{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of/ 5 1 Jvp Status: YO NEI UFI Seismic Walkdown Checklist (SWC)Equipment ID No. Q1R17BO02 Equip. Class' I Equipment Description MCC 10 Location:
{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of/ 5 1Jvp Status: YO NEI UFI Seismic Walkdown Checklist (SWC)
Bldg. AUXILIARY Floor El. 121 Room, Area 72 O Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. Q1R17BO02                       Equip. Class' I Equipment Description MCC 10 Location: Bldg. AUXILIARY Floor El. 121                       Room, Area   72O Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y[2/N]of the 50% of SWEL items requiring such verification)?
Anchorage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y[2/N]
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of the 50% of SWEL items requiring such verification)?
~~~&E ~ r fA.T, A e 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YECN/NO U-    N/AO
YECN/NO U- N/AO Y[2'/N0 UO N/AO Y4 ND U] N/AO YI[ NO U[ N/AQ Y[d NO U'-Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface             Y[2'/N0 UO N/AO oxidation?
Page 351 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F -F7 Sheet 2 of 2I¢' -10 Status: Yo N[O U[-Seismic Walkdown Checklist (SWC)EquipmentiDNo.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Y4 ND U] N/AO
QIREf7fe2 Equip. i Equipment Description MCC 18 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 5. Is the anchorage configuration consistent with plant documentation?           YI[  NO U[    N/AQ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
8, Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
                ~~~&E ~ r fA.T,                 A e
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yd ND UD N/AD Y[2fANO U- N/AO Yr/ND UD N/AD Y4ND UO Other Adverse Conditions
: 6. Based on the above anchorage evaluations, is the anchorage free of             Y[d NO U'-
: 11. Have you looked for and found no other seismic conditions that could Y[ND UD adversely affect the safety functions of the equipment?
potentially adverse seismic conditions?
0 mnL~dtoa ae may be added as necessary) r L/ I 4v Q~*Jt~ ML~,(T~.Yu'AO Date: 7/to ,~Evaluated by:.Date: 1/1,P11 v iv)I (K~)11/t01tV z Page 352 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 3 of:;3 , tkolt 90 Status: Yj'NL-] UF'I]Seismic Walkdown Checklist (SWC)Equipment ID No. QIR178002 Equip.Equipment Description MCC 1B Photographs I 97 To ppVE=P E-W JAOVe MjMtA t~E:10 TfH.E M~cC LQC-ATACI)0k AFth MrC C~)~ ~T C~Note:~ ~/ jn, T* dP WF~C 00J THE2ýT~ W~4--TI I iEAOT A~J AT Mep- 1 Note: Note: Note: Page 353 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 354 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 355 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 356 of 562 NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 357 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 1\-,J r-'% esm Page 358 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 359 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-'3-J Page 360 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS"T--I -V.n NO. SNCF164-RPT-01, VERSION 2.0 Page 361 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0-3-'t- N -. , Page 362 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 363 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 TI..,-x ýZ-'Page 364 of 562 nki 11 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. lalNG io4-mr I-U0, vr'ru..' 'Page 365 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 ,%X she of Status: Y9 NEI U[0 Seismic Walkdown Checklist (SWC)Equipment ID No. OIR178507-A Equip. ClassýEquipment Description MCC IN Location:
Enter the equipment class name from Appendix B: Classes of Equipment.
Bldg. DIESEl Floor El. 155 Room, Area Manufacturer, Model, Etc. (optional but recommended)
Page 351 of 562
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Auchorase 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?NUI" 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                          NO. SNCF164-RPT-01, VERSION 2.0 F -F7 Sheet 2 of 2I¢' -10 Status: Yo N[O U[-
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Seismic Walkdown Checklist (SWC)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
EquipmentiDNo.         QIREf7fe2             Equip. i Equipment Description MCC 18 Interaction Effects
Y9'Nr1 UlI N/AD YjN3UQ N/ADJ YE'ND U-] N/AID YO ND UD N/Alf Y& NO Ul Enter the equipment class name from Appendix B: Classes of Equipment Page 366 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 rC ~Status: uE%ýINJ U Seismic Walkdown Checklist (SWC)Equipment ID No. 0IR17B507-A Equip. Class, Equipment Description MCC 1N Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 7. Are soft targets free from impact by nearby equipment or structures?       Yd ND UD N/AD 8, Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[2fANO U-        N/AO and masonry block walls not likely to collapse onto the equipment?
Yd"NQ U N/AC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, UI] N/AC]and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?             Yr/ND UD N/AD
: 9. Do attached lines have adequate flexibility to avoid damage?Y[2/NE3 UC] N/AC]10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free     Y4ND UO of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could UC adversely affect the safety functions of the equipment?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[ND UD adversely affect the safety functions of the equipment?
0   mnL~dtoa             ae may be added as necessary) r                                       L/                       4v        I Q~*Jt~ ML~,(T Evaluated by:.    ~.Yu'AO                                                         Date:   7/to 1/1,P11,~v iv)I (K~)                                                             11/t01tV z
Page 352 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                         NO. SNCF164-RPT-01, VERSION 2.0 Sheet 3 of:;3 ,tkolt 90 Status: Yj'NL-] UF'I]
Seismic Walkdown Checklist (SWC)
Equipment ID No. QIR178002         Equip.
Equipment Description MCC 1B Photographs I                                             T*    dP  WF~C  00J THE2ýT~            W~4--
To ppVE=P         E-W   JAOVe MjMtA 97 t~E:10   TfH.E M~cC LQC-ATACI)0k TI  I iEAOT A~J      AT      Mep- 1 AFthMrC    C~)~     ~T       C~
Note:                                          Note:
            ~jn, ~/
Note:                                          Note:
Page 353 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 354 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 355 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 356 of 562
 
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 357 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                     NO. SNCF164-RPT-01, VERSION 2.0 1\
                                                                                            -,J r
                                                          - '%esm Page 358 of 562
 
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 359 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0
                                                                                        -'3
                                                                                        -J Page 360 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS             NO. SNCF164-RPT-01, VERSION 2.0 "T--I -V.n Page 361 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0
                                                                                        -3
                                                          -'t- N-. ,
Page 362 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 363 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 TI
                                                                                        ..,
                                                                  - x ýZ-'
Page 364 of 562
 
nki 11 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                     NO. lalNG io4-mr I-U0, vr'ru
                                              ..         ' '
Page 365 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0
                                                                                                              ,%X she of Status: Y9 NEI U[0 Seismic Walkdown Checklist (SWC)
Equipment ID No. OIR178507-A                       Equip. Classý Equipment Description MCC IN Location: Bldg. DIESEl             Floor El. 155           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Auchorase
: 1. Is the anchorage configuration verification required (i.e., is the item one   EI* NUI" of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y9'Nr1 UlI N/AD
: 3. Is the anchorage free of corrosion that is more than mild surface                   YjN3UQ N/ADJ oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     YE'ND U-] N/AID
: 5. Is the anchorage configuration consistent with plant documentation?           YO ND UD N/Alf (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of             Y& NO Ul potentially adverse seismic conditions?
Enter the equipment class name from Appendix B: Classes of Equipment Page 366 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 rC ~
Status:         uE%ýINJ U
Seismic Walkdown Checklist (SWC)
Equipment ID No.       0IR17B507-A             Equip. Class, Equipment Description MCC 1N Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     Yd"NQ U       N/AC
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI*C]N    UI] N/AC]
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?             Y[2/NE3 UC] N/AC]
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y*rNC      UC adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Plwc-~-, -z-t [I Evaluated'
Plwc-Evaluated'                                                                              ~-, -z-t [I
-1161- Iq a" M frw"014v.Page 367 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0.4 Page 368 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r-I I i .-- , I I Page 369 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Sheet 1 ofsfx'Staturs Y~dNI U1'N]u Equipment ID No. QIR18B029 Equip. Class'-2 Equipment Description POWER DISCONNECT SWITCH Location:
                                            -1161-         Iq a"     M frw"014v.
Bldg. AUIY U1ARY Floor E. ,/j4.. Room, Area Manufacturer, Model, Etc. (optional but recommended)
Page 367 of 562
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Auchorae 1. Is the anchorage configuration verification required (i.e., is the item one YO N§1"1 of the 50% of SWEL items requiring such verification)?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
                                                                                        .4 Page 368 of 562
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                         NO. SNCF164-RPT-01, VERSION 2.0 r-I I --
YNF'<0 U1) N/AD Ye"NO Ul- N/AQ Y&NO UID N/Ar YO NO U- N/AID " Yrb/NO 1)0 IEnter the equipment clan name from Appendix B: Classes of Equipment.
i     . ,   I I Page 369 of 562
Page 370 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Seismic Walkdown Checklist (SWC)Equipment ID No. QIR18B029 Equip. Class, 2 Equipment Description POWER DISCONNECT SWITCH CAL Sheeat of Status: YE N[-] U[']Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
 
YIV<DOUEJ N/ACJ 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[tNF[] U--1 N/AD and masonry block walls not likely to collapse onto the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 ofsfx' Staturs Y~dNI     U1'N]u Seismic Walkdown Checklist (SWC)
: 9. Do attached lines have adequate flexibility to avoid damage? Yb/ND U0- N/AQ 1;C'e t-T& r*i V-V POT~ or'4Q -JjC A I r a-XC Z t10.-'Baed on the above seismic interaction evaluations, is equipment free UD C of potentially adverse seismic interaction effects?Other Adverse Conditions
Equipment ID No. QIR18B029                       Equip. Class'-2 Equipment Description POWER DISCONNECTSWITCH Location: Bldg. AUIYU1ARY Floor E. ,*/j4..                   Room, Area Manufacturer, Model, Etc. (optional but recommended)
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
YE4<cD UM Comments (Additional pages may be added as necessary)
Auchorae
AJVDVf Evaluated by: .... k " * " ( Y~yk~( x~1a <Z/Date: X -zo'Z-Page 371 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 372 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 373 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Seismic Walkcdown Checklist (SWC)Equipment ID No. Q1R168031 Equip. Class, NO. SNCF164-RPT-01, VERSION 2.0 Sheet of Status: UEJ o .Equipment Description CIRCUIT BREAKER BOX Location:
: 1. Is the anchorage configuration verification required (i.e., is the item one YO N&sect;1"1 of the 50% of SWEL items requiring such verification)?
Bldg. AUXILIARY Floor El. 139 Room, Area 332 Manufacturer, Model, Etc. (optional but recommended)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YNF'<0 U1) N/AD
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 3. Is the anchorage free of corrosion that is more than mild surface             Ye"NO Ul-    N/AQ oxidation?
Additional space is provided at the end of this checklist for documenting other comments.Anehoraee 1. Is the anchorage configuration verification required (i.e., is the item one Y[C NE&#xfd; 'of the 50% of SWEL items requiring such verification)?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     Y&NO UID N/Ar
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant documentation?           YO NO U-      N/AID "
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?U['U N/AD*/N- U" N/AO Y&<CJ UEJ N/AQ YO1 Nil UC NI5", Y1140$F UQ]I Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of           Yrb/NO 1)0 potentially adverse seismic conditions?
Page 374 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 She~t 2 ofV" 1 Status: Yt NEI UL]Seismic Walkdown Checklist (SWC)Equipment ID No. OIR18B031 Equip. Class 2 Equipment Description CIRCUIT BREAKER BOX Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
IEnter the equipment clan name from Appendix B: Classes of Equipment.
Y3, 4 1( UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[frlND UD N/AD and masonry block walls not likely to collapse onto the equipment?
Page 370 of 562
: 9. Do attached lines have adequate flexibility to avoid damage? Y .-'ND- UD N/AD COt,roo T A 00 5-5 / v,&#xfd; ,.-.fs,-w, ,.,,,Jj' t- k.,,W .t.. IT-s ,,'C.-40,, W_ -T- O's- hct ....5N1C tktkVC 1& -i5j --&#xfd;CL,-0. Based on the above seismic interaction evaluations, is equipment free UD of potentially adverse seismic interaction effects?Other Adverse Conditions
 
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 CAL Sheeat of Status: YE  N[-] U[']
Y&&#xfd;N[]UD]Comments (Additional pages may be added as necessary)
Seismic Walkdown Checklist (SWC)
/V 6 A.>;Evaluated by: G1 -1 04 1 DX-&#xfd;fUA&#xfd;&#xfd; Date: V.z /.r. u4&#xb6;i4 A_________
Equipment ID No. QIR18B029                     Equip. Class, 2 Equipment Description POWER DISCONNECT SWITCH Interaction Effects
Page 375 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 376 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 377 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F~I- r14 Sheet I of 3 Status: YE&#xfd; N[] Ur"I Seismic Walkdown Checklist (SWC)Equipment ID No. QIR18B035 Equip. Class' 14 Equipment Description CIRCUIT BREAKER BOX Location:
: 7. Are soft targets free from impact by nearby equipment or structures?     YIV<DOUEJ N/ACJ
Bldg. AUXILIARY Floor El. 139 Room, Area -3/Z Ai)Manufacturer, Model, Etc. (optional but recommended)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[tNF[] U--1 N/AD and masonry block walls not likely to collapse onto the equipment?
I , Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 9. Do attached lines have adequate flexibility to avoid damage?             Yb/ND U0- N/AQ 1;C'e t-T&                       r*i               or'4Q V-V POT~ -JjC AI          r   a-XC       Z t CV* 10.-'Baed on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y8-N" of the 50% of SWEL items requiring such verification)?
Yt*"N[o UD Other Adverse Conditions
sewv ALdd.. 3 -Z-o-q 5 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 11. Have you looked for and found no other seismic conditions that could     YE4<cD    UM adversely affect the safety functions of the equipment?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Comments (Additional pages may be added as necessary)
Y[tA ur- N/A-1 U0 N/A]&#xfd;&#xfd;NO U!] N/AE Yt< NO UI] N/AD-5& po-- &e p rd" , A,4cA d-- &#xfd;t --r Av c, e 6. Based on the above anchorage evaluations, is the anchorage free of Y N0"] U!]potentially adverse seismic conditions?
AJVDVf Evaluated by: ....                     k             "* "                       Date:  X    -    zo'Z-( Y~yk~(   x~1a <Z/
Page 371 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 372 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 373 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                             NO. SNCF164-RPT-01, VERSION 2.0 Sheet of Status: YI*N'*"1 UEJ Seismic Walkcdown Checklist (SWC)
Equipment ID No. Q1R168031                        Equip. Class,    o .
Equipment Description CIRCUIT BREAKER BOX Location: Bldg. AUXILIARY Floor El. 139                     Room, Area     332 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anehoraee
: 1. Is the anchorage configuration verification required (i.e., is the item one Y[C NE&#xfd;     '
of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?           Ye*        U['U N/AD
: 3. Is the anchorage free of corrosion that is more than mild surface           */N-      U" N/AO oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?   Y&<CJ UEJ N/AQ
: 5. Is the anchorage configuration consistent with plant documentation?         YO1 Nil UC NI5",
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y1140$F UQ]
potentially adverse seismic conditions?
I Enter the equipment class name from Appendix B: Classes of Equipment.
I Enter the equipment class name from Appendix B: Classes of Equipment.
Page 378 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Of 3 Status: 71NO] U0[Seismic Walkdown Checklist (SWC)Equipment ID No. O1R18B035 Equip. Class, 14 Equipment Description CIRCUIT BREAKER BOX Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Page 374 of 562
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
 
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YA6NO- U["3 N/AD3 16N/NH UEJ N/AD YS.-N)D UD] N/AD" ~U0 Other Adverse Conditions
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 She~t 2 ofV"1 Status: Yt NEI UL]
: 11. Have you looked for and found no other seismic conditions that could Y&#xfd; NQ UD adversely affect the safety functions of the equipment?
Seismic Walkdown Checklist (SWC)
Comments (Additional pages may be added as necessary) 4 .02 Evaluated by: 7 7 L.JA .Hg," Date: 9,/o. 2_0/12 ci. tOL'Page 379 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 380 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 S Sheet 1 of-d&#xfd;Status: YMN-3 U-]Seismic Walkdown Checklist (SWC)Equipment ID No. Q1R21BOO1A Equip. Class, 14 Equipment Description VITAL AC BREAKER BOX Location:
Equipment ID No. OIR18B031                    Equip. Class2 Equipment Description CIRCUIT BREAKER BOX Interaction Effects 4
Bldg. AUXILIARY Floor El. 155' Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)
: 7. Are soft targets free from impact by nearby equipment or structures?       Y3, 1(    UD N/AD
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[frlND UD N/AD and masonry block walls not likely to collapse onto the equipment?
Additional space is provided at the end of this checklist for documenting other comments.Anchoraze I. Is the anchorage configuration verification required (i.e., is the item one YO N of the 50% of SWEL items requiring such verification)?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y .-'ND- UD N/AD COt,roo T A 00 5-5/ v,&#xfd; ,.-.fs,-w,                                 ,.,,,Jj' t- k.,,W .t.. IT-s ,,'C.-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
40,,     W_-T-                             O's- hct            5N1C tktkVC . 1& i5j          ...
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
                                                                                              -          --&#xfd;CL,
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
            - 0. Based on the above seismic interaction evaluations, is equipment free     Y[*-fq"  UD of potentially adverse seismic interaction effects?
Yid NOI Ur N/AQ Y,0 NO UO N/AQ Yy"NO UO N/AO YO NO UO N/APf Y)1No UQ IEnter the equipment class name from Appendix B: Classes of Equipment.
Other Adverse Conditions
Page 381 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of Status: NI- UI Seismic Walkdown Checklist (SWC)Equipment ID No. 01R21BOO1A Equip. Class, Equipment Description VITAL AC BREAKER Box Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 11. Have you looked for and found no other seismic conditions that could       Y&&#xfd;N[]UD]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
adversely affect the safety functions of the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y)1NO UO N/AQ Y) NO UI N/AO Y NEI U= N/AO Yf ND UI Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y -NO U-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
CommentS (Additional pages may be added as necessary)
                                    /V6 A.>;
: 2. ZAP Evaluated by Evaluated byDae cl&#xfd; L-1 LLD (Y Date: Page 382 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION 2.0 Page 383 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS
Evaluated by:                          G1 DX-&#xfd;fUA&#xfd;&#xfd;
&NO. SNCF164-RPT-01, VERSION 2.0 Page 384 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 385 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of " t L ', Status: Y[: f NO uf1 Seismic Walkdown Checklist (SWC)Equipment ID No. QIR21EOO9C Equip. Class' 14 Equipment Description INVERTER IC ,,W.., ..Location:
                                                    -1 04 1                                Date:   V.z      /.
Bldg, AUXILIARY Floor El. # /it/ Room, Area ! p/ t Manufacturer, Model, Etc. (optional but recommended)
: r.            u4&#xb6;i4 A_________
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Page 375 of 562
Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
 
YM NU 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 376 of 562
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?/YE/INC UO N/AC Y[WN" U- N/AC/U NO UC N/AC 5. Is the anchorage configuration consistent with plant documentation? NC UC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
Vel~ie'l~b
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 377 of 562
&#xa3;!OIIIOLVAANWOO t c *QHA2CtoMe FC7z5WS TOP-Q2IR2 w 9C " C,,IIZZI eO9A7 'PAT&V 'W/24/-9* (N07)6. Based on the above anchorage evaluations, is the anchorage free of Y60t"No UC potentially adverse seismic conditions?
 
N/AC IEnter the equipment class name from Appendix B: Classes of Equipment.
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                           NO. SNCF164-RPT-01, VERSION 2.0 r14 F~I-Sheet I of 3 Status: YE&#xfd; N[] Ur"I Seismic Walkdown Checklist (SWC)
Page 386 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r, 1 1 6? &#xfd;)&#xfd;-fl Sheet 2 off ;jrP1 Status: YiA' N[] UrI] J11dF7 Seismic Walkdown Checklist (SWC)Equipment ID No. QIR21EO09C Equip. Class, 14 Equipment Description INVERTER IC Interaction Effects 7. Are soft targets free firom impact by nearby equipment or structures?
Equipment ID No. QIR18B035                        Equip. Class' 14 Equipment Description CIRCUIT BREAKER BOX Location: Bldg. AUXILIARY Floor El. 139                      Room, Area             -  3/Z    Ai)
Manufacturer, Model, Etc. (optional but recommended)                     I                        ,
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y8-N" of the 50% of SWEL items requiring such verification)?
sewvALdd..                    3 - Z-o-q 5
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y[tA      ur- N/A-1
: 3. Is the anchorage free of corrosion that is more than mild surface                       U0 N/A]
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?     &#xfd;&#xfd;NO U!] N/AE
: 5. Is the anchorage configuration consistent with plant documentation?           Yt< NO UI] N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
                              -5& po-- &e                  p        rd", A,4cAd--        &#xfd;t    --r Av c,        e
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y    N0"] U!]
potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 378 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                         NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Of 3 Status: 71NO] U0[
Seismic Walkdown Checklist (SWC)
Equipment ID No. O1R18B035                  Equip. Class, 14 Equipment Description CIRCUIT BREAKER BOX Interaction Effects YA6NO- U["3 N/AD3
: 7. Are soft targets free from impact by nearby equipment or structures?
16N/NH UEJ N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIN" UEJ N/AC Y[V/NO U"I N/Al Y[VN-I UCI N/ACl Y[4/N'- UCI Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?               YS.-N)D UD] N/AD
: 11. Have you looked for and found no other seismic conditions that could YS(ND Ull adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free      "      ~U0 of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could      Y&#xfd; NQ UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 4                .02 Evaluated by:    5a*a*-  77                    1f*.*                              Date:  9,/o. 2_0/12 L.JA .      Hg,"                                                      ci. tOL' Page 379 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO. SNCF164-RPT-01, VERSION 2.0 Page 380 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                          NO. SNCF164-RPT-01, VERSION 2.0 S
Sheet 1 of-d&#xfd; Status: YMN-3 U-]
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q1R21BOO1A                      Equip. Class, 14 Equipment Description VITAL AC BREAKER BOX Location: Bldg. AUXILIARY Floor El. 155'                      Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraze I. Is the anchorage configuration verification required (i.e., is the item one  YO N of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?            Yid NOI Ur  N/AQ
: 3. Is the anchorage free of corrosion that is more than mild surface            Y,0 NO UO N/AQ oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?    Yy"NO UO N/AO
: 5. Is the anchorage configuration consistent with plant documentation?          YO NO UO N/APf (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of          Y)1No UQ potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 381 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                      NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of Status:      NI- UI Seismic Walkdown Checklist (SWC)
Equipment ID No. 01R21BOO1A                  Equip. Class, Equipment Description VITAL AC BREAKER Box Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?      Y)1NO UO N/AQ
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y)  NO UI    N/AO and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?              Y    NEI U=    N/AO
: 10. Based on the above seismic interaction evaluations, is equipment free     Yf ND UI of potentially adverse seismic interaction effects?
Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could      Y  -NO U-I adversely affect the safety functions of the equipment?
CommentS (Additional pages may be added as necessary) 2.ZAP Evaluated by Evaluated                  byDae Date:
cl&#xfd; LLD L-1 (Y
Page 382 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                NO, SNCF164-RPT-01, VERSION 2.0 Page 383 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS          NO. SNCF164-RPT-01, VERSION 2.0
&
Page 384 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS            NO. SNCF164-RPT-01, VERSION 2.0 Page 385 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                            NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of "L t ',
Status: Y[:f NO uf1 Seismic Walkdown Checklist (SWC)
Equipment ID No. QIR21EOO9C                      Equip. Class' 14 Equipment Description INVERTER IC                ,,W..,      fio,,*  ..
Location: Bldg, AUXILIARY Floor El. #              /it/    Room, Area      !                      p/t Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraee
: 1. Is the anchorage configuration verification required (i.e., is the item one  YM NU of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?            YE/INC UO N/AC
                                                                                            /
: 3. Is the anchorage free of corrosion that is more than mild surface            Y[WN"    U-  N/AC oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?        /UNO UC N/AC
: 5. Is the anchorage configuration consistent with plant documentation?          Y[* NC UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Vel~ie'l~b &#xa3;!OIIIOLVAANWOO ct                    *QHA2CtoMe FC7z5WS TOP-Q2IR2 w 9C " C,,IIZZI eO9A7 'PAT&V 'W/24/-9* (N07)
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y60t"No UC potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 386 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                                          NO. SNCF164-RPT-01, VERSION 2.0 r, 11 6? &#xfd;)&#xfd;-                                            fl Sheet 2 off ;jrP1 Status: YiA' N[] UrI] J11dF7 Seismic Walkdown Checklist (SWC)
Equipment ID No. QIR21EO09C                    Equip. Class, 14 Equipment Description INVERTER IC Interaction Effects
: 7. Are soft targets free firom impact by nearby equipment or structures?      YIN" UEJ N/AC
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,  Y[V/NO U"I N/Al and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?              Y[VN-I UCI N/ACl
: 10. Based on the above seismic interaction evaluations, is equipment free      Y[ 4/N'- UCI of potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YS(ND Ull adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
MOVE Evaluated by:.RWPMKl5 fi &J/ L/ 'I Date: __ __ __ __9 ,//Ox-I. 70AI/- 1 1 -I Page 387 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 388 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 389 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 390 of 562 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 a I I~1 Page 391 of 562}}
MOVE Evaluated by:. RWPMKl5                         fi       &J Date: __    __   __ __
I. 70AI                /            'I L/                                9 ,//Ox-
                                      /- 1 1 - I Page 387 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 388 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 389 of 562
 
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS                 NO. SNCF164-RPT-01, VERSION 2.0 Page 390 of 562
 
NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS I
a I                   ~1 Page 391 of 562}}

Revision as of 08:02, 4 November 2019

Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562
ML14071A072
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/20/2014
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-14-0249
Download: ML14071A072 (41)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of/ 5 1Jvp Status: YO NEI UFI Seismic Walkdown Checklist (SWC)

Equipment ID No. Q1R17BO02 Equip. Class' I Equipment Description MCC 10 Location: Bldg. AUXILIARY Floor El. 121 Room, Area 72O Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[2/N]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YECN/NO U- N/AO
3. Is the anchorage free of corrosion that is more than mild surface Y[2'/N0 UO N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y4 ND U] N/AO
5. Is the anchorage configuration consistent with plant documentation? YI[ NO U[ N/AQ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

~~~&E ~ r fA.T, A e

6. Based on the above anchorage evaluations, is the anchorage free of Y[d NO U'-

potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 351 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 F -F7 Sheet 2 of 2I¢' -10 Status: Yo N[O U[-

Seismic Walkdown Checklist (SWC)

EquipmentiDNo. QIREf7fe2 Equip. i Equipment Description MCC 18 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yd ND UD N/AD 8, Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[2fANO U- N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yr/ND UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y4ND UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ND UD adversely affect the safety functions of the equipment?

0 mnL~dtoa ae may be added as necessary) r L/ 4v I Q~*Jt~ ML~,(T Evaluated by:. ~.Yu'AO Date: 7/to 1/1,P11,~v iv)I (K~) 11/t01tV z

Page 352 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 3 of:;3 ,tkolt 90 Status: Yj'NL-] UF'I]

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR178002 Equip.

Equipment Description MCC 1B Photographs I T* dP WF~C 00J THE2ýT~ W~4--

To ppVE=P E-W JAOVe MjMtA 97 t~E:10 TfH.E M~cC LQC-ATACI)0k TI I iEAOT A~J AT Mep- 1 AFthMrC C~)~ ~T C~

Note: Note:

~jn, ~/

Note: Note:

Page 353 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 354 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 355 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 356 of 562

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 357 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 1\

-,J r

- '%esm Page 358 of 562

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 359 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

-'3

-J Page 360 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 "T--I -V.n Page 361 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

-3

-'t- N-. ,

Page 362 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 363 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 TI

..,

- x ýZ-'

Page 364 of 562

nki 11 A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. lalNG io4-mr I-U0, vr'ru

.. ' '

Page 365 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

,%X she of Status: Y9 NEI U[0 Seismic Walkdown Checklist (SWC)

Equipment ID No. OIR178507-A Equip. Classý Equipment Description MCC IN Location: Bldg. DIESEl Floor El. 155 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Auchorase

1. Is the anchorage configuration verification required (i.e., is the item one EI* NUI" of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y9'Nr1 UlI N/AD
3. Is the anchorage free of corrosion that is more than mild surface YjN3UQ N/ADJ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE'ND U-] N/AID
5. Is the anchorage configuration consistent with plant documentation? YO ND UD N/Alf (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y& NO Ul potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment Page 366 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 rC ~

Status: uE%ýINJ U

Seismic Walkdown Checklist (SWC)

Equipment ID No. 0IR17B507-A Equip. Class, Equipment Description MCC 1N Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yd"NQ U N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI*C]N UI] N/AC]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y[2/NE3 UC] N/AC]
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y*rNC UC adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Plwc-Evaluated' ~-, -z-t [I

-1161- Iq a" M frw"014v.

Page 367 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

.4 Page 368 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r-I I --

i . , I I Page 369 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 ofsfx' Staturs Y~dNI U1'N]u Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR18B029 Equip. Class'-2 Equipment Description POWER DISCONNECTSWITCH Location: Bldg. AUIYU1ARY Floor E. ,*/j4.. Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Auchorae

1. Is the anchorage configuration verification required (i.e., is the item one YO N§1"1 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YNF'<0 U1) N/AD
3. Is the anchorage free of corrosion that is more than mild surface Ye"NO Ul- N/AQ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y&NO UID N/Ar
5. Is the anchorage configuration consistent with plant documentation? YO NO U- N/AID "

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yrb/NO 1)0 potentially adverse seismic conditions?

IEnter the equipment clan name from Appendix B: Classes of Equipment.

Page 370 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 CAL Sheeat of Status: YE N[-] U[']

Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR18B029 Equip. Class, 2 Equipment Description POWER DISCONNECT SWITCH Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIV<DOUEJ N/ACJ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[tNF[] U--1 N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yb/ND U0- N/AQ 1;C'e t-T& r*i or'4Q V-V POT~ -JjC AI r a-XC Z t CV* 10.-'Baed on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yt*"N[o UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE4<cD UM adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

AJVDVf Evaluated by: .... k "* " Date: X - zo'Z-( Y~yk~( x~1a <Z/

Page 371 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 372 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 373 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet of Status: YI*N'*"1 UEJ Seismic Walkcdown Checklist (SWC)

Equipment ID No. Q1R168031 Equip. Class, o .

Equipment Description CIRCUIT BREAKER BOX Location: Bldg. AUXILIARY Floor El. 139 Room, Area 332 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anehoraee

1. Is the anchorage configuration verification required (i.e., is the item one Y[C NEý '

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Ye* U['U N/AD
3. Is the anchorage free of corrosion that is more than mild surface */N- U" N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y&<CJ UEJ N/AQ
5. Is the anchorage configuration consistent with plant documentation? YO1 Nil UC NI5",

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y1140$F UQ]

potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 374 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 She~t 2 ofV"1 Status: Yt NEI UL]

Seismic Walkdown Checklist (SWC)

Equipment ID No. OIR18B031 Equip. Class2 Equipment Description CIRCUIT BREAKER BOX Interaction Effects 4

7. Are soft targets free from impact by nearby equipment or structures? Y3, 1( UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[frlND UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y .-'ND- UD N/AD COt,roo T A 00 5-5/ v,ý ,.-.fs,-w, ,.,,,Jj' t- k.,,W .t.. IT-s ,,'C.-

40,, W_-T- O's- hct 5N1C tktkVC . 1& i5j ...

- --ýCL,

- 0. Based on the above seismic interaction evaluations, is equipment free Y[*-fq" UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y&ýN[]UD]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

/V6 A.>;

Evaluated by: G1 DX-ýfUAýý

-1 04 1 Date: V.z /.

r. u4¶i4 A_________

Page 375 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 376 of 562

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS Page 377 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r14 F~I-Sheet I of 3 Status: YEý N[] Ur"I Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR18B035 Equip. Class' 14 Equipment Description CIRCUIT BREAKER BOX Location: Bldg. AUXILIARY Floor El. 139 Room, Area - 3/Z Ai)

Manufacturer, Model, Etc. (optional but recommended) I ,

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y8-N" of the 50% of SWEL items requiring such verification)?

sewvALdd.. 3 - Z-o-q 5

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[tA ur- N/A-1
3. Is the anchorage free of corrosion that is more than mild surface U0 N/A]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? ýýNO U!] N/AE
5. Is the anchorage configuration consistent with plant documentation? Yt< NO UI] N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

-5& po-- &e p rd", A,4cAd-- ýt --r Av c, e

6. Based on the above anchorage evaluations, is the anchorage free of Y N0"] U!]

potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 378 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 Of 3 Status: 71NO] U0[

Seismic Walkdown Checklist (SWC)

Equipment ID No. O1R18B035 Equip. Class, 14 Equipment Description CIRCUIT BREAKER BOX Interaction Effects YA6NO- U["3 N/AD3

7. Are soft targets free from impact by nearby equipment or structures?

16N/NH UEJ N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YS.-N)D UD] N/AD
10. Based on the above seismic interaction evaluations, is equipment free " ~U0 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yý NQ UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 4 .02 Evaluated by: 5a*a*- 77 1f*.* Date: 9,/o. 2_0/12 L.JA . Hg," ci. tOL' Page 379 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 380 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 S

Sheet 1 of-dý Status: YMN-3 U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q1R21BOO1A Equip. Class, 14 Equipment Description VITAL AC BREAKER BOX Location: Bldg. AUXILIARY Floor El. 155' Room, Area 416 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraze I. Is the anchorage configuration verification required (i.e., is the item one YO N of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Yid NOI Ur N/AQ
3. Is the anchorage free of corrosion that is more than mild surface Y,0 NO UO N/AQ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yy"NO UO N/AO
5. Is the anchorage configuration consistent with plant documentation? YO NO UO N/APf (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y)1No UQ potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 381 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 2 of Status: NI- UI Seismic Walkdown Checklist (SWC)

Equipment ID No. 01R21BOO1A Equip. Class, Equipment Description VITAL AC BREAKER Box Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y)1NO UO N/AQ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y) NO UI N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y NEI U= N/AO
10. Based on the above seismic interaction evaluations, is equipment free Yf ND UI of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y -NO U-I adversely affect the safety functions of the equipment?

CommentS (Additional pages may be added as necessary) 2.ZAP Evaluated by Evaluated byDae Date:

clý LLD L-1 (Y

Page 382 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION 2.0 Page 383 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0

&

Page 384 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 385 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Sheet 1 of "L t ',

Status: Y[:f NO uf1 Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR21EOO9C Equip. Class' 14 Equipment Description INVERTER IC ,,W.., fio,,* ..

Location: Bldg, AUXILIARY Floor El. # /it/ Room, Area  ! p/t Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraee

1. Is the anchorage configuration verification required (i.e., is the item one YM NU of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE/INC UO N/AC

/

3. Is the anchorage free of corrosion that is more than mild surface Y[WN" U- N/AC oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? /UNO UC N/AC
5. Is the anchorage configuration consistent with plant documentation? Y[* NC UC N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Vel~ie'l~b £!OIIIOLVAANWOO ct *QHA2CtoMe FC7z5WS TOP-Q2IR2 w 9C " C,,IIZZI eO9A7 'PAT&V 'W/24/-9* (N07)

6. Based on the above anchorage evaluations, is the anchorage free of Y60t"No UC potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 386 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 r, 11 6? ý)ý- fl Sheet 2 off ;jrP1 Status: YiA' N[] UrI] J11dF7 Seismic Walkdown Checklist (SWC)

Equipment ID No. QIR21EO09C Equip. Class, 14 Equipment Description INVERTER IC Interaction Effects

7. Are soft targets free firom impact by nearby equipment or structures? YIN" UEJ N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[V/NO U"I N/Al and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[VN-I UCI N/ACl
10. Based on the above seismic interaction evaluations, is equipment free Y[ 4/N'- UCI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YS(ND Ull adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

MOVE Evaluated by:. RWPMKl5 fi &J Date: __ __ __ __

I. 70AI / 'I L/ 9 ,//Ox-

/- 1 1 - I Page 387 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 388 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 389 of 562

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 2.0 Page 390 of 562

NO. SNCF164-RPT-01, VERSION 2.0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS I

a I ~1 Page 391 of 562