{{#Wiki_filter:ACCEI.ERATED DOCUMENT DISTRIBUTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBRF'9303300040 DOC.DATE: 93/03/22 NOTARIZED:
{{#Wiki_filter:ACCEI.ERATED DOCUMENT                             DISTRIBUTION SYSTEM REGULATORY INFORMATION         DISTRIBUTION SYSTEM (RIDS)
NO DOCKET CIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 TH.NAME AUTHOR AFFILIATION ,ARRISH,J.V.
ACCESSION NBRF'9303300040             DOC.DATE:     93/03/22 NOTARIZED: NO             DOCKET CIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public             Powe 05000397 TH.NAME             AUTHOR AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
  ,ARRISH,J.V.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Responds to NRC 921203 ltr re violations noted in insp of facility training rept 50-397/92-27.C/As:requalification instructors,mgt 6 Operations Liaison have participated in training&evaluation of initial license candidates.
Responds       to   NRC 921203     ltr re violations noted in insp of facility training       rept 50-397/92-27.C/As:requalification instructors,mgt 6 Operations Liaison have participated in training & evaluation of initial license candidates.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE C FILE 02 ILE 01 EXTERNAL EGGG/BRYCE i J~H~NSIC;COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAUiD NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1.1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE01D           COPIES RECEIVED:LTR         ENCL     SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Rfchland, Wasbfngton 993524968~(509)372-5000 March 22, 1993 G02-93-067 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk'ashington, D.C.20555 Gentlemen:
TITLE: General (50 Dkt)-Insp Rept/Notice of                 Violation Response NOTES:
RECIPIENT            ;COPIES              RECIPIENT         COPIES ID CODE/NAME            LTTR ENCL          ID CODE/NAME       LTTR ENCL PD5 PD                       1      1      CLIFFORD,J            1      1 INTERNAL: ACRS                           2      2      AEOD/DEIB              1      1 AEOD/DSP/TPAB               1      1      AEOD/TTC              1      1 DEDRO                       1      1      NRR/DORS/OEAB          1      1 NRR/DRCH/HHFBPT             1      1      NRR/DRIL/RPEB          1      1 NRR/PMAS/ILPB1        1     1' NRR/DRSS/PEPB                1      1 NRR/PMAS/ILPB2                1      1      NUDOCS-ABSTRACT               1 OE                            1      1      OGC/HDS1               1     1 C FILE          02        1     1     RES MORISSEAUiD        1 . 1 ILE    01        1     1 EXTERNAL    EGGG/BRYCE    iJ ~ H~        1     1     NRC PDR                1     1 NSIC                          1     1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                 23 ENCL   23
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Rfchland, Wasbfngton 993524968 ~ (509) 372-5000 March 22, 1993 G02-93-067 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk D.C. 20555           'ashington, Gentlemen:


==Subject:==
==Subject:==
WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION OF FACILITY TRAINING (REPORT NO.50-397/92-27)
WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27) ACTION STATUS
ACTION STATUS  


==References:==
==References:==
: 1)    Letter G02-92-255 dated November 19, 1992, J,V. Parrish (SS) to U.S.
Nuclear Regulatory Commission, "WNP-2 Operating License NPF-21 NRC Inspection of Facility Training (Report No. 50-397/92-27)"
: 2)    Letter dated December 3, 1992, L.F. Miller (NRC) to A.L. Oxsen (SS),
                          "WNP-2 Response to NRC Inspection Report No. 50-397/92-27" The subject inspection was an evaluation of various aspects of facility training. Three weaknesses were identified in this inspection which required a response detailing the planned actions to be taken to address them. The WNP-2 response to these issues was forwarded by my letter of November 19, 1992 (Reference 1),
The committed actions are in progress and we have completed evaluation of all of the issues addressed in the inspection report weaknesses.            This letter is intended to provide an interim status update to apprise you of our progress in this area of extreme importance to the continued improvement of the Supply System.
Commitment Modify the operations liaison responsibility instruction (LTI 7.4) to formally define the necessary qualification level by March 1, 1993, and qualify the incumb'ent accordingly by July 1, 1993.
<<Stat a:          The enclosed department instruction defining the responsibilities of the Operations Liaison (LTI 7.4) has been revised to formally define the necessary qualification level for this position. Actions to qualify the incumbent accordingly are in progress. This training is planned to be complete by the original date specified, July 1, 1993.
9303300040 930322 PDR 6
ADQCK 05000397                                                                  Qpo PDR                                                              I
                                                                                                        )


1)Letter G02-92-255 dated November 19, 1992, J,V.Parrish (SS)to U.S.Nuclear Regulatory Commission,"WNP-2 Operating License NPF-21 NRC Inspection of Facility Training (Report No.50-397/92-27)" 2)Letter dated December 3, 1992, L.F.Miller (NRC)to A.L.Oxsen (SS),"WNP-2 Response to NRC Inspection Report No.50-397/92-27" The subject inspection was an evaluation of various aspects of facility training.Three weaknesses were identified in this inspection which required a response detailing the planned actions to be taken to address them.The WNP-2 response to these issues was forwarded by my letter of November 19, 1992 (Reference 1), The committed actions are in progress and we have completed evaluation of all of the issues addressed in the inspection report weaknesses.
K Page Two NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27I ACTION STATUS t
This letter is intended to provide an interim status update to apprise you of our progress in this area of extreme importance to the continued improvement of the Supply System.Commitment Modify the operations liaison responsibility instruction (LTI 7.4)to formally define the necessary qualification level by March 1, 1993, and qualify the incumb'ent accordingly by July 1, 1993.<<Stat a: Qpo I)9303300040 930322 PDR ADQCK 05000397 6 PDR The enclosed department instruction defining the responsibilities of the Operations Liaison (LTI 7.4)has been revised to formally define the necessary qualification level for this position.Actions to qualify the incumbent accordingly are in progress.This training is planned to be complete by the original date specified, July 1, 1993.
Commitment: Incorporate a formal means of assuring an ongoing sharing of skills and knowledge between the requalification and initial license training programs within our applicable department instructions by March 1, 1993.
K Page Two NRC INSPECTION OF FACILITY TRAINING (REPORT NO.50-397/92-27I ACTION STATUS t Commitment:
tatus:     We have chosen to not implement this commitment as stated. Instead, our efforts to ensure the sharing of skills from the requalification training area to the initial license area have taken the form of:
Incorporate a formal means of assuring an ongoing sharing of skills and knowledge between the requalification and initial license training programs within our applicable department instructions by March 1, 1993.tatus: We have chosen to not implement this commitment as stated.Instead, our efforts to ensure the sharing of skills from the requalification training area to the initial license area have taken the form of: Initial license instructors attend requalification train-the-trainer sessions.Requalification instructors, management, and the Operations Liaison have participated in the training and evaluation of the initial license candidates to a significant degree.Further review indicates that formalizing this sharing of instructional resource will add little benefit if organizational constraints preclude effective implementation.
Initial license instructors attend requalification train-the-trainer sessions.
Therefore, we are evaluating our organizational structure and intend to implement appropriate changes to accomplish this objective by June 1, 1993.f i R i i Ip<<h h ff i*<<l'id<<~training by July 1, 1993.Status: The enclosed letter defines an assessment process which will commence in April, 1993.The results of this process will be used to enhance industry events training which should create effective responsiveness to industry lessons learned and improve overall performance at WNP-2.Additional actions are being taken beyond those previously committed to provide a better focus on injecting lessons learned into our training programs.The training staff has been informed through the enclosed letter of their critical role in establishing a culture that believes"it can happen here" with an urgency to prevent recurrence.
Requalification instructors, management, and the Operations Liaison have participated in the training and evaluation of the initial license candidates to a significant degree.
We intend to enhance the visibility of related industry experience in our training materials.
Further review indicates that formalizing this sharing of instructional resource will add little benefit if organizational constraints preclude effective implementation. Therefore, we are evaluating our organizational structure and intend to implement appropriate changes to accomplish this objective by June 1, 1993.
In addition, we plan to conduct instructor skills training on the INPO"case study approach" as an enhancement technique for effective industry events training.All actions are scheduled for completion by the original schedule of July 1, 1993.  
f       i   R   i       i     Ip training by July 1, 1993.
'I Page Three NRC INSPECTION OF FACILITY TRAINING (REPORT NO.50-397/92-27I ACTION STATUS A recent example, the Supply System response to the recent issue concerning BWR reactor vessel level anomalies during transients, demonstrates our training process for industry feedback.Also included in the following are the actions taken based upon a review of our plant experience with this issue.Requalification cycle 92-6 contained classroom training covering rapid depressurization and notching indications.
                                            <<h               h     ff   i* << l'id<<~
BWROG source documents transmitted to all licensed operators via required reading.Operations night orders required the Shift Managers to train their crews on this information.
Status:     The enclosed letter defines an assessment process which will commence in April, 1993. The results of this process willbe used to enhance industry events training which should create effective responsiveness to industry lessons learned and improve overall performance at WNP-2.
A Maintenance and Operations bulletin was prepared and distributed detailing how this industry experience could impact WNP-2.Requalification cycle 93-1, which concluded on 2/19/93, contained classroom training and dynamic simulator scenarios containing rapid depressurization indications.
Additional actions are being taken beyond those previously committed to provide a better focus on injecting lessons learned into our training programs.               The training staff has been informed through the     enclosed letter of their critical   role in establishing a culture that believes "it can happen here" with an urgency to prevent recurrence.       We intend to enhance the visibility of related industry experience in our training materials. In addition, we plan to conduct instructor skills training on the INPO "case study approach" as an enhancement technique for effective industry events training. All actions are scheduled for completion by the original schedule of July 1, 1993.
This also included viewing a GE video tape on RPV level determination following rapid depressurization.
 
The initial licensed operator class, examined the week of 3/8/93, has had training on depressurization and notching indications included in EOP training.The recent WNP-2 Problem Evaluation Request concerning observed notching was distributed as required reading prior to assuming licensed duties.Formal training on this event was conducted during the last week of February, 1993, for all licensed personnel.
      'I Page Three NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27I ACTION STATUS A recent example, the Supply System response to the recent issue concerning BWR reactor vessel level anomalies during transients, demonstrates our training process for industry feedback. Also included in the following are the actions taken based upon a review of our plant experience with this issue.
Requalification cycle 92-6 contained classroom training covering rapid depressurization and notching indications.
BWROG source documents transmitted to all licensed operators via required reading. Operations night orders required the Shift Managers to train their crews on this information.
A Maintenance and Operations bulletin was prepared and distributed detailing how this industry experience could impact WNP-2.
Requalification cycle 93-1, which concluded on 2/19/93, contained classroom training and dynamic simulator scenarios containing rapid depressurization indications. This also included viewing a GE video tape on RPV level determination following rapid depressurization.
The initial licensed operator class, examined the week of 3/8/93, has had training on depressurization and notching indications included in EOP training.
The recent WNP-2 Problem Evaluation Request concerning observed notching was distributed as required reading prior to assuming licensed duties.
Formal training on this event was conducted during the last week of February, 1993, for all licensed personnel.
A follow-up quiz is planned for the subsequent requalification cycle.
A follow-up quiz is planned for the subsequent requalification cycle.
e Page Four NRC INSPECTION OF FACILITY TRAINING (REPORT NO.50-397/92-27)
 
ACTION STATUS If you have any questions or require any additional information, please contact Mr.Myron Baird, Manager, Licensed Operator Requalification Training, at (509)377-8266./Sincerely, J+rvr~V Parrish (Mail Drop 1023)Assistant Managing Director, Operations DRK/bk cc: JB Martin-NRC RV NS Reynolds-Winston&Strawn JW Clifford-NRC DL Williams-BPA/399 NRC Site Inspector-901A}}
e Page Four NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27) ACTION STATUS If you   have any questions or require any additional information,   please contact Mr. Myron Baird, Manager, Licensed Operator Requalification Training, at (509) 377-8266.
                    /
Sincerely, J   +rvr~
V Parrish (Mail Drop 1023)
Assistant Managing Director, Operations DRK/bk cc:     JB Martin - NRC RV NS Reynolds - Winston   & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Site Inspector - 901A}}

Latest revision as of 13:50, 29 October 2019

Responds to NRC 921203 Ltr Re Weaknesses Noted in Insp of Facility Training Rept 50-397/92-27.C/As:requalification Instructors,Mgt & Operations Liaison Have Participated in Training & Evaluation of Initial License Candidates
ML17289B260
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/22/1993
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17289B261 List:
References
GO2-93-067, GO2-93-67, NUDOCS 9303300040
Download: ML17289B260 (5)


Text

ACCEI.ERATED DOCUMENT DISTRIBUTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBRF'9303300040 DOC.DATE: 93/03/22 NOTARIZED: NO DOCKET CIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 TH.NAME AUTHOR AFFILIATION

,ARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 921203 ltr re violations noted in insp of facility training rept 50-397/92-27.C/As:requalification instructors,mgt 6 Operations Liaison have participated in training & evaluation of initial license candidates.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ;COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 2 2 AEOD/DEIB 1 1 AEOD/DSP/TPAB 1 1 AEOD/TTC 1 1 DEDRO 1 1 NRR/DORS/OEAB 1 1 NRR/DRCH/HHFBPT 1 1 NRR/DRIL/RPEB 1 1 NRR/PMAS/ILPB1 1 1' NRR/DRSS/PEPB 1 1 NRR/PMAS/ILPB2 1 1 NUDOCS-ABSTRACT 1 OE 1 1 OGC/HDS1 1 1 C FILE 02 1 1 RES MORISSEAUiD 1 . 1 ILE 01 1 1 EXTERNAL EGGG/BRYCE iJ ~ H~ 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Rfchland, Wasbfngton 993524968 ~ (509) 372-5000 March 22, 1993 G02-93-067 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk D.C. 20555 'ashington, Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27) ACTION STATUS

References:

1) Letter G02-92-255 dated November 19, 1992, J,V. Parrish (SS) to U.S.

Nuclear Regulatory Commission, "WNP-2 Operating License NPF-21 NRC Inspection of Facility Training (Report No. 50-397/92-27)"

2) Letter dated December 3, 1992, L.F. Miller (NRC) to A.L. Oxsen (SS),

"WNP-2 Response to NRC Inspection Report No. 50-397/92-27" The subject inspection was an evaluation of various aspects of facility training. Three weaknesses were identified in this inspection which required a response detailing the planned actions to be taken to address them. The WNP-2 response to these issues was forwarded by my letter of November 19, 1992 (Reference 1),

The committed actions are in progress and we have completed evaluation of all of the issues addressed in the inspection report weaknesses. This letter is intended to provide an interim status update to apprise you of our progress in this area of extreme importance to the continued improvement of the Supply System.

Commitment Modify the operations liaison responsibility instruction (LTI 7.4) to formally define the necessary qualification level by March 1, 1993, and qualify the incumb'ent accordingly by July 1, 1993.

<<Stat a: The enclosed department instruction defining the responsibilities of the Operations Liaison (LTI 7.4) has been revised to formally define the necessary qualification level for this position. Actions to qualify the incumbent accordingly are in progress. This training is planned to be complete by the original date specified, July 1, 1993.

9303300040 930322 PDR 6

ADQCK 05000397 Qpo PDR I

)

K Page Two NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27I ACTION STATUS t

Commitment: Incorporate a formal means of assuring an ongoing sharing of skills and knowledge between the requalification and initial license training programs within our applicable department instructions by March 1, 1993.

tatus: We have chosen to not implement this commitment as stated. Instead, our efforts to ensure the sharing of skills from the requalification training area to the initial license area have taken the form of:

Initial license instructors attend requalification train-the-trainer sessions.

Requalification instructors, management, and the Operations Liaison have participated in the training and evaluation of the initial license candidates to a significant degree.

Further review indicates that formalizing this sharing of instructional resource will add little benefit if organizational constraints preclude effective implementation. Therefore, we are evaluating our organizational structure and intend to implement appropriate changes to accomplish this objective by June 1, 1993.

f i R i i Ip training by July 1, 1993.

<<h h ff i* << l'id<<~

Status: The enclosed letter defines an assessment process which will commence in April, 1993. The results of this process willbe used to enhance industry events training which should create effective responsiveness to industry lessons learned and improve overall performance at WNP-2.

Additional actions are being taken beyond those previously committed to provide a better focus on injecting lessons learned into our training programs. The training staff has been informed through the enclosed letter of their critical role in establishing a culture that believes "it can happen here" with an urgency to prevent recurrence. We intend to enhance the visibility of related industry experience in our training materials. In addition, we plan to conduct instructor skills training on the INPO "case study approach" as an enhancement technique for effective industry events training. All actions are scheduled for completion by the original schedule of July 1, 1993.

'I Page Three NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27I ACTION STATUS A recent example, the Supply System response to the recent issue concerning BWR reactor vessel level anomalies during transients, demonstrates our training process for industry feedback. Also included in the following are the actions taken based upon a review of our plant experience with this issue.

Requalification cycle 92-6 contained classroom training covering rapid depressurization and notching indications.

BWROG source documents transmitted to all licensed operators via required reading. Operations night orders required the Shift Managers to train their crews on this information.

A Maintenance and Operations bulletin was prepared and distributed detailing how this industry experience could impact WNP-2.

Requalification cycle 93-1, which concluded on 2/19/93, contained classroom training and dynamic simulator scenarios containing rapid depressurization indications. This also included viewing a GE video tape on RPV level determination following rapid depressurization.

The initial licensed operator class, examined the week of 3/8/93, has had training on depressurization and notching indications included in EOP training.

The recent WNP-2 Problem Evaluation Request concerning observed notching was distributed as required reading prior to assuming licensed duties.

Formal training on this event was conducted during the last week of February, 1993, for all licensed personnel.

A follow-up quiz is planned for the subsequent requalification cycle.

e Page Four NRC INSPECTION OF FACILITYTRAINING (REPORT NO. 50-397/92-27) ACTION STATUS If you have any questions or require any additional information, please contact Mr. Myron Baird, Manager, Licensed Operator Requalification Training, at (509) 377-8266.

/

Sincerely, J +rvr~

V Parrish (Mail Drop 1023)

Assistant Managing Director, Operations DRK/bk cc: JB Martin - NRC RV NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Site Inspector - 901A