ML062650395: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach -Action Request > Corrective Actn Program (CAP) AR 4! C " Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line
{{#Wiki_filter:TeamTrack Reports                                                                                                                 Page 10 of 47 NMC > Sites > Point Beach - Action Request > Corrective Actn Program (CAP) AR                                           4!
                                                                                                                          *C     "
Section 1 Activity Request Id:   qCAP06464484 Activity Type:           CAP                                 Submit Date:                                       5/18/2005 10:59:43 AM I One Line


== Description:==
== Description:==
24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed
24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed


== Description:==
== Description:==
 
5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: A 24-hour FFD ENS report (EN # 41705) was submitted by PBNP on 05/17105.
A 24-hour FFD ENS report (EN # 41705) was submitted by PBNP on 05/17105. The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.)
The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.)
Initiator:               FLENTJE, FRITZIE C                 Initiator Department:                               SRL Licensing 1 Date/Time of Discovery: 5/18/2005 10:41:35 AM                 Datemme of Occurrence:                             5/18/2005 10:41:35 AM Identified By:           Site-identified                   System:                                             (None)
Initiator:
Equipment # (1st):       (None)                             Equipment Name (1st):                               (None)
FLENTJE, FRITZIE C Initiator Department:
Equipment # (2nd):       (None)                             Equipment Name (2nd):                               (None)
SRL Licensing 1 Date/Time of Discovery:
Equipment # (3rd):       (None)                             Equipment Name (3rd):                               (None)
5/18/2005 10:41:35 AM Datemme of Occurrence:
SitelUnit:               Point Beach - None Why did this occur?:     5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
5/18/2005 10:41:35 AM Identified By: Site-identified System: (None) Equipment  
Data provided appears to have been modified following receipt at NRC Operations Center.
# (1st): (None) Equipment Name (1st): (None) Equipment  
Immediate Action Taken: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
# (2nd): (None) Equipment Name (2nd): (None) Equipment  
Discussed with PBNP NRC Senior Resident Inspector. Item was also noted by NRC during daily phone call.
# (3rd): (None) Equipment Name (3rd): (None) SitelUnit:
NRC will follow up with Operations Center.
Point Beach -None Why did this occur?: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Data provided appears to have been modified following receipt at NRC Operations Center. Immediate Action Taken: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Discussed with PBNP NRC Senior Resident Inspector.
Recommendations:         5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
Item was also noted by NRC during daily phone call. NRC will follow up with Operations Center. Recommendations:
None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC.
5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC. 0 SRO Review Required?:
0 SRO Review Required?: N Section 2 Operability Status:     NA                               0 Compensatory Actions:                               N Basis for Operability:  5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
N Section 2 Operability Status: Basis for Operability:
Not an operability issue.
0 Unplanned TSAC Entry: NA 0 Compensatory Actions: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Not an operability issue.N 5/18/2005 12:30:26 PM -JESSESSKY, TOM: No system, structure or component important to nuclear safety is identified as being degraded.
5/18/2005 12:30:26 PM - JESSESSKY, TOM:
N @ External Notification:
No system, structure or component important to nuclear safety is identified as being degraded.
N C/In/lnnr}}
0 Unplanned TSAC Entry: N                                   @External Notification:                               N C/In/lnnr}}

Latest revision as of 13:52, 23 November 2019

Action Request - Corrective Action Program (CAP) (CAP064648)
ML062650395
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/18/2005
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
CAP064648, FOIA/PA-2006-0113
Download: ML062650395 (1)


Text

TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach - Action Request > Corrective Actn Program (CAP) AR 4!

  • C "

Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line

Description:

24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed

Description:

5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:

A 24-hour FFD ENS report (EN 41705) was submitted by PBNP on 05/17105. The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.)

Initiator: FLENTJE, FRITZIE C Initiator Department: SRL Licensing 1 Date/Time of Discovery: 5/18/2005 10:41:35 AM Datemme of Occurrence: 5/18/2005 10:41:35 AM Identified By: Site-identified System: (None)

Equipment # (1st): (None) Equipment Name (1st): (None)

Equipment # (2nd): (None) Equipment Name (2nd): (None)

Equipment # (3rd): (None) Equipment Name (3rd): (None)

SitelUnit: Point Beach - None Why did this occur?: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:

Data provided appears to have been modified following receipt at NRC Operations Center.

Immediate Action Taken: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:

Discussed with PBNP NRC Senior Resident Inspector. Item was also noted by NRC during daily phone call.

NRC will follow up with Operations Center.

Recommendations: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:

None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC.

0 SRO Review Required?: N Section 2 Operability Status: NA 0 Compensatory Actions: N Basis for Operability: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:

Not an operability issue.

5/18/2005 12:30:26 PM - JESSESSKY, TOM:

No system, structure or component important to nuclear safety is identified as being degraded.

0 Unplanned TSAC Entry: N @External Notification: N C/In/lnnr