{{#Wiki_filter:TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach -Action Request > Corrective Actn Program (CAP) AR 4! C " Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line | {{#Wiki_filter:TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach - Action Request > Corrective Actn Program (CAP) AR 4! | ||
*C " | |||
Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line | |||
== Description:== | == Description:== | ||
24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed | 24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed | ||
== Description:== | == Description:== | ||
5/18/2005 10:59:43 AM - FLENTJE, FRITZIE: | |||
5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: A 24-hour FFD ENS report (EN # 41705) was submitted by PBNP on 05/17105. | A 24-hour FFD ENS report (EN # 41705) was submitted by PBNP on 05/17105. The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.) | ||
The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.) | Initiator: FLENTJE, FRITZIE C Initiator Department: SRL Licensing 1 Date/Time of Discovery: 5/18/2005 10:41:35 AM Datemme of Occurrence: 5/18/2005 10:41:35 AM Identified By: Site-identified System: (None) | ||
Initiator: | Equipment # (1st): (None) Equipment Name (1st): (None) | ||
FLENTJE, FRITZIE C Initiator Department: | Equipment # (2nd): (None) Equipment Name (2nd): (None) | ||
SRL Licensing 1 Date/Time of Discovery: | Equipment # (3rd): (None) Equipment Name (3rd): (None) | ||
5/18/2005 10:41:35 AM Datemme of Occurrence: | SitelUnit: Point Beach - None Why did this occur?: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE: | ||
5/18/2005 10:41:35 AM Identified By: Site-identified System: (None) Equipment | Data provided appears to have been modified following receipt at NRC Operations Center. | ||
# (1st): (None) Equipment Name (1st): (None) Equipment | Immediate Action Taken: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE: | ||
# (2nd): (None) Equipment Name (2nd): (None) Equipment | Discussed with PBNP NRC Senior Resident Inspector. Item was also noted by NRC during daily phone call. | ||
# (3rd): (None) Equipment Name (3rd): (None) SitelUnit: | NRC will follow up with Operations Center. | ||
Point Beach -None Why did this occur?: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Data provided appears to have been modified following receipt at NRC Operations Center. Immediate Action Taken: 5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: Discussed with PBNP NRC Senior Resident Inspector. | Recommendations: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE: | ||
Item was also noted by NRC during daily phone call. NRC will follow up with Operations Center. Recommendations: | None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC. | ||
5/18/2005 10:59:43 AM -FLENTJE, FRITZIE: None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC. 0 SRO Review Required?: | 0 SRO Review Required?: N Section 2 Operability Status: NA 0 Compensatory Actions: N Basis for Operability: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE: | ||
N Section 2 Operability Status: | Not an operability issue. | ||
5/18/2005 12:30:26 PM - JESSESSKY, TOM: | |||
N @ External Notification: | No system, structure or component important to nuclear safety is identified as being degraded. | ||
N C/In/lnnr}} | 0 Unplanned TSAC Entry: N @External Notification: N C/In/lnnr}} |
Latest revision as of 13:52, 23 November 2019
ML062650395 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/18/2005 |
From: | - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
CAP064648, FOIA/PA-2006-0113 | |
Download: ML062650395 (1) | |
Text
TeamTrack Reports Page 10 of 47 NMC > Sites > Point Beach - Action Request > Corrective Actn Program (CAP) AR 4!
- C "
Section 1 Activity Request Id: qCAP06464484 Activity Type: CAP Submit Date: 5/18/2005 10:59:43 AM I One Line
Description:
24-Hour FFD ENS Report Issued by NRC Operations Center Contained Error Detailed
Description:
5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
A 24-hour FFD ENS report (EN 41705) was submitted by PBNP on 05/17105. The report was submitted on the Unit I docket, as is the practice for reporting of events that are non-physical plant and not unit-specific, such as security events. The NRC daily report of the event indicated that Unit 2 was at full power. Unit 2 is shut down for its refueling outage. (Copies of the as -submitted ENS worksheet and daily event report are attached.)
Initiator: FLENTJE, FRITZIE C Initiator Department: SRL Licensing 1 Date/Time of Discovery: 5/18/2005 10:41:35 AM Datemme of Occurrence: 5/18/2005 10:41:35 AM Identified By: Site-identified System: (None)
Equipment # (1st): (None) Equipment Name (1st): (None)
Equipment # (2nd): (None) Equipment Name (2nd): (None)
Equipment # (3rd): (None) Equipment Name (3rd): (None)
SitelUnit: Point Beach - None Why did this occur?: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
Data provided appears to have been modified following receipt at NRC Operations Center.
Immediate Action Taken: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
Discussed with PBNP NRC Senior Resident Inspector. Item was also noted by NRC during daily phone call.
NRC will follow up with Operations Center.
Recommendations: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
None. Per NRC Senior Resident Inspector, no further action is required on the part of NMC.
0 SRO Review Required?: N Section 2 Operability Status: NA 0 Compensatory Actions: N Basis for Operability: 5/18/2005 10:59:43 AM - FLENTJE, FRITZIE:
Not an operability issue.
5/18/2005 12:30:26 PM - JESSESSKY, TOM:
No system, structure or component important to nuclear safety is identified as being degraded.
0 Unplanned TSAC Entry: N @External Notification: N C/In/lnnr