ML20134B292: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:__
JAN 2 71997 Docket No.T50-1169 l
l Dr. Daniel B. Bullen 4
Mechanical Engineering Department Nuclear Engineering Program Iowa State University                                                              l 261 Sweeny Hall                                                                    1 Ames, Iowa 50010                                                                  .
i
 
==Dear Dr. Bullen:==
i
 
==SUBJECT:==
INITIAL RESULTS - IOWA STATE UNIVERSITY l
Enclosed is a copy of the results of the Operator Initial Examination conducted at Iowa State University on January 13, 1997.
Sincerely,                                  I l
Seymour H. Weiss, Director                  l Non-Power Reactors and Decommissioning      i Project Directorate Division of Reactor Program Management Office of Nuclear Peactor Regulation
 
==Enclosures:==
: 1. Summary Sheet
: 2. Candidate's Form 301N
: 3. Candidate's Answer Sheets Distribution: w/o encls. 2 & 3 OLB/LA Summary Sheet File (DMcCain)
Facility File (DMcCain)
Distribution: w/o enci
  '; Docket; Files i SWeiss WEresian tral Files h
300021                                                                g' o GbP D:PQDN 0:DRPM                                      \T O'' -
H    PDPjlMDR D        :dm WEresian    ' SWei g s 01S'797        01/4 79      01/1 /97 9701300021 970127 PDR Y        ADOCK 05000116 PDR}}

Latest revision as of 23:08, 22 July 2020

Forwards Results of Operator Initial Exam Conducted at Iowa State Univ on 970113.W/o Encl
ML20134B292
Person / Time
Site: University of Iowa
Issue date: 01/27/1997
From: Weiss S
NRC (Affiliation Not Assigned)
To: Bullen D
IOWA STATE UNIV., AMES, IA
References
NUDOCS 9701300021
Download: ML20134B292 (1)


Text

__

JAN 2 71997 Docket No.T50-1169 l

l Dr. Daniel B. Bullen 4

Mechanical Engineering Department Nuclear Engineering Program Iowa State University l 261 Sweeny Hall 1 Ames, Iowa 50010 .

i

Dear Dr. Bullen:

i

SUBJECT:

INITIAL RESULTS - IOWA STATE UNIVERSITY l

Enclosed is a copy of the results of the Operator Initial Examination conducted at Iowa State University on January 13, 1997.

Sincerely, I l

Seymour H. Weiss, Director l Non-Power Reactors and Decommissioning i Project Directorate Division of Reactor Program Management Office of Nuclear Peactor Regulation

Enclosures:

1. Summary Sheet
2. Candidate's Form 301N
3. Candidate's Answer Sheets Distribution: w/o encls. 2 & 3 OLB/LA Summary Sheet File (DMcCain)

Facility File (DMcCain)

Distribution: w/o enci

'; Docket; Files i SWeiss WEresian tral Files h

300021 g' o GbP D:PQDN 0:DRPM \T O -

H PDPjlMDR D :dm WEresian ' SWei g s 01S'797 01/4 79 01/1 /97 9701300021 970127 PDR Y ADOCK 05000116 PDR