Revised Proposed Tech Specs Reinstating Senior Reactor Operator Requirement for Operations Manager & Deleting Addition of Operations Supervisor to Plant Operations Review CommitteeML17254A717 |
Person / Time |
---|
Site: |
Ginna |
---|
Issue date: |
01/06/1986 |
---|
From: |
ROCHESTER GAS & ELECTRIC CORP. |
---|
To: |
|
---|
Shared Package |
---|
ML17254A716 |
List: |
---|
References |
---|
NUDOCS 8601130381 |
Download: ML17254A717 (20) |
|
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements ML17264A8491997-03-31031 March 1997 Proposed Tech Specs 3.7.12 Re Spent Fuel Pool Boron Concentration ML17264A7601996-12-16016 December 1996 Proposed Annual TS Bases ML17264A7131996-10-29029 October 1996 Proposed Tech Specs Re Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump ML17264A6001996-09-13013 September 1996 Proposed Tech Specs Re RCS Pressure & Temp Limits Rept ML17264A5301996-06-0303 June 1996 Proposed Tech Specs Re Update to Correction of Typographical Error Request ML17264A5111996-05-29029 May 1996 Proposed Tech Specs Pages 3.3-18 & 3.3-19,reflecting Revs to LCO 3.3.1 ML17264A4711996-05-0808 May 1996 Proposed Tech Specs,Correcting Typos ML17264A4081996-03-20020 March 1996 Proposed Tech Specs 3.9.3,Containment Penetrations Re Use of Roll Up Door & Associated Encl Building for LCO 3.9.3 Requirements ML17264A4051996-03-15015 March 1996 Proposed Tech Specs Changing Section 5.6.6 Page 5.0-22 to Incorporate Methodology for Determining RCS P/T & LTOP Limits Into Administrative Controls Section for RCS P/T Limits Rept ML17264A3451996-02-0909 February 1996 Proposed Tech Specs,Revising Setpoints for SG Water Level High Feedwater Isolation Function ML17264A3401996-02-0909 February 1996 Proposed Tech Specs Re LTOP Limits Using Util Proposed Methodology ML17264A3341996-02-0909 February 1996 Proposed Tech Specs Containment Requirements During Mode 6 Cost Beneficial Licensing Action ML17264A3231996-01-26026 January 1996 Proposed Tech Specs Re Nuclear Fuel Cycle for NRC Approval ML17264A2811995-12-0808 December 1995 Proposed Tech Specs Re Changes to Current RCS Pressure & Temp Limits for Heatup,Cooldown,Criticality & Hydrostatic Testing ML17264A2531995-11-27027 November 1995 Proposed Tech Specs for Implementation of 10CFR50,App J, Option B ML17264A2571995-11-20020 November 1995 Proposed Tech Specs,Discussing Changes to TS Instrumentation Requirements & Conversion to Improved TS ML17264A2491995-11-20020 November 1995 Proposed Tech Specs Re Ventilation Filter Testing Program ML17264A1511995-08-31031 August 1995 Proposed Tech Specs Implementing WCAP-10271,its Assoc Suppls & Other Re Changes W/Respect to RTS & ESFAS ML17263A9781995-03-13013 March 1995 Proposed Tech Specs to Revise TS 4.4.2.4.a,replacing Specific Leakage Testing Frequencies for Containment Isolation Valves ML17263A7901994-09-27027 September 1994 Proposed TS Section 6.0, Administrative Controls. ML17263A7281994-07-15015 July 1994 Proposed Tech Specs Providing NRC W/Opportunity to Communicate at Early Stage Any Concerns W/Respect to Differences from NUREG-1431 ML17263A6581994-05-23023 May 1994 Proposed Tech Specs,Increasing Allowable Reactor Coolant Activity Levels ML17263A6431994-05-13013 May 1994 Proposed Tech Specs Administrative Section 6.0 ML17263A3701993-08-20020 August 1993 Corrected Proposed TS Page 5.1-1,changing Word Released to Leased ML17263A3571993-08-0606 August 1993 Proposed Tech Specs Re Alternative Requirements for Snubber Visual Insp Intervals ML17263A3191993-07-15015 July 1993 Proposed Tech Specs,Removing Containment Isolation Valve Table 3.6-1 from TS ML17263A2101993-04-0505 April 1993 Proposed TS Table 3.6-1, Containment Isolation Valves. ML17262B1191992-12-17017 December 1992 Proposed Tech Specs Sections 3.2 & 3.3 Re Acid Storage Tank Boron Concentration Reduction Study ML17309A5021992-11-30030 November 1992 Proposed Tech Specs Reflecting Removal of Table of Containment Isolation Valves ML17262B0441992-10-0808 October 1992 Proposed TS 3.7.1 Re Auxiliary Electrical Sys ML17262B0211992-09-15015 September 1992 Proposed Tech Specs Sections 3.1.1.4,3.1.1.6 & 4.3.4, Addressing GL 90-06, Resolution of Generic Issue 70, 'Porv & Block Valve Reliability' & Generic Issues 94, 'Addl LTOP for Lwrs.' ML17262A9141992-06-22022 June 1992 Proposed TS 4.3.1 Re Reactor Vessel Matl Surveillance Testing ML17262A8321992-04-23023 April 1992 Proposed Tech Specs Re Snubber Visual Insp Schedule ML17262A8221992-04-21021 April 1992 Proposed Tech Specs Re Fire Protection Program ML17262A7871992-03-23023 March 1992 Proposed Tech Spec Revising Section 6.5.1 Re Plant Operations Review Committee Function ML17262A7911992-03-20020 March 1992 Proposed Tech Specs Revising 6.9.1.2 & 6.9.2.5 1999-06-28
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] |
Text
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY I
6.1.1 The Superintendent-Ginna Production shall be responsible II for overall on-site Ginna Station operation and shall delegate in writing the succession to this responsibility during his absence.
l
- 6. 1-1 Proposed 860ii 30381 860iOb
~OR>>'0 CW 05000V9~4i ~
P
,0 .0 F
1
'll
LNtSOS SUtNVlQON AttO ADMNIStAATIOtt CHAIRMANOF R. E. GINNA NUCLEAR POWER PLANT Uttt$ 0$ COMMIIMKAttatt THEBOARD MANAGEMENT ORGANIZATION CHART PRESIDENT SENIOR EXECUTIVEVICE PRESID VICE PRESIDENT GENERALSERVICES I I I I VICE PRESIDENT V.P. ELECTRIC VICE PRESIDENT I I VICE PRESIDENT PUBUCAFFAIRS, TRANSMISSION, ENGINEERING B I I- ELECTRIC B STEAM NSARB VICE PRESIDENT RATES PURCHASING DISTRIBUTION CONSTRUCTION I I PRODUCTION AND DISTRICTS 8 UTILIZATION I I I I SUPERINTENDENT CHIEF I NUCLEAR I PRODUCTION ENGINEER I MANAGER I SKURITY,CLAIMS, I INSURANCE DIV. SUPT. TRAINING I
MANAGER ELECT. TRANS., DIRKTOR OF ASSISTANT CHIEF ENGINEERING ENGINEER I tO MATERIALS DIST. B UTIL MANAGEMENT SERVICES I EMERGENCY I PLANNER DIRECTOR OF PORC CO SECURITY SUPERINTENDENT MANAGER PURCHASING SUPT. ELECTRIC MANAGERS QUALITY METER B LAB DESIGN B GENERAL AGENT MAINTENANCE ASSURANCE I CONSTRUCTION I
SUPERINTENDENT SUPERVISOR OF QUALITY SUPERINTENDENT NUCLEAR ELECTRICMETER DESIGN AND RKORDS.DOCUMENT GINNASUPPORT PURCHASING ASSURANCE GINNA PRODUCTION SECURITY 8 LAB STAFF CONSTRUCTION CONTROL, DRAFTING SERVICES I ENGINEERS AND STAFF AND TRAINING I I I FUEL MANAGEMENT L G INN A STAT ION I SECURITY I I GENERAL QUALITY I PLANT ORGANIZATION I I MAINTENANCE NUCLEAR CONTROL I OPERATIONS I I STAFF ASSURANCE I I I I I I I I I I I I I I QUALITY I I I I CONTROL 0 I I L L L ENGINEER I
L REV. 4 0 FIGURE 6.2-1 0
4 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION ORGANIZATION SUPERINTENDENT SUPERINTENDENT GINNA SUPPORT SERVICES GINNA PRODUCTION TECHNICAL IVIATERIALS HEALTH PHYSICS IVIAINTENANCE OPERATIONS AND CHEMISTRY MANAGER MANAGER MANAGER SUPERVISOR MANAGER Figure 6.2-2
j R. E. GINNA STATION ADMINISTRATIVEAND HEALTH PHYSICS & CHEMISTRY SECTION GROUP ORGANIZATIONS HEALTH PHYSICS AND CHEMISTRY MANAGER HEALTH RADIOCHEMIST CHEMIST PHYSICISTS CHEMISTRY RADIATION CHEMISTRY PROTECTION TECHNICIANS FOREMAN TECHNICIANS RADIATION PROTECTION.
TECHNICIANS 1 / SHIFT 0
0 Figure 6.2-3
R. E. GINNA STATION MAINTENANCE AND NUCLEAR ASSURANCE SECTION GROUP ORGANIZATIONS NUCLEAR MAINTENANCE ASSURANCE MANAGER MANAGER MAINTENANCE I &C QUALITY CONTROL .,FIRE PROTECTION & CENTRAL SG MAINTENANCE SUPERVISOR SUPERVISOR ENGINEER SAFETY COORDINATOR RECORDS MAINTENANCE I &CAND QUALITY CONTROL FOREMEN ELECTRIC INSPECTION FOREMEN FOREMEN SUPERVISOR FITTERS, TECHNICIANS, MECHANICS REPAIRMEN & TECHNICIANS HANDYMEN ELECTRICIANS Figure 6.2-4
V fj
R. E. GINNA STATION OPERATIONS AND TECHNICAL SECTION GROUP ORGANIZATIONS OPERATIONS TECHNICAL MANAGER (SRO) MANAGER OPERATIONS RESULTS REACTOR TECHNICAL OPERATIONAL GINNA AND TEST COMPUTER ASSESSMENT MODIFICATION SUPERVISOR (SRO) SUPERVISOR ENGINEER SYSTEM ANALYST ENGINEER SUPPORT SHIFT RESULTS COMPUTER SHIFT TECHNICAL SUPERVISOR AND TEST ADVISOR 1 / SHIFT (SRO) FORMAN TECHNICIANS 1/SHIFT*
HEAD CONTROL TECHNICIAN OPERATOR &
1 / SHIFT (RO) PERFORMANCE TESTER CONTROL 0
OPERATOR 0 1 / SHIFT (RO) 0 0 AUXILIARY CO
!Tl U OPERATORS A 2/ SHIFT *WHEN RCS AVERAGE TEMPERATURE )200'F Figure 6.2-5 ** A SECOND SRO WILL BE ON SHIFT AS REQUIRED BY 10 CFR 50.54 WHEN RCS AVERAGE TEMPERATURE )200'F
6.5 REVIEW AND AUDIT Three separate organizational units shall be established for the purpose of review and audit of plant operations and safety related matters. One of these will be an on site operations review group, the Plant Operations Review Committee (PORC). A second is the Quality Assurance (Q.A.) group, responsible for the audit of safety related activities associated with plant operations.
A third is the independent audit. and review group, the Nuclear Safety Audit and Review Board (NSARB). This group responsible for the periodic review of the activities of the Plant Operations Review Committee, for directing audits and evaluating their results, and for the management evaluation of the status and adequacy of the quality assurance program.
6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC) FUNCTION 6.5.1.1 The Plant Operations Review Committee shall function to advise the Superintendent Ginna Production related to nuclear safety and for referral of appropriate matters to the Nuclear Safety Audit and Review Board.
6.5-1 Proposed
1 1 d
ll 'l 1
J I " V
This reorganization will provide greater management attention to Nuclear Assurance and long term planning and direction for the station. Day-to-day operation of the station will be made more effective by creating a production group to concentrate on operations, maintenance, and health physics and chemistry. The Support Group will then be able to concentrate on non-day-to-day issues.
The removal of the communications path from the Quality Control Engineer to the Superintendent, Nuclear Production and Ginna Station Superintendent coincides with elevating the lead quality responsibility from the Quality Control Engineer to the Manager, Nuclear Assurance. This change is intended to enhance the Ginna quality program through reestablishing the direct reporting link to the responsible superintendent and through reassignment of a former experienced lead Quality Control Engineer as Manager, Nuclear Assurance.
The changes will not reduce management attention to the operation of Ginna, will not reduce the effectiveness of the Ginna Staff, is intended to improve the effectiveness of the Quality Assurance organization, and will not affect. the health and safety of the public.
The Purchasing Department will be renamed Materials Management to better reflect the activities of that department including purchasing through the Purchasing Agent. The existing communication between the Materials Management department and others within, the RGE organization will remain unchanged.
In promulgating its interim final rule to comply with Public Law 97-415, the Commission published as guidelines a series of examples of amendments that are not likely to involve significant hazards considerations. 48 Fed. Rg. 14864, 14870. The Commission's example (i) relates to purely admini'strative changes to the technical specifications. This change comes within example (i).
A no significant hazards finding is warranted.
The proposed change does not involve a significant'increase in the probability or consequences of an accident previously evalu'ated; or create the possibility of a new or different kind of accident from any accident previously evaluated; or involve a significant reduction in a margin of safety.
I k
~ ~
COMPOSITION 6.5.1.2 The PORC shall be composed of the; Chairman: Superintendent Ginna Production Vice Chairman/Member: Superintendent Ginna Support Services Vice Chairman/Member: Operations Manager Member: Maintenance Manager Member: Instrument 8 Control Supervisor Member: Technical Manager Member: Results and Test, Supervisor Member: Reactor Engineer Member: Health Physics and Chemistry Manager Member: Nuclear Assurance Manager Member: Quality Control Engineer ALTERNATES 6.5.1.3 Alternate members shall be designated by name, in writing by the Chairman.
MEETING FRE UENCY 6.5.1.4 The PORC shall meet
\
at least once per calendar month and as convened by the PORC Chairman.
QUORUM 6.5.1.5 A quorum of the PORC shall consist. of the Chairman or Vice Chairman and four members including alternates. No more than two shall be alternates.
6.5-2 Proposed
I
'K
AUTHORITY 6.5.2.9 a. The chairman of the Nuclear Safety Audit and Review Board is responsible to the President V
on all activities for which the review board is responsible.
- b. The NSARB shall report to and advise the Vice President, Electric and Steam Production, on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Records of NSARB activities shall be prepared, approved, and distributed as indicated below:
- a. Minutes shall be recorded of all meetings of this Board. Copies of the minutes shall be forwarded within 14 days following each meeting to the Corporate Chairman of the Board, Vice President,
,Electric and Steam Production" and such others as 1
the Chairman of the NSARB may designate.
- b. Reports of reviews encompassed by Section 6.5.2.7 e, f, g, and h above, shall be prepared, approved and forwarded to the Vice President-Electric and Steam Production within 14 days following completion of the review.
C. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President, Electric and Steam Production and to the management positions responsible for the areas audited within 30 days after completion of, the audit.
6.5-11 Proposed
t I
h II ~1 1
'I t
Attachment B The proposed Technical Specification change reflects changes in the RG6E management organization and changes in the Ginna organization. Following the sudden death of the Senior Vice President, Operations, RG&E Management, with the concurrence of the Board of Directors, has decided not to fill this position.
Under the new organization the vice presidents who had reported to the Senior Vice President, Operations, will now report directly to the President and Chief Operating Officer. The President of the Company has had an extensive involvement with the Ginna plant in various capacities since the time of construction.
le k
A realignment 'of. responsibilities in the Engineering organi-zation has resulted in a change in title whereby the Engineering Department now reports to the Vice President, Engineering and Construction, and a position of Chief Engineer has been reinstated.
The position of Assistant Chief Engineer, Engineering and Construction/
has been replaced by the position of Director of Engineering Services. ln order to maintain independence of the Quality Assurance organization from the design, construction and other engineering functions, the Executive Vice President will have overall responsibility and authority to direct Quality Assurance, however, the day-to-day direction will come from the Chief Engineer.
The Ginna organization changes consist of the following:
The position of Superintendent, Nuclear Production and Superintendent of Ginna Station has been changed to the position of Superintendent, Nuclear Production.
The position of Superintendent of Ginna Station has been divided into Superintendent-Ginna Production and Superintendent-Ginna Support Services. The Superintendent Ginna-Production is responsible for overall on-site Ginna Station operation.
The position of Assistant Superintendent has been eliminated.
Nuclear Assurance will report to the Superintendent, Nuclear Production.
Central Records will report to the Nuclear Assurance Manager.
The Health Physics and Chemistry Manager, the Maintenance Manager, and the Operation Manager will report to the Superintendent-Ginna Production.
The Technical Manager and the Materials Supervisor will report. to the Superintendent-Ginna Support Services.
Minor changes have also been made under the various managers which is reflected in the figures.
~