Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes optionsShow last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 21:15, 13 February 2026
 
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

11 February 2026

     06:37  ML24324A350 diffhist +2 StriderTol talk contribs (StriderTol Bot change)
     06:27  CNL-24-080, Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) diffhist −6,123 StriderTol talk contribs (StriderTol Bot change)
     06:27  ML24325A471 diffhist −79 StriderTol talk contribs (StriderTol Bot change)
     06:12  ML24327A007 diffhist +3 StriderTol talk contribs (StriderTol Bot change)
     05:37  CNL-24-075, Response to Request for Additional Information for Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah and Watts Bar (SQN-TSTS-23-02 and W diffhist −30 StriderTol talk contribs (StriderTol Bot change)
     05:16  ML24345A226 diffhist −104 StriderTol talk contribs (StriderTol Bot change)
     05:16  ML24346A041 diffhist −102 StriderTol talk contribs (StriderTol Bot change)
     05:16  ML24346A398 diffhist −64 StriderTol talk contribs (StriderTol Bot change)
     05:16  CNL-24-072, Request for Alternative to Extend First Containment Inservice Inspection Interval diffhist −16,186 StriderTol talk contribs (StriderTol Bot change)
     05:14  CNL-24-009, Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations diffhist −1 StriderTol talk contribs (StriderTol Bot change)
     05:14  CNL-24-082, Central Emergency Control Center Emergency Plan Implementing Procedure Revision diffhist −7,873 StriderTol talk contribs (StriderTol Bot change)
     05:12  CNL-25-001, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b diffhist −526 StriderTol talk contribs (StriderTol Bot change)
     05:08  ML25014A406 diffhist −12 StriderTol talk contribs (StriderTol Bot change)