Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 13, 2010 Mr. Ashok S. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 13, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB~IECT: WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853) |
| Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 WATTS BAR NUCLEAR PLANT, UNIT 2 - | |
| REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853) | |
|
| |
|
| ==Dear Mr. Bhatnagar:== | | ==Dear Mr. Bhatnagar:== |
| By letter dated May 13, 2010 (ADAMS Accession No. | | |
| ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] | | By letter dated May 13, 2010 (ADAMS Accession No. ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] Regulatory Staff in Connection with its Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present. |
| Regulatory Staff in Connection with its Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present. | | The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter. |
| The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter. We request your response within 30 days of receipt of this letter. If you should have any questions, please contact me at 301-415-2048. Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. | | We request your response within 30 days of receipt of this letter. |
| Request for Additional cc w/encl: Distribution via REQUEST FOR ADDITIONAL WATTS BAR NUCLEAR PLANT, UNIT ANTITRUST TENNESSEE VALLEY DOCKET NO. As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Nuclear Regulatory Commission (NRC) conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilities. The Commission must, under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. On August 8, 2005, Congress excused the NRC from conducting such reviews for applications for construction permits and operating licenses filed after that date. 42 U.S.C.A. | | If you should have any questions, please contact me at 301-415-2048. |
| § 2135(c)(9). | | Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 |
| Because Tennessee Valley Authority (TVA) filed the pending application for Watts Bar Nuclear Plant, Unit 2 (WBN 2) before August 8, 2005, the NRC must conduct an antitrust review for that application. | | |
| An antitrust review at the operating license stage is not required unless the Commission determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage and those changes have "negative antitrust implications." South Carolina Electric and Gas Company and South Carolina Public Service Authority (Virgil C. | | ==Enclosure:== |
| Summer Nuclear Station, Unit 1), CLI-80-28, 11 NRC 817,835 (1980). The NRC staff requests your response to the following request for additional information to reconcile any possible questions arising from your May 13, 2010, submittal, to the NRC. The table showing projected capacity position at summer peak years 2010-2017 assumes that WBN 2 is online by summer 2013. Please present the data without including capacity assumed from WBN 2. TVA states that it is not a member of "any formal power pool or coordinating group in the context used herein." Please clarify membership in any informal pool or group and TVA's interpretation of "the context used herein." TVA states there have been no new interconnections or connections to wholesale customers on the 500-kilovolt (kV) system in the WBN area. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989. | | |
| -2TVA states that there have been no new wholesale customers since the 1989 submittal. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989. TVA describes a 933-megawatt combined gas cycle turbine facility, but does not provide the ownership rights or power output allocations for that facility. | | Request for Additional Information cc w/encl: Distribution via Listserv |
| Therefore, please provide ownership rights or power output allocations for that facility. TVA refers to a Board Policy describing how the provisions of Section 15d(a) of the TVA Act are to be applied regarding the availability of TVA power. Please provide documentation that the Board adopted the policy and the provisions of the policy adopted. | | |
| July 13, 2010 Mr. Ashok S. | | REQUEST FOR ADDITIONAL INFROMATION WATTS BAR NUCLEAR PLANT, UNIT 2 ANTITRUST REVIEW TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Nuclear Regulatory Commission (NRC) conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilities. The Commission must, under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. On August 8, 2005, Congress excused the NRC from conducting such reviews for applications for construction permits and operating licenses filed after that date. 42 U.S.C.A. § 2135(c)(9). |
| Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 WATTS BAR NUCLEAR PLANT, UNIT 2 - | | Because Tennessee Valley Authority (TVA) filed the pending application for Watts Bar Nuclear Plant, Unit 2 (WBN 2) before August 8, 2005, the NRC must conduct an antitrust review for that application. An antitrust review at the operating license stage is not required unless the Commission determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage and those changes have "negative antitrust implications." South Carolina Electric and Gas Company and South Carolina Public Service Authority (Virgil C. Summer Nuclear Station, Unit 1), CLI-80-28, 11 NRC 817,835 (1980). |
| REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853) | | The NRC staff requests your response to the following request for additional information to reconcile any possible questions arising from your May 13, 2010, submittal, to the NRC. |
| | The table showing projected capacity position at summer peak years 2010- 2017 assumes that WBN 2 is online by summer 2013. Please present the data without including capacity assumed from WBN 2. |
| | TVA states that it is not a member of "any formal power pool or coordinating group in the context used herein." Please clarify membership in any informal pool or group and TVA's interpretation of "the context used herein." |
| | TVA states there have been no new interconnections or connections to wholesale customers on the 500-kilovolt (kV) system in the WBN area. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989. |
| | |
| | -2 TVA states that there have been no new wholesale customers since the 1989 submittal. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989. |
| | TVA describes a 933-megawatt combined gas cycle turbine facility, but does not provide the ownership rights or power output allocations for that facility. Therefore, please provide ownership rights or power output allocations for that facility. |
| | TVA refers to a Board Policy describing how the provisions of Section 15d(a) of the TVA Act are to be applied regarding the availability of TVA power. Please provide documentation that the Board adopted the policy and the provisions of the policy adopted. |
| | |
| | July 13, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 |
| | |
| | ==SUBJECT:== |
| | WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853) |
|
| |
|
| ==Dear Mr. Bhatnagar:== | | ==Dear Mr. Bhatnagar:== |
| By letter dated May 13, 2010 (ADAMS Accession No. ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] | | |
| Regulatory Staff in Connection with its . Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present. | | By letter dated May 13, 2010 (ADAMS Accession No. ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] Regulatory Staff in Connection with its . |
| The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter. We request your response within 30 days of receipt of this letter. If you should have any questions, please contact me at 301-415-2048. | | Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present. |
| Sincerely, IRA! Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. Request for Additional cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDprPfpb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr ADAMS Accession No. | | The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter. |
| ML101890406 *per memo dated Julv 1, 2010 OFFICE LPWB/PM LPWB/LA N RRlFPAB/(A)BC OGC LPWB/BC NAME JPoole BClavton MDusaniwskyj* | | We request your response within 30 days of receipt of this letter. |
| MSmith* SCampbell DATE 7/09/10 7/09/10 7/1/10 7/1/10 7/13/10 OFFICIAL AGENCY}} | | If you should have any questions, please contact me at 301-415-2048. |
| | Sincerely, IRA! |
| | Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDprPfpb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr ADAMS Accession No. ML101890406 *per memo dated Julv 1, 2010 OFFICE LPWB/PM LPWB/LA NRRlFPAB/(A)BC OGC LPWB/BC NAME JPoole BClavton MDusaniwskyj* MSmith* SCampbell DATE 7/09/10 7/09/10 7/1/10 7/1/10 7/13/10 OFFICIAL AGENCY RECORD}} |
Letter Sequence RAI |
---|
|
Results
Other: CNL-15-189, Decommissioning Funding Update, ML090770757, ML091250151, ML092470504, ML101740152, ML101740157, ML101820478, ML102110075, ML102360283, ML102600474, ML103160419, ML110260321, ML111010165, ML111250430, ML111890037, ML11291A095, ML12069A330, ML12073A391, ML12073A392, ML12073A393, ML12081A073, ML13044A113
|
MONTHYEARML0815601832008-05-29029 May 2008 Cable Issues Corrective Action Program for the Completion of WBN Unit 2 Project stage: Request ML0830900462008-10-30030 October 2008 Preservice Inspection Program Plan and Request for Relief No. WBN-2/PDI-4 Project stage: Request ML0905707412009-02-28028 February 2009 NUREG-0847, Supp. 21, Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Project stage: Request ML0907003782009-03-0404 March 2009 Operating License Application Update Project stage: Request ML0907707572009-04-22022 April 2009 Notice of Receipt of Update to Application for Facility Operating License and Notice of Additional Opportunity for Hearing and Order Project stage: Other ML0907708072009-04-27027 April 2009 Federal Register Notice- Watts Bar Nuclear Plant, Unit 2 - Notice If Receipt of Update to Application for Facility Operating License and Notice of Additional Opportunity for Hearing Project stage: Request ML0912501512009-05-0808 May 2009 Public Notice of Receipt of Updated Application for Facility Operating License Project stage: Other ML0918900382009-07-21021 July 2009 Request for Additional Information Regarding Financial Information Related to Operating License Application Update Project stage: RAI ML0924705042009-08-26026 August 2009 Additional Information Regarding Financial Information Related to Operating License Application Update Project stage: Other ML0935209672009-12-15015 December 2009 TVA Meeting Presentation Project stage: Request ML0935600192009-12-22022 December 2009 Summary of Meeting with Tennessee Valley Authority (TVA) Regarding Digital Instrumentation and Controls Review Project stage: Meeting ML1002703512010-02-18018 February 2010 Request for Additional Information Regarding Physical Security Plan Project stage: RAI ML1006300192010-03-11011 March 2010 Request for Additional Information Regarding Radiological Emergency Response Plan Project stage: RAI ML1009700722010-04-0505 April 2010 Response to NRC Request for Additional Information Regarding Physical Security Plan Project stage: Response to RAI ML1012302482010-04-27027 April 2010 Staff Information Requests Resulting from NRC December 15, 2009, Meeting with TVA Regarding Digital Instrumentation and Controls Review and NRC Clarifications to the Requests Provided During February 18, 2010. Project stage: Meeting ML1013406982010-05-28028 May 2010 Supplement to Request for Additional Information Regarding Radiological Emergency Response Plan (Tac No. ME0853) Project stage: RAI ML1015504882010-06-11011 June 2010 Request for Additional Information Regarding Fire Protection Program Project stage: RAI ML1015404772010-06-15015 June 2010 Review of Radiological Emergency Response Plan Project stage: Approval ML1017401572010-06-24024 June 2010 Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment Project stage: Other ML1017401522010-06-24024 June 2010 Letter, Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment Project stage: Other ML1018204782010-07-0101 July 2010 Revised Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment Project stage: Other ML1018904062010-07-13013 July 2010 Request for Additional Information Regarding Antitrust Review Project stage: RAI ML1019703112010-07-16016 July 2010 Request for Additional Information Regarding Fire Protection Program Project stage: Request ML1021100752010-07-29029 July 2010 Jcn No: 4201, (TAC No. ME0853) Q4011 Task Order Number 9, Tennessee Valley Authority, Watts Bar Unit 2. Evacuation Time Estimate (ETE) Review Project stage: Other ML1021600852010-07-29029 July 2010 Response to Request for Additional Information Regarding Antitrust Review Project stage: Response to RAI ML1023602832010-08-20020 August 2010 Fire Protection Program, Commitment to Provide Additional Information on Multiple Spurious Operation Scenarios Project stage: Other ML12081A0732010-08-20020 August 2010 Enclosure 1 (W/Apps a, B, & C): Watts Bar, Unit 2, Fire Protection Program, Commitment to Provide Additional Information on Multiple Spurious Operation Scenarios Project stage: Other ML1026004742010-09-17017 September 2010 Response to NRC Question Regarding Emergency Plan Project stage: Other ML1031604192010-11-0505 November 2010 Watts, Unit 2, Fire Protection Program (TAC ME0853) - Commitment to Provide Multiple Spurious Operation (MSO) Evaluation Project stage: Other ML1102603212011-03-22022 March 2011 Notice of No Significant Antitrust Changes and Time for Filing Requests for Reevaluation Project stage: Other ML1109604072011-04-0101 April 2011 Response to Request for Additional Information on Final Safety Analysis Report Section 9.3.2.6 for the Post Accident Sampling System (PASS) Project stage: Response to RAI ML1110101652011-04-13013 April 2011 Status of Operating License Application Review and Project Schedule Implications Project stage: Other ML11146A0442011-05-20020 May 2011 Response to Final Safety Analysis Report, Chapter 11 and Final Supplemental Environmental Impact Statement Request for Additional Information Project stage: Supplement ML1118900372011-07-20020 July 2011 Schedule of Licensing Activities Project stage: Other ML1112504302011-08-12012 August 2011 Transition of Components to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Project stage: Other ML11291A0952011-10-13013 October 2011 Instrumentation and Controls Staff Information Requests Project stage: Other ML1131302182011-11-18018 November 2011 Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Items 80, 81, 105, and 108 Project stage: Approval ML12069A3302012-01-19019 January 2012 Instrumentation and Controls Staff Information Requests Project stage: Other ML12073A3922012-02-29029 February 2012 WNA-VR-00283-WBT-NP, Rev. 7, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects Iv&V Summary Report for the Post Accident Monitoring System. Attachment 2 Project stage: Other ML12073A3932012-03-0808 March 2012 TVA White Paper Common Q Pams Design Basis Conformance to the Requirements of IEEE 603-1991, Dated March 8, 2012 (Letter Items 1 and 3, Sser 23 Appendix Hh Item Numbers 94 and 105). Attachment 4 Project stage: Other ML12073A3912012-03-0909 March 2012 Instrumentation and Controls Staff Information Requests Project stage: Other ML12160A3512012-06-0707 June 2012 Submittal of Additional Information Requested to NUREG-0847 Supplemental Safety Evaluation Report Related to Appendix Hh Open Item 26 - Diesel Generator Project stage: Supplement ML13044A1132013-02-0707 February 2013 Fire Protection Program (TAC No. ME0853) - Commitment to Provide Additional Information on Multiple Spurious Operation (MSO) Scenarios Project stage: Other CNL-15-017, Decommissioning Funding Status Report2015-03-31031 March 2015 Decommissioning Funding Status Report Project stage: Request CNL-15-189, Decommissioning Funding Update2015-09-10010 September 2015 Decommissioning Funding Update Project stage: Other 2010-07-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) ML18240A0702018-08-27027 August 2018 NRR E-mail Capture - RAI for Watts Bar Unit 2 Tpbars LAR and Watts Bar Units 1 and 2 LAR Related to Fuel Storage ML18199A1822018-07-17017 July 2018 NRR E-mail Capture - Request for Additional Information Regarding Watts Bar Unit 1 Extension of Surveillance Requirement Intervals ML18123A3942018-05-0303 May 2018 NRR E-mail Capture - Request for Additional Information Unit 2 Cycle 1 Steam Generator Tube Inspection Report ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML18031A6592018-02-0606 February 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise Technical Specification 4.2.1 and Technical Specifications Related to Fuel Storage ML18016A0112018-01-12012 January 2018 Draft Request for Additional Information Exigent Amendment Request for Inoperable Reactor Coolant Temperature Indication ML17226A0032017-08-11011 August 2017 NRR E-mail Capture - Watts Bar, Unit 1 - Final Request for Additional Information Concerning Request to Amend Turbine Trip Low Fluid Oil Pressure Reactor Protection System Trip Setpoint 2023-06-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 13, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB~IECT: WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853)
Dear Mr. Bhatnagar:
By letter dated May 13, 2010 (ADAMS Accession No. ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] Regulatory Staff in Connection with its Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present.
The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter.
We request your response within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-2048.
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFROMATION WATTS BAR NUCLEAR PLANT, UNIT 2 ANTITRUST REVIEW TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 As required by the December 19, 1970, amendments to the Atomic Energy Act of 1954, the Nuclear Regulatory Commission (NRC) conducts antitrust reviews with respect to construction permits and operating licenses it issues for commercial nuclear facilities. The Commission must, under certain circumstances, make a finding as to whether the activities under the permit or license would create or maintain a situation inconsistent with the antitrust laws. On August 8, 2005, Congress excused the NRC from conducting such reviews for applications for construction permits and operating licenses filed after that date. 42 U.S.C.A. § 2135(c)(9).
Because Tennessee Valley Authority (TVA) filed the pending application for Watts Bar Nuclear Plant, Unit 2 (WBN 2) before August 8, 2005, the NRC must conduct an antitrust review for that application. An antitrust review at the operating license stage is not required unless the Commission determines such review is advisable on the ground that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous antitrust review conducted by the Attorney General and the Commission at the construction permit stage and those changes have "negative antitrust implications." South Carolina Electric and Gas Company and South Carolina Public Service Authority (Virgil C. Summer Nuclear Station, Unit 1), CLI-80-28, 11 NRC 817,835 (1980).
The NRC staff requests your response to the following request for additional information to reconcile any possible questions arising from your May 13, 2010, submittal, to the NRC.
The table showing projected capacity position at summer peak years 2010- 2017 assumes that WBN 2 is online by summer 2013. Please present the data without including capacity assumed from WBN 2.
TVA states that it is not a member of "any formal power pool or coordinating group in the context used herein." Please clarify membership in any informal pool or group and TVA's interpretation of "the context used herein."
TVA states there have been no new interconnections or connections to wholesale customers on the 500-kilovolt (kV) system in the WBN area. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989.
-2 TVA states that there have been no new wholesale customers since the 1989 submittal. Please reconcile that statement with disclosure of two 500-kV wholesale customers added since December 5, 1989.
TVA describes a 933-megawatt combined gas cycle turbine facility, but does not provide the ownership rights or power output allocations for that facility. Therefore, please provide ownership rights or power output allocations for that facility.
TVA refers to a Board Policy describing how the provisions of Section 15d(a) of the TVA Act are to be applied regarding the availability of TVA power. Please provide documentation that the Board adopted the policy and the provisions of the policy adopted.
July 13, 2010 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTITRUST REVIEW (TAC NO. ME0853)
Dear Mr. Bhatnagar:
By letter dated May 13, 2010 (ADAMS Accession No. ML093370605), Tennessee Valley Authority submitted updated antitrust information pursuant to Regulatory Guide 9.3, "Information Needed by the AEC [Atomic Energy Commission] Regulatory Staff in Connection with its .
Antitrust Review of Operating License Applications for Nuclear Power Plants," with respect to Watts Bar Nuclear Plant Unit 2. This information addressed changes in antitrust information from December 1989 to the present.
The Nuclear Regulatory Commission staff reviewed the information provided and determined that further information is required to complete its assessment of the applicant's submittals. The specific information requested is addressed in the enclosure to this letter.
We request your response within 30 days of receipt of this letter.
If you should have any questions, please contact me at 301-415-2048.
Sincerely, IRA!
Justin C. Poole, Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource RidsNrrDprPfpb Resource LPWB Reading File RidsNrrLABClayton Resource RidsNrrPMWattsBar2 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr ADAMS Accession No. ML101890406 *per memo dated Julv 1, 2010 OFFICE LPWB/PM LPWB/LA NRRlFPAB/(A)BC OGC LPWB/BC NAME JPoole BClavton MDusaniwskyj* MSmith* SCampbell DATE 7/09/10 7/09/10 7/1/10 7/1/10 7/13/10 OFFICIAL AGENCY RECORD