ML15124A340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 May 6, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 6, 2015 Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249


==SUBJECT:==
==SUBJECT:==
NUCLEAR REGULATORY COMMISSION PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATIONS, INC'S. FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR INDIAN POINT NUCLEAR GENEARTING UNIT NOS. 2 AND 3 (TAC NOS. MF3313 AND MF3314)  
NUCLEAR REGULATORY COMMISSION PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATIONS, INC'S. FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR INDIAN POINT NUCLEAR GENEARTING UNIT NOS. 2 AND 3 (TAC NOS. MF3313 AND MF3314)


==Dear Sir or Madam,==
==Dear Sir or Madam,==
This letter documents the U.S Nuclear Regulatory Commission (NRC) staff's plan to perform an additional regulatory audit of Entergy Nuclear Operations, Inc. (Entergy)
 
Flood Hazard Reevaluation Report (FHRR) submittal related to the Fukushima Near-Term Task Force Recommendation 2.1, Flooding for Indian Point Nuclear Generation Unit Nos. 2 and 3 (Indian Point). This technical audit will be performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082900195).
This letter documents the U.S Nuclear Regulatory Commission (NRC) staff's plan to perform an additional regulatory audit of Entergy Nuclear Operations, Inc. (Entergy) Flood Hazard Reevaluation Report (FHRR) submittal related to the Fukushima Near-Term Task Force Recommendation 2.1, Flooding for Indian Point Nuclear Generation Unit Nos. 2 and 3 (Indian Point). This technical audit will be performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No.
The audit will be conducted over multiple sessions, as needed, and the NRC staff will develop an audit summary report to document its observations and conclusions within 90 days of the final audit session. The audit will provide the NRC with a better understanding of three key aspects of the Indian Point FHRR, which was submitted on December 23, 2013 (ADAMS Accession No. ML13364A005), and revised on December 9, 2014 (ADAMS Accession No. ML14357A052).
ML082900195). The audit will be conducted over multiple sessions, as needed, and the NRC staff will develop an audit summary report to document its observations and conclusions within 90 days of the final audit session.
Those areas to be covered by the audit include the following:
The audit will provide the NRC with a better understanding of three key aspects of the Indian Point FHRR, which was submitted on December 23, 2013 (ADAMS Accession No.
storm surge analysis; dam failure analysis; and selection of a probable maximum precipitation magnitude for use in the respective flood hazard re-evaluations.
ML13364A005), and revised on December 9, 2014 (ADAMS Accession No. ML14357A052).
The audit is intended to support completion of the staff's review of the FHRR and the subsequent issuance of a Staff Assessment.
Those areas to be covered by the audit include the following: storm surge analysis; dam failure analysis; and selection of a probable maximum precipitation magnitude for use in the respective flood hazard re-evaluations. The audit is intended to support completion of the staff's review of the FHRR and the subsequent issuance of a Staff Assessment.
The enclosed audit plan outlines the process that will allow the NRC staff to identify additional information necessary for the staff to complete the FHRR review. The details of this audit have been discussed with Mr. Bryan Ford of your staff. If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert.Kuntz@nrc.gov.
The enclosed audit plan outlines the process that will allow the NRC staff to identify additional information necessary for the staff to complete the FHRR review. The details of this audit have been discussed with Mr. Bryan Ford of your staff.
Docket Nos. 50-247 and 50-286  
 
If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert.Kuntz@nrc.gov.
Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


==Enclosure:==
==Enclosure:==


Audit Plan cc w/encl: Distribution via Listserv Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation NRC PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATION INC'S. FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATED TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1, FLOODING FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 BACKGROUND AND AUDIT BASIS: By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 1 O of the Code of Federal Regulations (1 O CFR), Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter").
Audit Plan cc w/encl: Distribution via Listserv
The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.
 
Recommendation 2.1 of that document recommended that the staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance.
NRC PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATION INC'S.
Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).
FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATED TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1, FLOODING FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 BACKGROUND AND AUDIT BASIS:
By letter dated December 23, 2013, Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted its Flood Hazard Reevaluation Report (FHRR) for Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13364A005) and revised the FHRR on December 9, 2014 (ADAMS Accession No. ML14357A052). The NRC staff has begun its review of the aforementioned submittal and plans to conduct a regulatory audit of Entergy to aid in its review of the licensee's FHRR. REGULATORY AUDIT SCOPE AND METHODOLGY:
By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 1O of the Code of Federal Regulations (1 O CFR),
Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter"). The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Recommendation 2.1 of that document recommended that the staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance. Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).
By letter dated December 23, 2013, Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted its Flood Hazard Reevaluation Report (FHRR) for Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13364A005) and revised the FHRR on December 9, 2014 (ADAMS Accession No. ML14357A052). The NRC staff has begun its review of the aforementioned submittal and plans to conduct a regulatory audit of Entergy to aid in its review of the licensee's FHRR.
REGULATORY AUDIT SCOPE AND METHODOLGY:
The areas of focus for the regulatory audit is the information contained in the Indian Point FHRR submittal, and all associated and relevant supporting documentation used in the development of the aforementioned document including, but not limited to, methodology, process information, calculations, computer models, etc. The audit will be conducted and completed over several meetings, the dates of which will be determined, as necessary.
The areas of focus for the regulatory audit is the information contained in the Indian Point FHRR submittal, and all associated and relevant supporting documentation used in the development of the aforementioned document including, but not limited to, methodology, process information, calculations, computer models, etc. The audit will be conducted and completed over several meetings, the dates of which will be determined, as necessary.
Enclosure   INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT: The information required for the audit is the licensee's models and supporting calculations, documentation related to the storm surge and site specific probable maximum precipitation analyses, HEC-HMS and HEC-RAS modeling, event durations, and the dam failure analysis.
Enclosure
 
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT:
The information required for the audit is the licensee's models and supporting calculations, documentation related to the storm surge and site specific probable maximum precipitation analyses, HEC-HMS and HEC-RAS modeling, event durations, and the dam failure analysis.
Other information needs will be discussed as audit meetings are scheduled.
Other information needs will be discussed as audit meetings are scheduled.
NRC AUDIT TEAM: Title Team Member Affiliation Team Leader, NRR/JLD Robert Kuntz NRC Branch Chief, NRO/DSEA Chris Cook NRC Technical Lead Mike Lee NRC Technical Support Michelle Bensi NRC Technical Support Kevin Quinlan NRC Technical Support Henry Jones NRC Technical Manager Laura Quinn-Willingham NRC Technical Support Rajiv Prasad Pacific Northwest National Laboratory Technical Support Scott DeNeale Oak Ridge National Laboratory Technical Support Chih-Chieh Kao Oak Ridge National Laboratory Technical Support Chris Bender Taylor Engineering LOGISTICS:
NRC AUDIT TEAM:
The audit meetings will be coordinated with Entergy staff. DELIVERABLES:
Title                 Team Member                           Affiliation Team Leader, NRR/JLD         Robert Kuntz               NRC Branch Chief, NRO/DSEA       Chris Cook                   NRC Technical Lead               Mike Lee                   NRC Technical Support           Michelle Bensi               NRC Technical Support           Kevin Quinlan               NRC Technical Support           Henry Jones                 NRC Technical Manager             Laura Quinn-Willingham     NRC Technical Support           Rajiv Prasad                 Pacific Northwest National Laboratory Technical Support           Scott DeNeale               Oak Ridge National Laboratory Technical Support           Chih-Chieh Kao               Oak Ridge National Laboratory Technical Support           Chris Bender                 Taylor Engineering LOGISTICS:
The audit meetings will be coordinated with Entergy staff.
DELIVERABLES:
The NRC team will develop an audit summary report to convey the audit results. The report will be placed in ADAMS within 90 days of the completion of the final audit session, and will be publicly available.
The NRC team will develop an audit summary report to convey the audit results. The report will be placed in ADAMS within 90 days of the completion of the final audit session, and will be publicly available.
The information discussed in the audit may be included, fully or in part, in the development of the NRC technical staff's assessment documenting the staff's FHRR review. If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert. Kuntz@nrc.gov.
The information discussed in the audit may be included, fully or in part, in the development of the NRC technical staff's assessment documenting the staff's FHRR review.
Docket Nos. 50-247 and 50-286  
 
If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert. Kuntz@nrc.gov.
Sincerely, IRA by Tekia Govan for/
Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286


==Enclosure:==
==Enclosure:==


Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:
Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC JLD R/F RidsNRRJLD Resource Mlee, NRR RKuntz, NRR CCook, NRO ARivera, NRO JBowen, NRR MBensi, NRO HJones, NRO BHarvey, NRO MShams, NRR KErwin, NRO KQuinlan, NRO RidsNrrLASLent ADAMS Accession No.: ML15124A340 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NAME RKuntz SLent DATE 05/06/15 05/06/15 Sincerely, IRA by Tekia Govan for/ Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation LQuinn-Willingham, NRO MFranovich, NRR RidsNrrPMlndianPoint Resource RidsNrrDorllpl 1-1 Resource NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM MShams RKuntz (TGovan for) 05/06/15 05/06/15 OFFICAL RECORD COPY}}
PUBLIC JLD R/F RidsNRRJLD Resource Mlee, NRR       RKuntz, NRR     MShams, NRR            LQuinn-Willingham, NRO CCook, NRO     ARivera, NRO   KErwin, NRO            MFranovich, NRR JBowen, NRR     MBensi, NRO     KQuinlan, NRO          RidsNrrPMlndianPoint Resource HJones, NRO     BHarvey, NRO   RidsNrrLASLent         RidsNrrDorllpl 1-1 Resource ADAMS Accession No.: ML15124A340 OFFICE NRR/JLD/JHMB/PM       NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC         NRR/JLD/JHMB/PM NAME    RKuntz              SLent            MShams                 RKuntz (TGovan for)
DATE    05/06/15            05/06/15          05/06/15               05/06/15 OFFICAL RECORD COPY}}

Revision as of 12:04, 31 October 2019

Nuclear Regulatory Commission Plan for the Audit of Entergy Nucleaer Operations, Inc'S. Flooding Hazard Reevaluation Report Submittal Relating to the Fukushima Near-Term Task Force Recommendation 2.1 - Flooding for Indian Point Nuclear Gene
ML15124A340
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/06/2015
From: Robert Kuntz
Japan Lessons-Learned Division
To: Coyle L
Entergy Nuclear Operations
Kuntz, Rober 415-3733
References
TAC MF3313, TAC MF3314
Download: ML15124A340 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 6, 2015 Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

NUCLEAR REGULATORY COMMISSION PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATIONS, INC'S. FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATING TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR INDIAN POINT NUCLEAR GENEARTING UNIT NOS. 2 AND 3 (TAC NOS. MF3313 AND MF3314)

Dear Sir or Madam,

This letter documents the U.S Nuclear Regulatory Commission (NRC) staff's plan to perform an additional regulatory audit of Entergy Nuclear Operations, Inc. (Entergy) Flood Hazard Reevaluation Report (FHRR) submittal related to the Fukushima Near-Term Task Force Recommendation 2.1, Flooding for Indian Point Nuclear Generation Unit Nos. 2 and 3 (Indian Point). This technical audit will be performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML082900195). The audit will be conducted over multiple sessions, as needed, and the NRC staff will develop an audit summary report to document its observations and conclusions within 90 days of the final audit session.

The audit will provide the NRC with a better understanding of three key aspects of the Indian Point FHRR, which was submitted on December 23, 2013 (ADAMS Accession No.

ML13364A005), and revised on December 9, 2014 (ADAMS Accession No. ML14357A052).

Those areas to be covered by the audit include the following: storm surge analysis; dam failure analysis; and selection of a probable maximum precipitation magnitude for use in the respective flood hazard re-evaluations. The audit is intended to support completion of the staff's review of the FHRR and the subsequent issuance of a Staff Assessment.

The enclosed audit plan outlines the process that will allow the NRC staff to identify additional information necessary for the staff to complete the FHRR review. The details of this audit have been discussed with Mr. Bryan Ford of your staff.

If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert.Kuntz@nrc.gov.

Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

Audit Plan cc w/encl: Distribution via Listserv

NRC PLAN FOR THE AUDIT OF ENTERGY NUCLEAR OPERATION INC'S.

FLOOD HAZARD REEVALUATION REPORT SUBMITTAL RELATED TO THE FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.1, FLOODING FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 BACKGROUND AND AUDIT BASIS:

By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 1O of the Code of Federal Regulations (1 O CFR),

Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter"). The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Recommendation 2.1 of that document recommended that the staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance. Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).

By letter dated December 23, 2013, Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted its Flood Hazard Reevaluation Report (FHRR) for Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13364A005) and revised the FHRR on December 9, 2014 (ADAMS Accession No. ML14357A052). The NRC staff has begun its review of the aforementioned submittal and plans to conduct a regulatory audit of Entergy to aid in its review of the licensee's FHRR.

REGULATORY AUDIT SCOPE AND METHODOLGY:

The areas of focus for the regulatory audit is the information contained in the Indian Point FHRR submittal, and all associated and relevant supporting documentation used in the development of the aforementioned document including, but not limited to, methodology, process information, calculations, computer models, etc. The audit will be conducted and completed over several meetings, the dates of which will be determined, as necessary.

Enclosure

INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT:

The information required for the audit is the licensee's models and supporting calculations, documentation related to the storm surge and site specific probable maximum precipitation analyses, HEC-HMS and HEC-RAS modeling, event durations, and the dam failure analysis.

Other information needs will be discussed as audit meetings are scheduled.

NRC AUDIT TEAM:

Title Team Member Affiliation Team Leader, NRR/JLD Robert Kuntz NRC Branch Chief, NRO/DSEA Chris Cook NRC Technical Lead Mike Lee NRC Technical Support Michelle Bensi NRC Technical Support Kevin Quinlan NRC Technical Support Henry Jones NRC Technical Manager Laura Quinn-Willingham NRC Technical Support Rajiv Prasad Pacific Northwest National Laboratory Technical Support Scott DeNeale Oak Ridge National Laboratory Technical Support Chih-Chieh Kao Oak Ridge National Laboratory Technical Support Chris Bender Taylor Engineering LOGISTICS:

The audit meetings will be coordinated with Entergy staff.

DELIVERABLES:

The NRC team will develop an audit summary report to convey the audit results. The report will be placed in ADAMS within 90 days of the completion of the final audit session, and will be publicly available.

The information discussed in the audit may be included, fully or in part, in the development of the NRC technical staff's assessment documenting the staff's FHRR review.

If you have any questions, please contact me at (301) 415-3733 or by e-mail at Robert. Kuntz@nrc.gov.

Sincerely, IRA by Tekia Govan for/

Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

Audit Plan cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC JLD R/F RidsNRRJLD Resource Mlee, NRR RKuntz, NRR MShams, NRR LQuinn-Willingham, NRO CCook, NRO ARivera, NRO KErwin, NRO MFranovich, NRR JBowen, NRR MBensi, NRO KQuinlan, NRO RidsNrrPMlndianPoint Resource HJones, NRO BHarvey, NRO RidsNrrLASLent RidsNrrDorllpl 1-1 Resource ADAMS Accession No.: ML15124A340 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME RKuntz SLent MShams RKuntz (TGovan for)

DATE 05/06/15 05/06/15 05/06/15 05/06/15 OFFICAL RECORD COPY