|
---|
Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5252022-01-28028 January 2022 ES-301-2 Clinton Jan 22 ML22153A4902022-01-28028 January 2022 Scenarios ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM ML22157A0722022-01-28028 January 2022 Administered Scenarios ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A4982022-01-28028 January 2022 SRO Admin JPM ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4882022-01-28028 January 2022 RO Admin JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22157A1452022-01-28028 January 2022 Administered in Plant JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5142022-01-28028 January 2022 Inplant JPM ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22153A4782022-01-28028 January 2022 ES-301-3 ML22157A4142022-01-28028 January 2022 ES-401-9 Written Exam Review Wksht Clinton 22 ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A4942022-01-28028 January 2022 Sim JPM ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A4142022-01-28028 January 2022 ES-401-9 Written Exam Review Wksht Clinton 22 ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22157A1452022-01-28028 January 2022 Administered in Plant JPM ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22157A0702022-01-28028 January 2022 Administered RO Written Exam ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22153A5252022-01-28028 January 2022 ES-301-2 Clinton Jan 22 ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 2024-06-27
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Clinton Date of Examination:
3/29/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:
2021-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. 201001 A2.01 3.2 / JPM562 Control Rod Difficult to Withdraw / RD Pump Trip (Alternate Path)
A, EN, N, S 1
- b. 259001 A4.02 3.9 / JPM530 TDRFP B Startup (Alternate Path)
A, D, S 2
- c. 241000 A1.08 3.3 / JPM501 Main Turbine Control Valve Tests D, P, S 3
- d. 245000 A4.01 2.7 / JPM563 On-Line Testing Of Turning Gear Oil Pump 1TO04P N, S 4
- e. 223001 2.1.23 4.3 / JPM531 CNMT Pool Makeup from SP D, EN, L, P, S 5
- f. 262001 A4.04 3.6 / JPM432 Transferring 4160V Bus 1B1 from the Main to the Reserve Source (Alternate Path)
A, D, S 6
- g. 400000 A2.01 3.3 / JPM466 Shift CCW Pumps (Alternate Path)
A, D, S 8
- h. 290003 A4.01 3.2 / JPM565 Startup the Control Room Ventilation System (VC) in the High Radiation Mode (Alternate Path)
A, L, EN, N, S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. 264000 2.1.30 4.4 / JPM451 Reset 1C Diesel Generator After an Overspeed Trip D, E, EN, R 6
- j. 295019 AA1.02 3.3 / JPM428 Place IA Ring Header Automatic Isolation Valve into Service D, E, R 8
- k. 295016 AA1.07 4.2 / JPM533 RSP - Div 2 LPCI Operation D, E, EN, L, P, R 2
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Clinton Date of Examination:
3/29/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:
2021-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. 201001 A2.01 3.2 / JPM562 Control Rod Difficult to Withdraw / RD Pump Trip (Alternate Path)
A, EN, N, S 1
- b.
- c. 241000 A1.08 3.2 / JPM501 Main Turbine Control Valve Tests D, P, S 3
- d. 245000 A4.01 2.7 / JPM563 On-Line Testing Of Turning Gear Oil Pump 1TO04P N, S 4
- e. 223001 2.1.23 4.4 / JPM531 CNMT Pool Makeup from SP D, EN, L, P, S 5
- f. 262001 A4.04 3.7 / JPM432 Transferring 4160V Bus 1B1 from the Main to the Reserve Source (Alternate Path)
A, D, S 6
- g. 400000 A2.01 3.4 / JPM466 Shift CCW Pumps (Alternate Path)
A, D, S 8
- h. 290003 A4.01 3.2 / JPM565 Startup the Control Room Ventilation System (VC) in the High Radiation Mode (Alternate Path)
A, L, EN, N, S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. 264000 2.1.30 4.0 / JPM451 Reset 1C Diesel Generator After an Overspeed Trip D, E, EN, R 6
- j. 295019 AA1.02 3.1 / JPM428 Place IA Ring Header Automatic Isolation Valve into Service D, E, R 8
- k. 295016 AA1.07 4.3 / JPM533RSP - Div 2 LPCI Operation D, E, EN, L, P, R 2
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Clinton Date of Examination:
3/29/2021 Exam Level: RO SRO-I SRO-U Operating Test Number:
2021-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. 201001 A2.01 3.2 / JPM562 Control Rod Difficult to Withdraw / RD Pump Trip (Alternate Path)
A, EN, N, S 1
- b.
- c.
- d.
- e.
- f.
- g.
- h. 290003 A4.01 3.2 / JPM565 Startup the Control Room Ventilation System (VC) in the High Radiation Mode (Alternate Path)
A, L, EN, N, S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. 264000 2.1.30 4.0 / JPM451 Reset 1C Diesel Generator After an Overspeed Trip D, E, EN, R 6
- j. 295019 AA1.02 3.1 / JPM428 Place IA Ring Header Automatic Isolation Valve into Service D, E, R 8
- k. 295016 AA1.07 4.3 / JPM533RSP - Div 2 LPCI Operation D, E, EN, L, P, R 2
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1