) l 352/96-09-02 URI Degraded HPCI speed sensor (E8.1) l l
t 352,353/96-09-03 VIO Failure to provide a complete description of the proposed manner and l
conditions of waste disposal (relative to the presence of the concrete
)
l slab) (R2.1) l-Closed j
None Discussed 352,353/96-04-02 URI UFSAR not updated to reflect current practices relative to processing or storage of radioactive waste (R8.1)
O 2
RP Radiation Protection RPS Reactor Protection System RPM Radiation Protection Manger RWP Radiation Work Permit SRV Safety Relief Valve TCV Turbine Control Valve TEDE Total Effective Dose Equivalent TRIP Transient Response implementation Plan TS Technical Specification TSC Technical Support Center UFSAR Updated Final Safety Analysis Report URI Unresolved item
- VIO Violation 1
4
b Omaha Public Power District (2)
NRC personnel, not listed above, that desire to attend this meeting should notify W. Johnson at (817) 860-8148 by COB on January 24,1997.
Approved By:
f J. E. Dyer, Director Division of Reactor Projects u
cc:
S. K. Gambhir, Division Manager Production Engineering Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Tills, Manager Nuclear Licensing Omaha Public Power District i
Fort Calhoun Station FC-2-4 Adm.
i P.O. Box 399 l
Hwy. 75 - North of Fort Calhoun l
Fort Calhoun, Nebraska 68023-0399
(
James W. Chase, Manager l
Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section 1
Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 f
JAN I 41997 Omaha Public Power District J E-Mail To:
FOR (11)
NRC Attendees PMNS Mtg Announccment Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompsor cDS FMJ F. J. Miraglia, Al0/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:
DMB (IE 45)
OEDO RIV Coordinator (17G21)
Receptionist ORA File RIV File DOCUMENT NAME:
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/B l
C:DRP/EQ l PAO
@}&
RSLO l tag D:DRPy l DNGraves;cm(A WDJohr$on BWHendersor, CAHackney J EDy@r' '
1/,0 /97 l
1/ g/97 1/10/97 1/L9/97 1/ 4/97 OFFICIAL RECORD COPY
JAN I 41997 Omaha Public Power District E-Mail To:
FOR (11)
NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR t
PAB H. L. Thompson, DEDS i
FMJ F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro. WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:
DMB (IE 45)
OEDO RIV Coordinator (17321)
Receptionist ORA File RIV File a
170079 DOCUMENT NAME:
To receive copy of document. Indicate in box: "C" = Copy wdhout enclosures "E" = Copy with enclosures "N" = No copy Q
PE:DRP/B l
C:DRP/EQ l PAO l @pr RSLO l tag D:DRPg l DNGraves;cnp WDJohr(fon BWHenderson CAHackney J EDy@r' '
1/; /97 l
1/ p/97 1/10/9 7 1/L3/97 1/ 4197 OFFICIAL RECORD COPY i
Tuboscope Vetco International, Inc. bcc:
DMB - Original (IE-07)
LJCallan DBSpitzberg FAWenslawski CLCain LLHowell WHRadcliffe NMI&FC/DB (5th Floor)
MIS System RIV Nuclear Materials File - 5th Floor i
DOCUMENT NAME: G:\\NMIS.O\\WHR2\\06399AK1.701 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:NMI&FC/DB l M C:NMI&FC/[% l l
l l
WHRadcliffe LLHowell @