{{#Wiki_filter:I ENRC+ORM 366 , fl.77)U.S.NUCLEAR REGULATORY COMMISSION 8 s T I~e 7 8 NSEE EVENT REPORT (CAR 1230){PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 mpp-0>Q4~QS 14 15 I.ICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58.CONTROL BLOCK: N Y LICENSEE CODE 8 08 pl 7 Qg REPORT~Q 7 0 60 61 DOCKET NUMBER 68 69 FVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO Durin i in s stem ins ections EVENT DATE 74 75 REPORT DATE 80 ,~s 3 several i e su orts we in accordance
{{#Wiki_filter:I ENRC +ORM           366                                                                                                           U. S. NUCLEAR REGULATORY COMMISSION fl.77)
;~s 4 with desi n re uirem n s-,:~DS ,:.~D6 ,'~O: foDs]7 8 9 BD 7 8 SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE g~BB Q11 B QE2~COPS 5 0 P 0 R T 04~BOER~B QS 9 10 11 12 13 18 19 20 SEOUEN TIAL OCCURRENCE REPORT REVISION LERIRO EVENT YEAR REPORT NO.CODE TYPE NO, QTT REPoRT~79~~01 5~M.~01~T~~0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q2 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER LJtIPES~BGS
NSEE EVENT REPORT
~BOER LSIP>>0 0 0 0~YP23~NQ24~AORS.B I 3 0 Q24 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Lack of documented a rovals for field chan es and nonconforma c s durin ori inal lant construction.
  ,
Su orts hav or an engineerin evaluation erformed to establish acce tabilit 8 9 FACILITY STATUS%POWER OTHER STATUS Q I S G 28 P P P 29 9 11 12 LOSS OF OR DAMAGE TO FACILITY Q43 TYPE DESCRIPTION Z Q4.NA 9 ID PUBLICITY ISSUED DESCRIPTION
(CAR 1230)
~~NQ44 NA 9 10 7 8 7 8 NAME OF PREPARER J.C.Hutton CZ3 MO~O ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY 6~Z Q33~ZQ34 NA 7 8 9 10 44 PER SONNE L E XPOSUR ES NUMBER TYPE DESCRIPTION Q39 2~00 0 OET~2Q33 NA 7 8 9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 I0000 JQ43 NA 7 8 80 80 80 80 80 NRC USE ONLY BD~'8 69 80 Es PHoNE.716-546-2700,Ext 25p2,'S08100$
                      .CONTROL BLOCK:                                                                    {PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 8
EP+METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32~Q31 IE Bulletin 79-14 Xns ections 45 46 LOCATION OF RELEASE Q 45
N      Y LICENSEE CODE              14 mpp15                    I.ICENSE NUMBER 0>
26       LICENSE TYPE     30 Q4~57 CAT 58 QS T
I~e 7
s 8
REPORT
                                        ~Q 60         61             DOCKET NUMBER                 68 7  0 69       EVENT DATE            74 8
75 08        pl REPORT DATE 7
80 Qg FVENT DESCRIPTION AND PROBABLE CONSEQUENCES                             QIO Durin                 i in s           stem ins ections
    ,~s     3             several               i e su             orts     we                                                                     in accordance
    ;~s     4             with desi               n   re uirem           n s
,:~DS
,:.~D6
    ,'~O
:   foDs]
7       8 9                                                                                                                                                                               BD SYSTEM           CAUSE         CAUSE                                                         COMP.         VALVE CODE             CODE       SUBCODE                   COMPONENT CODE                   SUBCODE         SUBCODE g                           ~BB           Q11       B     QE2
                                                                              ~COPS               5 0         P 0       R T 04           ~BOER         ~B     QS 7        8                        9         10         11           12               13                             18         19             20 SEOUEN TIAL                           OCCURRENCE         REPORT                     REVISION QTT LERIRO REPoRT ACTION FUTURE EVENT YEAR
                                            ~79 21        22 EFFECT
                                                                ~23 SHUTDOWN
                                                                              ~01 24 REPORT NO.
5 26
                                                                                                        ~M 27
                                                                                                                  .
                                                                                                                        ~01 28 ATTACHMENT CODE 29 NPRDP TYPE
                                                                                                                                              ~T 30
                                                                                                                                                            ~
31 PRIME COMP.
NO,
                                                                                                                                                                        ~0 32 COMPONENT TAKEN ACTION                 ON PLANT           METHOD                   HOURS     Q2       SUBMITTED       FORM SUB.         SUPPLIER           MANUFACTURER LJtIPES~BGS                   ~BOER             LSIP>>               0   0 0         0       ~YP23         ~NQ24             ~AORS       . B     I   3               0   Q24 33           34               35                 36           37                     40     41             42               43             44                           47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o             Lack         of     documented a                 rovals for field chan es and nonconforma c                                                       s durin ori inal lant construction.                                                         Su orts hav or an engineerin evaluation erformed to establish acce tabilit
                                    ~O 8   9                                                                                                                                                                             80 FACILITY STATUS               % POWER                     OTHER STATUS     Q         METHOD OF DISCOVERY                              DISCOVERY DESCRIPTION Q32 CZ3  I S MO  G 28           P   P     P   29                                         ~Q31 45          46 IE    Bulletin            79-14 Xns ections 80 ACTIVITY CONTENT RELEASED OF RELEASE                         AMOUNT OF ACTIVITY                                                       LOCATION OF RELEASE        Q 6     ~Z       Q33   ~ZQ34                   NA 7       8   9               10                                                     44             45                                                                                    80 PER SONNE L E XPOSUR ES NUMBER               TYPE       DESCRIPTION Q39 2     ~00               0   OET   ~2Q33         NA 7         8   9                 11       12         13                                                                                                                                     80 PERSONNEL INJURIES NUMBER               DESCRIPTIONQ41 7        8 I0000 9                11 JQ43 12 NA 80 LOSS OF OR DAMAGE TO FACILITY TYPE          DESCRIPTION                  Q43 Z Q4.                                NA 7         8   9            ID                                                                                                                                                              BD ISSUED
                  ~NQ44 PUBLICITY DESCRIPTION      ~          NA NRC USE ONLY
                                                                                                                                                                                                      ~
7        8   9            10                                                                                                                      69                                     80   Es
                                                                                                                                                                                                        '8 NAME OF PREPARER J.C. Hutton                                                        PHoNE.716-546-2700,Ext EP+
25p2,'S08100$


Attachment LER 79-015 Au ust 1 1979 During the piping sytem inspections required by lE Bulletin No.79-14, 10 pipe supports were determined to be, in nonconformance
Attachment LER 79-015 Au ust 1 1979 During the piping sytem inspections required by lE Bulletin No. 79-14, 10 pipe supports were determined to be, in nonconformance .
.with design requirements.
with design requirements. These supports were located on the containment spray (CS), residual heat removal (RHR), and service water {Sf) systems.
These supports were located on the containment spray (CS), residual heat removal (RHR), and service water{Sf)systems.The following is a listing of the supports and nonconfozmances (NCR's G-79-88 through G-79-93 and G-79.-95 through G-79-97): CS-53, one less support installed on lower containment spray ring than shown on drawing CS-235 pipe clamp not installed on lower containment spray zing at 235 location as shown on drawing CS-295 pipe clamp not installed on lower containment spray zing at 295 location as shown on drawing CS-12 RH-16 K7-3 SW-20 SM-22 K'I-23 SH-29 U-bolt not installed as zequired by drawing pipe clamp not installed as required by drawing 1 pipe support not installed at location required by drawing six U-bolts not installed as required by drawing four U-bolts not installed as required by drawing pipe clamp not installed as required by drawing pipe support not installed at location required by dramng Supports CS-235, CS-295, CS-12, IN-16, M-3,&7-22, SH-23, and SW-29 have been reworked in accordance with the drawing requirements.
The following is a listing of the supports and nonconfozmances (NCR's G-79-88 through G-79-93 and G-79.-95 through G-79-97):
An engineering evaluation of the nonconformance identified on CS-53 determined that the existing installation was adequate to assure performance of its intended function.Rein-spection of support SH-20 showed that the nonconformance had been incorrectly reported;and it was in fact installed correctly.
CS-53,     one less support installed on lower containment spray ring than shown on drawing CS-235     pipe clamp not installed on lower containment spray zing at 235 location as shown on drawing CS-295     pipe clamp not installed on lower containment spray zing at 295 location as shown on drawing CS-12     U-bolt not installed as zequired by drawing RH-16      pipe clamp not installed as required by drawing 1
K7-3      pipe support not installed at location required by drawing SW-20      six U-bolts not installed as required by drawing SM-22      four U-bolts not installed as required by drawing K'I-23      pipe clamp not installed as required by drawing SH-29      pipe support not installed at location required by dramng Supports CS-235, CS-295, CS-12, IN-16, M-3, &7-22, SH-23, and SW-29 have been reworked in accordance with the drawing requirements. An engineering evaluation of the nonconformance identified   on CS-53 determined   that the existing installation was adequate to assure performance of its intended function. Rein-spection of support SH-20 showed that the nonconformance had been incorrectly reported; and it was in fact installed correctly.
The corrective actions described above have been completed.
The corrective actions described above have been completed.
Xt is our conclusion that the nonconformances are a result of a lack of documented approvals for field changes and nonconformances during original plant construction.
Xt is our conclusion that the nonconformances are a result of a lack of documented approvals for field changes and nonconformances during original plant construction. Additional inspections as required by lE Bulletin No. 79-14 are being performed as described in our response dated August 1, 1979.
Additional inspections as required by lE Bulletin No.79-14 are being performed as described in our response dated August 1, 1979.
 
e I s<~~1'I}}
e I
s < ~ ~ 1
'I}}

Revision as of 19:07, 29 October 2019

LER 79-015/01T-0 on 790724:discovered Pipe Supports Not Meeting Design Specs of IE Bulletin 79-14.Caused by Lack of Documented Approvals for Field Changes & Nonconformance During Plant Const.Supports Reworked
ML17261A134
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/01/1979
From: Hutton J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A751 List:
References
LER-79-015-01T, LER-79-15-1T, NUDOCS 7908100475
Download: ML17261A134 (4)


Text

I ENRC +ORM 366 U. S. NUCLEAR REGULATORY COMMISSION fl.77)

NSEE EVENT REPORT

,

(CAR 1230)

.CONTROL BLOCK: {PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 8

N Y LICENSEE CODE 14 mpp15 I.ICENSE NUMBER 0>

26 LICENSE TYPE 30 Q4~57 CAT 58 QS T

I~e 7

s 8

REPORT

~Q 60 61 DOCKET NUMBER 68 7 0 69 EVENT DATE 74 8

75 08 pl REPORT DATE 7

80 Qg FVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO Durin i in s stem ins ections

,~s 3 several i e su orts we in accordance

~s 4 with desi n re uirem n s

,:~DS

,:.~D6

,'~O

foDs]

7 8 9 BD SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE g ~BB Q11 B QE2

~COPS 5 0 P 0 R T 04 ~BOER ~B QS 7 8 9 10 11 12 13 18 19 20 SEOUEN TIAL OCCURRENCE REPORT REVISION QTT LERIRO REPoRT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

~23 SHUTDOWN

~01 24 REPORT NO.

5 26

~M 27

.

~01 28 ATTACHMENT CODE 29 NPRDP TYPE

~T 30

~

31 PRIME COMP.

NO,

~0 32 COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q2 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER LJtIPES~BGS ~BOER LSIP>> 0 0 0 0 ~YP23 ~NQ24 ~AORS . B I 3 0 Q24 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o Lack of documented a rovals for field chan es and nonconforma c s durin ori inal lant construction. Su orts hav or an engineerin evaluation erformed to establish acce tabilit

~O 8 9 80 FACILITY STATUS  % POWER OTHER STATUS Q METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32 CZ3 I S MO G 28 P P P 29 ~Q31 45 46 IE Bulletin 79-14 Xns ections 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Q 6 ~Z Q33 ~ZQ34 NA 7 8 9 10 44 45 80 PER SONNE L E XPOSUR ES NUMBER TYPE DESCRIPTION Q39 2 ~00 0 OET ~2Q33 NA 7 8 9 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 7 8 I0000 9 11 JQ43 12 NA 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION Q43 Z Q4. NA 7 8 9 ID BD ISSUED

~NQ44 PUBLICITY DESCRIPTION ~ NA NRC USE ONLY

~

7 8 9 10 69 80 Es

'8 NAME OF PREPARER J.C. Hutton PHoNE.716-546-2700,Ext EP+

25p2,'S08100$

Attachment LER 79-015 Au ust 1 1979 During the piping sytem inspections required by lE Bulletin No. 79-14, 10 pipe supports were determined to be, in nonconformance .

with design requirements. These supports were located on the containment spray (CS), residual heat removal (RHR), and service water {Sf) systems.

The following is a listing of the supports and nonconfozmances (NCR's G-79-88 through G-79-93 and G-79.-95 through G-79-97):

CS-53, one less support installed on lower containment spray ring than shown on drawing CS-235 pipe clamp not installed on lower containment spray zing at 235 location as shown on drawing CS-295 pipe clamp not installed on lower containment spray zing at 295 location as shown on drawing CS-12 U-bolt not installed as zequired by drawing RH-16 pipe clamp not installed as required by drawing 1

K7-3 pipe support not installed at location required by drawing SW-20 six U-bolts not installed as required by drawing SM-22 four U-bolts not installed as required by drawing K'I-23 pipe clamp not installed as required by drawing SH-29 pipe support not installed at location required by dramng Supports CS-235, CS-295, CS-12, IN-16, M-3, &7-22, SH-23, and SW-29 have been reworked in accordance with the drawing requirements. An engineering evaluation of the nonconformance identified on CS-53 determined that the existing installation was adequate to assure performance of its intended function. Rein-spection of support SH-20 showed that the nonconformance had been incorrectly reported; and it was in fact installed correctly.

The corrective actions described above have been completed.

Xt is our conclusion that the nonconformances are a result of a lack of documented approvals for field changes and nonconformances during original plant construction. Additional inspections as required by lE Bulletin No. 79-14 are being performed as described in our response dated August 1, 1979.