ML17292B262: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULA1 RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)~>ACCESSION NBR:9803100236 DOC.DATE: 98/03/04 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO DOCKET¹~~~~FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME , AUTHOR AFFILIATION BRING,R.L.
REGULA1 RY INFORMATION DISTRIBUTIO           SYSTEM (RIDS)
Washington Public Power Supply System ,RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
~> ACCESSION NBR:9803100236             DOC.DATE: 98/03/04 NOTARIZED: NO                     DOCKET   ¹ FACIL:50-397       WPPSS Nuclear Project, Unit 2, Washington Public             Powe   05000397 AUTH.NAME           , AUTHOR AFFILIATION BRING,R.L. ~  ~      Washington Public Power Supply System
                                  ~
    ,RECIP.NAME
            ~              RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards copy of"Performance Self-Assessment,WNP-2," documenting results of assessment, which was conducted 971006-31,of key functional areas.DISTRIBUTION CODE: A001D COPXES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Forwards copy of "Performance Self-Assessment,WNP-2,"
General Distribution C y/Oj A NOTES: RECIPIENT ID CODE/NAME PD4-2 LA POSLUSNY,C COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 E INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 1 1 1 1 1 1 1 1 1 0 1 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1 1 1 1 1 1 1 1 ERNAL: NOAC 1 1 NRC PDR 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
documenting results of assessment, which was conducted                                 C 971006-31,of key functional areas.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 I h I If 0WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 March 4, 1998 G02-98-045 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
DISTRIBUTION CODE: A001D TITLE:    OR COPXES RECEIVED:LTR Submittal: General Distribution ENCL        SIZE:      y/Oj         A NOTES:
E RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR ENCL PD4-2 LA                 1     1       PD4-2 PD                 1    1 POSLUSNY,C                1     1 INTERNAL: ACRS                           1    1                        1      1    1 NRR/DE/ECGB/A             1    1      NRR/DE/EMCB              1    1 NRR/DRCH/HICB             1    1      NRR/DSSA/SPLB            1     1 NRR/DSSA/SRXB            1    1      NUDOCS-ABSTRACT           1     1 OGC/HDS3                  1     0 ERNAL: NOAC                         1     1       NRC PDR                   1     1 D
NOTE TO   ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13
 
I h I If
 
0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 4, 1998 G02-98-045 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2, OPERATING LICENSE NPF-21 PERFORMANCE SELF ASSESSMENT REPORT The purpose of this letter is to transmit a copy of the Supply System's Performance Self Assessment Report.The attached report documents the results of an assessment, which was conducted October 6, 1997 through October 31, 1997, of key functional areas at WNP-2.The assessment team was comprised of several nuclear utility personnel, supported by Supply System employees knowledgeable in the areas evaluated.
WNP-2, OPERATING LICENSE NPF-21 PERFORMANCE SELF ASSESSMENT REPORT The purpose of this letter is to transmit a copy of the Supply System's Performance Self Assessment Report. The attached report documents the results of an assessment, which was conducted October 6, 1997 through October 31, 1997, of key functional areas at WNP-2. The assessment team was comprised of several nuclear utility personnel, supported by Supply System employees knowledgeable in the areas evaluated.
The goal of the assessment was to obtain an independent and critical functional evaluation of WNP-2 performance using industry and NRC standards and methodologies.
The goal of the assessment was to obtain an independent and critical functional evaluation of WNP-2 performance using industry and NRC standards and methodologies. The assessment focused on functional areas rather than departmental organizations. As a result, performance issues identified are associated with plant-wide functions, and not with specific work groups.
The assessment focused on functional areas rather than departmental organizations.
From an overall perspective, it was concluded from the assessment that WNP-2 performance during the last year can be characterized as improving, but at a slower rate than expected, with a continuing need for management attention in certain key areas. Actions have been developed for resolving issues identified during the assessment.
As a result, performance issues identified are associated with plant-wide functions, and not with specific work groups.From an overall perspective, it was concluded from the assessment that WNP-2 performance during the last year can be characterized as improving, but at a slower rate than expected, with a continuing need for management attention in certain key areas.Actions have been developed for resolving issues identified during the assessment.
We consider the self assessment process to be an integral part of our continued efforts to ASl I"
ASl We consider the self assessment process to be an integral part of our continued efforts to t I" improve performance and would welcome an opportunity to discuss the results and planned actions pertaining to the attached assessment report.9803i00236 980304 PDR ADOCK 050003'P7 l'DR, lllllillllllllilllllllflllllllllllllllllj 0 I$1 s~h'tgt~r~
t improve performance and would welcome an opportunity to discuss the results and planned actions pertaining to the attached assessment report.
WNP-2 PERFORMANCE SELF ASSESSMENT REPORT Page 2 If you have any questions or rcqune additional information pertaining to this letter, please contact me or P.J.Inserra at (509)377-4147.Respectfully, R.L.Webring Vice President, Operations Support/PIO Mail Drop PE08 Attachment CC: EW Merschoff-NRC RIV WH Bateman-NRC NRR JE Dyer-NRC RIV TP Gwynn-NRC RIV AT Howell III-NRC RIV GW Johnston-NRC RIV, WCFO KE Perkins, Jr.-NRC RIV, WCFO C Poslusny, Jr-NRC NRR HJ Wong-NRC RIV, WCFO NRC Senior Resident Inspector-927N DL Williams-BPA/399 PD Robinson-Winston&Strawn II}}
l'DR, 9803i00236 980304 PDR   ADOCK 050003'P7 lllllillllllllilllllllflllllllllllllllllj
 
0 I
$1 s~     h' tgt ~
r~
 
WNP-2 PERFORMANCE SELF ASSESSMENT REPORT Page 2 If you have   any questions or rcqune additional information pertaining to this letter, please contact me or P.J. Inserra at (509) 377-4147.
Respectfully, R.L. Webring Vice President, Operations Support/PIO Mail Drop PE08 Attachment CC:   EW Merschoff - NRC RIV                         KE Perkins, Jr. - NRC RIV, WCFO WH Bateman - NRC NRR                          C Poslusny, Jr - NRC NRR JE Dyer - NRC RIV                              HJ Wong - NRC RIV, WCFO TP Gwynn - NRC RIV                            NRC Senior Resident Inspector - 927N AT Howell III- NRC RIV                        DL Williams - BPA/399 GW Johnston - NRC RIV, WCFO                    PD Robinson - Winston & Strawn
 
II}}

Latest revision as of 13:01, 29 October 2019

Forwards Copy of Performance Self-Assessment,WNP-2, Documenting Results of Assessment,Which Was Conducted 971006-31,of Key Functional Areas
ML17292B262
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/04/1998
From: Webring R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292B263 List:
References
GO2-98-045, GO2-98-45, NUDOCS 9803100236
Download: ML17292B262 (6)


Text

CATEGORY j.

REGULA1 RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

~> ACCESSION NBR:9803100236 DOC.DATE: 98/03/04 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME , AUTHOR AFFILIATION BRING,R.L. ~ ~ Washington Public Power Supply System

~

,RECIP.NAME

~ RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards copy of "Performance Self-Assessment,WNP-2,"

documenting results of assessment, which was conducted C 971006-31,of key functional areas.

DISTRIBUTION CODE: A001D TITLE: OR COPXES RECEIVED:LTR Submittal: General Distribution ENCL SIZE: y/Oj A NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: ACRS 1 1 1 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 ERNAL: NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

I h I If

0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 4, 1998 G02-98-045 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 PERFORMANCE SELF ASSESSMENT REPORT The purpose of this letter is to transmit a copy of the Supply System's Performance Self Assessment Report. The attached report documents the results of an assessment, which was conducted October 6, 1997 through October 31, 1997, of key functional areas at WNP-2. The assessment team was comprised of several nuclear utility personnel, supported by Supply System employees knowledgeable in the areas evaluated.

The goal of the assessment was to obtain an independent and critical functional evaluation of WNP-2 performance using industry and NRC standards and methodologies. The assessment focused on functional areas rather than departmental organizations. As a result, performance issues identified are associated with plant-wide functions, and not with specific work groups.

From an overall perspective, it was concluded from the assessment that WNP-2 performance during the last year can be characterized as improving, but at a slower rate than expected, with a continuing need for management attention in certain key areas. Actions have been developed for resolving issues identified during the assessment.

We consider the self assessment process to be an integral part of our continued efforts to ASl I"

t improve performance and would welcome an opportunity to discuss the results and planned actions pertaining to the attached assessment report.

l'DR, 9803i00236 980304 PDR ADOCK 050003'P7 lllllillllllllilllllllflllllllllllllllllj

0 I

$1 s~ h' tgt ~

r~

WNP-2 PERFORMANCE SELF ASSESSMENT REPORT Page 2 If you have any questions or rcqune additional information pertaining to this letter, please contact me or P.J. Inserra at (509) 377-4147.

Respectfully, R.L. Webring Vice President, Operations Support/PIO Mail Drop PE08 Attachment CC: EW Merschoff - NRC RIV KE Perkins, Jr. - NRC RIV, WCFO WH Bateman - NRC NRR C Poslusny, Jr - NRC NRR JE Dyer - NRC RIV HJ Wong - NRC RIV, WCFO TP Gwynn - NRC RIV NRC Senior Resident Inspector - 927N AT Howell III- NRC RIV DL Williams - BPA/399 GW Johnston - NRC RIV, WCFO PD Robinson - Winston & Strawn

II