{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-4352 December 20, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road
 
Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1
- CLINTON POWER STATION, UNIT 1  


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
We have received your corporate letter RS-1 6-1 5 6, dated July 18, 201 6 , in response to U.S. Nuclear Regulatory Commission (N RC) Regulatory Issue Summary 2016
 
-0 9 , "Preparation and Scheduling of Operator Licensing Examinations.In the letter, you requested no initial operator licensing examination s be scheduled through 2021 at the Clinton Power Station. Previously in station letter U-604281, dated May 23, 201 6, you had requested initial license examination dates for January 2017, July 2018 , and March 2019 at the Clinton Power Station.
We have received your corporate letter RS-16-156, dated July 18, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested no initial operator licensing examinations be scheduled through 2021 at the Clinton Power Station. Previously in station letter U-604281, dated May 23, 2016, you had requested initial license examination dates for January 2017, July 2018, and March 2019 at the Clinton Power Station.
In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.
In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.
In accordance with Title 10 of the Code of Federal Regulati ons 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Sincerely,
 
                                                  /RA/
Docket No.
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV
50-461 License No. NPF-6 2 cc: Distribution via LISTSERV


Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  
Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1
- CLINTON POWER STATION, UNIT 1


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==


We have received your corporate letter RS 156, dated July 18, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016
We have received your corporate letter RS-16-156, dated July 18, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested no initial operator licensing examinations be scheduled through 2021 at the Clinton Power Station. Previously in station letter U-604281, dated May 23, 2016, you had requested initial license examination dates for January 2017, July 2018, and March 2019 at the Clinton Power Station.
-09, "Preparation and Scheduling of Operator Licensing Examinations.In the letter, you requested no initial operator licensing examinations be scheduled through 2021 at the Clinton Power Station. Previously in station letter U
-604281, dated May 23, 2016, you had requested initial license examination dates for January 2017, July 2018, and March 2019 at the Clinton Power Station.
In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.
In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety
Sincerely,
                                                                          /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV DISTRIBUTION:
See next page ADAMS Accession Number: ML16357A544 Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII                                RIII                          RIII NAME                RKWalton:jw                        ROrlikowski DATE                11/23/16                            12/20/16 OFFICIAL RECORD COPY


Docket No.
Letter to Mr. Bryan C. Hanson from Mr. Robert J. Orlikowski dated December 20, 2016
50-461 License No. NPF-6 2 cc:  Distribution via LISTSERV DISTRIBUTION
: See next page ADAMS Accession Number:  ML16357A544 Publicly Available Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII  NAME RKWalton: jw ROrlikowski DATE 11/23/16 1 2/20/16  OFFICIAL RECORD COPY Letter to Mr. Bryan C. Hanson from Mr. Robert J. Orlikowski dated December 20, 2016


==SUBJECT:==
==SUBJECT:==
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1 DISTRIBUTION:
- CLINTON POWER STATION, UNIT 1 DISTRIBUTION
Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado Colleen Schmidt}}
: Jeremy Bowen RidsNrrDorlLpl3
-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado
 
Colleen Schmidt}}

Revision as of 10:57, 30 October 2019

Ltr 12/20/2016 Scheduling of Initial Operator License Examinations - Clinton Power Station, Unit 1 (Rkw)
ML16357A544
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/20/2016
From: Robert Orlikowski
Operations Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
Download: ML16357A544 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1

Dear Mr. Hanson:

We have received your corporate letter RS-16-156, dated July 18, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested no initial operator licensing examinations be scheduled through 2021 at the Clinton Power Station. Previously in station letter U-604281, dated May 23, 2016, you had requested initial license examination dates for January 2017, July 2018, and March 2019 at the Clinton Power Station.

In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV

Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1

Dear Mr. Hanson:

We have received your corporate letter RS-16-156, dated July 18, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested no initial operator licensing examinations be scheduled through 2021 at the Clinton Power Station. Previously in station letter U-604281, dated May 23, 2016, you had requested initial license examination dates for January 2017, July 2018, and March 2019 at the Clinton Power Station.

In response to your most recent letter, we have not scheduled these examination dates and have canceled the previously requested initial license examination dates of October 2018 and October 2020.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV DISTRIBUTION:

See next page ADAMS Accession Number: ML16357A544 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 11/23/16 12/20/16 OFFICIAL RECORD COPY

Letter to Mr. Bryan C. Hanson from Mr. Robert J. Orlikowski dated December 20, 2016

SUBJECT:

SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS - CLINTON POWER STATION, UNIT 1 DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado Colleen Schmidt