MONTHYEARU-604818, October 1, 2023 Through September 30, 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-10-18018 October 2024 October 1, 2023 Through September 30, 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report U-604803, Submittal of 2023 Annual Radiological Environmental Operation Report2024-04-15015 April 2024 Submittal of 2023 Annual Radiological Environmental Operation Report U-604802, Submittal of 2023 Annual Radioactive Effluent Release Report2024-04-10010 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report U-604800, Annual Dose Report for 20232024-03-25025 March 2024 Annual Dose Report for 2023 U-604792, Post-Outage 120-Day Inservice Inspection (ISI) Summary Report2024-02-0101 February 2024 Post-Outage 120-Day Inservice Inspection (ISI) Summary Report U-604788, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 32023-12-12012 December 2023 Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation U-604760, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-26026 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report U-604761, Submittal of 2022 Annual Radiological Environmental Operation Report2023-04-26026 April 2023 Submittal of 2022 Annual Radiological Environmental Operation Report U-604759, Annual Dose Report for 20222023-04-0606 April 2023 Annual Dose Report for 2022 U-604754, Submittal of Integrated Initial License Training Examination Materials2023-04-0606 April 2023 Submittal of Integrated Initial License Training Examination Materials U-604740, Registration of Use of Casks to Store Spent Fuel2022-11-15015 November 2022 Registration of Use of Casks to Store Spent Fuel U-604738, Registration of Use of Casks to Store Spent Fuel2022-10-21021 October 2022 Registration of Use of Casks to Store Spent Fuel U-604728, October 1, 2021 Through September 30, 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-10-0707 October 2022 October 1, 2021 Through September 30, 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report U-604707, Submittal of 2021 Annual Radiological Environmental Operation Report2022-04-29029 April 2022 Submittal of 2021 Annual Radiological Environmental Operation Report U-604703, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 22022-04-14014 April 2022 Fourth Ten-Year Interval Inservice Testing Program Plan Revision 2 U-604697, Annual Dose Report for 20212022-04-0606 April 2022 Annual Dose Report for 2021 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 U-604687, Post-Outage 90-Day Inservice Inspection (Isi) Summary Report2022-01-21021 January 2022 Post-Outage 90-Day Inservice Inspection (Isi) Summary Report U-604686, Submittal of Cycle 21 Startup Test Report Summary2022-01-21021 January 2022 Submittal of Cycle 21 Startup Test Report Summary U-604666, October 1, 2020 Through September 30, 2021, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-11-0505 November 2021 October 1, 2020 Through September 30, 2021, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report U-604662, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 21, Revision 172021-10-23023 October 2021 Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 21, Revision 17 U-604633, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 12021-05-23023 May 2021 Fourth Ten-Year Interval Inservice Testing Program Plan Revision 1 U-604632, National Pollutant Discharge Elimination System (NPDES) Permit No, IL00369192021-05-12012 May 2021 National Pollutant Discharge Elimination System (NPDES) Permit No, IL0036919 U-604628, Submittal of 2020 Annual Radiological Environmental Operation Report2021-04-29029 April 2021 Submittal of 2020 Annual Radiological Environmental Operation Report U-604627, Annual Radioactive Effluent Release Report2021-04-21021 April 2021 Annual Radioactive Effluent Release Report U-604619, Annual Dose Report for 20202021-03-24024 March 2021 Annual Dose Report for 2020 U-604555, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 02020-07-13013 July 2020 Fourth Ten-Year Interval Inservice Testing Program Plan Revision 0 U-604712, Submittal of the Snubber Program Plan for the Fourth 10-Year Interval2020-06-24024 June 2020 Submittal of the Snubber Program Plan for the Fourth 10-Year Interval U-604544, National Pollutant Discharge Elimination System2020-05-14014 May 2020 National Pollutant Discharge Elimination System U-604545, Submittal of 2019 Annual Radiological Environmental Operation Report2020-04-28028 April 2020 Submittal of 2019 Annual Radiological Environmental Operation Report U-604543, Annual Dose Report for 20192020-04-13013 April 2020 Annual Dose Report for 2019 U-604541, Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition2020-04-0909 April 2020 Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition U-604527, Post Outage 90-Day Inservice Inspection (ISI) Summary Report2020-01-15015 January 2020 Post Outage 90-Day Inservice Inspection (ISI) Summary Report U-604525, Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition2019-12-30030 December 2019 Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition U-604510, Submittal of the Core Operating Limits Report Cycle 20; Revision 152019-10-13013 October 2019 Submittal of the Core Operating Limits Report Cycle 20; Revision 15 U-604485, October 1, 2017 Through September 30, 2018, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-04-25025 April 2019 October 1, 2017 Through September 30, 2018, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report U-604483, Annual Dose Report for 20182019-04-24024 April 2019 Annual Dose Report for 2018 U-604484, October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-04-24024 April 2019 October 1, 2016 to September 30, 2017, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report U-604478, Notification of Readiness for NRC 95001 Inspection (EA-18-104)2019-04-17017 April 2019 Notification of Readiness for NRC 95001 Inspection (EA-18-104) U-604454, Transmittal of Revision 20 to Technical Specification Bases2018-12-31031 December 2018 Transmittal of Revision 20 to Technical Specification Bases U-604458, Submittal of the Core Operating Limits Report, Cycle 19, Revision 142018-12-18018 December 2018 Submittal of the Core Operating Limits Report, Cycle 19, Revision 14 U-604457, Third Ten-Year Interval Inservice Testing Program Plan Revision 92018-11-21021 November 2018 Third Ten-Year Interval Inservice Testing Program Plan Revision 9 U-604453, Regulatory Conference Information2018-11-19019 November 2018 Regulatory Conference Information U-604451, Response to NRC Inspection Report and Preliminary White Finding2018-10-19019 October 2018 Response to NRC Inspection Report and Preliminary White Finding U-604446, Registration of Use of Casks to Store Spent Fuel2018-10-15015 October 2018 Registration of Use of Casks to Store Spent Fuel U-604444, Registration of Use of Casks to Store Spent Fuel2018-10-0909 October 2018 Registration of Use of Casks to Store Spent Fuel U-604438, Post Outage 90-Day Lnservice Inspection (ISI) Summary Report2018-08-17017 August 2018 Post Outage 90-Day Lnservice Inspection (ISI) Summary Report U-604436, Notification of Readiness for NRC 95001 Inspection (EA-17-203)2018-07-13013 July 2018 Notification of Readiness for NRC 95001 Inspection (EA-17-203) U-604424, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 19, Revision 132018-05-15015 May 2018 Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 19, Revision 13 2024-04-15
[Table view] Category:License-Operator
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A4902022-01-28028 January 2022 Scenarios ML22157A0722022-01-28028 January 2022 Administered Scenarios ML22153A5142022-01-28028 January 2022 Inplant JPM ML22153A5102022-01-28028 January 2022 ES-401-6 Clinton 2022 ML22153A4882022-01-28028 January 2022 RO Admin JPM ML22153A4942022-01-28028 January 2022 Sim JPM ML22157A0762022-01-28028 January 2022 Administered Sim JPM ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A4102022-01-28028 January 2022 ES-401-4 Record of Rejected KAs Jan 22 Clinton Written Exam ML22153A5292022-01-28028 January 2022 ES-D-1 Clinton Jan 2022 ML22157A3952022-01-28028 January 2022 ES-301-7 Op Test Review Wksht Clinton 22 ML22153A5282022-01-28028 January 2022 ES-401-3 Clinton Jan 2022 ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A1192022-01-28028 January 2022 Administered SRO Written Exam ML22157A0862022-01-28028 January 2022 Administered SRO Admin JPM ML22157A1452022-01-28028 January 2022 Administered in Plant JPM U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5072022-01-28028 January 2022 ILT 20-1 NRC RO and SRO Submittal ML22153A5272022-01-28028 January 2022 ES-401-1 Clinton Jan 2022 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A5302022-01-28028 January 2022 ES-301-1 Clinton Jan 22 ML22157A1982022-01-28028 January 2022 Administered RO Admin JPM ML22153A4982022-01-28028 January 2022 SRO Admin JPM ML22157A4162022-01-28028 January 2022 Outline Review Comments Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 2024-06-27
[Table view] Category:Other HQ and Regional Correspondence
[Table view] |
Text
Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604281 May 23', 2*016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Clinton Power Station Preparation and Scheduling of Operator Licensing Examinations
References:
Letter from Mark M. Newcomer (Clinton Power Station) to U.S. NRC (NRC Document Control Desk, Washington, DC), "Clinton Power Station Preparation and Scheduling of Operator Licensing Examinations," dated October 21, 2015, CPS LTR U-604246.
Letter from Hironori Peterson (U.S. NRC Region 111) to Bryan Hanson (Exelon Generation Company), "Scheduling of Initial Operator License Examinations:
Clinton Power Station, Unit 1," dated November 27, 2015, ML15336A970.
This letter provides an update to the referenced letters for the proposed schedule of operator licensing examinations, an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019 and the number, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. The information is provided on the attached NRC Form 536.
There are no regulatory commitments contained in this letter.
If you have any questions please contact Mr. Thomas Dean, Site Training Director, at (217) 937-4000.
Respectfully, Theodore R. Stoner Site Vice President Clinton Power Station Attachment DRA/cas cc: Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Project Manager, NRR - Clinton Power Station NRC Regional Administrator, Region Ill
NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 (01-2015)
,,.o'1>~-~,., Estimated burden per response to comply with this voluntary information collection request: 1
., '!. hour. This information collection is used to plan budgets and resources for operator I ~a examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information
"~ : OPERATOR LICENSING Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC
\+. ,;
" ........ ~
EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required lo respond lo, the information collection.
FACILITY NRCREGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2016 CY2017 CY2018 CY2019 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 I 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 0 3 10 5 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 8 8 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 01/30/2017 07/09/2018 03/11/2019 ALTERNATE DATE NIA 02/06/2017 07/16/2018 03/04/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 18 0 0 0 CANDIDATES NRC FORM 536 (01-2015)
Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604281 May 23', 2*016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Clinton Power Station Preparation and Scheduling of Operator Licensing Examinations
References:
Letter from Mark M. Newcomer (Clinton Power Station) to U.S. NRC (NRC Document Control Desk, Washington, DC), "Clinton Power Station Preparation and Scheduling of Operator Licensing Examinations," dated October 21, 2015, CPS LTR U-604246.
Letter from Hironori Peterson (U.S. NRC Region 111) to Bryan Hanson (Exelon Generation Company), "Scheduling of Initial Operator License Examinations:
Clinton Power Station, Unit 1," dated November 27, 2015, ML15336A970.
This letter provides an update to the referenced letters for the proposed schedule of operator licensing examinations, an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019 and the number, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. The information is provided on the attached NRC Form 536.
There are no regulatory commitments contained in this letter.
If you have any questions please contact Mr. Thomas Dean, Site Training Director, at (217) 937-4000.
Respectfully, Theodore R. Stoner Site Vice President Clinton Power Station Attachment DRA/cas cc: Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station NRC Project Manager, NRR - Clinton Power Station NRC Regional Administrator, Region Ill
NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 (01-2015)
,,.o'1>~-~,., Estimated burden per response to comply with this voluntary information collection request: 1
., '!. hour. This information collection is used to plan budgets and resources for operator I ~a examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information
"~ : OPERATOR LICENSING Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC
\+. ,;
" ........ ~
EXAMINATION DATA 20555-0001, or by internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required lo respond lo, the information collection.
FACILITY NRCREGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2016 CY2017 CY2018 CY2019 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 I 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 0 3 10 5 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 8 8 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 01/30/2017 07/09/2018 03/11/2019 ALTERNATE DATE NIA 02/06/2017 07/16/2018 03/04/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 18 0 0 0 CANDIDATES NRC FORM 536 (01-2015)