{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2017 Mr. James J. Hutto Regulatory Affairs Director Southern Nuclear Operating Company, Inc. P.O. Box 1295 / Bin -038 Birmingham, AL 35201-1295  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2017 Mr. James J. Hutto Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
P.O. Box 1295 / Bin - 038 Birmingham, AL 35201-1295


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -REISSUE OF CORRECTED TECHNICAL SPECIFICATION PAGE 3.6.6-3  
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REISSUE OF CORRECTED TECHNICAL SPECIFICATION PAGE 3.6.6-3


==Dear Mr. Hutto:==
==Dear Mr. Hutto:==
On June 30, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17152A218), the U.S. Nuclear Regulatory Commission issued Amendment No. 212 (Unit 1) and No. 209 (Unit 2) to the Joseph M. Farley Nuclear Plant (FNP) Renewed Operating Licenses.
 
The amendments were consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing." Subsequent to the June 30, 2017, amendment, it was identified that the FNP, Unit 1 and Unit 2, Technical Specification (TS) page 3.6.6-3 was missing Surveillance Requirement (SR) 3.6.6.9, issued on February 26, 2016, in Amendment No. 200 (Unit 1) and No. 196 (Unit 2) (ADAMS Accession No. ML15345A131).
On June 30, 2017 (Agencywide Documents Access and Management System (ADAMS)
The inadvertent omission of SR 3.6.6.9 was due to an administrative error in the processing Farley Amendment No. 202 (Unit 1) and No. 198 (Unit 2) on June 10, 2016 (ADAMS Accession No. ML15289A227).
Accession No. ML17152A218), the U.S. Nuclear Regulatory Commission issued Amendment No. 212 (Unit 1) and No. 209 (Unit 2) to the Joseph M. Farley Nuclear Plant (FNP) Renewed Operating Licenses. The amendments were consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing."
The omission of SR 3.6.6.9 was carried over into the June 30, 2017, FNP amendment that revised TS page 3.6.6-3. Please update TS page 3.6.6-3 with the enclosed corrected page. Docket Nos. 50-348, 50-364  
Subsequent to the June 30, 2017, amendment, it was identified that the FNP, Unit 1 and Unit 2, Technical Specification (TS) page 3.6.6-3 was missing Surveillance Requirement (SR) 3.6.6.9, issued on February 26, 2016, in Amendment No. 200 (Unit 1) and No. 196 (Unit 2) (ADAMS Accession No. ML15345A131). The inadvertent omission of SR 3.6.6.9 was due to an administrative error in the processing Farley Amendment No. 202 (Unit 1) and No. 198 (Unit 2) on June 10, 2016 (ADAMS Accession No. ML15289A227). The omission of SR 3.6.6.9 was carried over into the June 30, 2017, FNP amendment that revised TS page 3.6.6-3.
Please update TS page 3.6.6-3 with the enclosed corrected page.
Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348, 50-364


==Enclosures:==
==Enclosures:==


TS page 3.6.6-3 cc w/enclosure:
TS page 3.6.6-3 cc w/enclosure: Listserv
Listserv Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO ATTACHMENT TO LICENSE AMENDMENT NOS. 212 AND 209 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 DOCKET NOS. 50-348 AND 50-364 Replace the following page of the Appendix "A" Technical Specifications (TSs) with the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove Page TS 3.6.6-3 Insert Page TS 3.6.6-3 Containment Spray and Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)
 
SURVEILLANCE FREQUENCY SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for 15 minutes. the Surveillance Frequency Control Program SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is 1600 gpm. the Surveillance Frequency Control Program SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program SR 3.6.6.8 Verify each spray nozzle is unobstructed.
CORRECTION TO ATTACHMENT TO LICENSE AMENDMENT NOS. 212 AND 209 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 DOCKET NOS. 50-348 AND 50-364 Replace the following page of the Appendix "A" Technical Specifications (TSs) with the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
In accordance with the Surveillance Frequency Control Program SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program Farley Units 1 and 2 3.6.6-3 Amendment No. 212 (Unit 1) Amendment No. 209 (Unit 2)
Remove Page                       Insert Page TS                                TS 3.6.6-3                           3.6.6-3
 
Containment Spray and Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                     FREQUENCY SR 3.6.6.2         Operate each required containment cooling train fan     In accordance with unit for ~ 15 minutes.                                 the Surveillance Frequency Control Program SR 3.6.6.3         Verify each containment cooling train cooling water     In accordance with flow rate is ~ 1600 gpm.                               the Surveillance Frequency Control Program SR 3.6.6.4         Verify each containment spray pump's developed         In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head.                           TESTING PROGRAM SR 3.6.6.5         Verify each automatic containment spray valve in the   In accordance with flow path that is not locked, sealed, or otherwise     the Surveillance secured in position, actuates to the correct position   Frequency Control on an actual or simulated actuation signal.             Program SR 3.6.6.6         Verify each containment spray pump starts               In accordance with automatically on an actual or simulated actuation       the Surveillance signal.                                                 Frequency Control Program SR 3.6.6.7         Verify each containment cooling train starts           In accordance with automatically on an actual or simulated actuation       the Surveillance signal.                                                 Frequency Control Program SR 3.6.6.8         Verify each spray nozzle is unobstructed.               In accordance with the Surveillance Frequency Control Program SR 3.6.6.9         Verify containment spray locations susceptible to gas   In accordance with accumulation are sufficiently filled with water.       the Surveillance Frequency Control Program Farley Units 1 and 2                           3.6.6-3               Amendment No. 212 (Unit 1)
Amendment No. 209 (Unit 2)


==SUBJECT:==
ML17333A079                    *via email OFFICE    DORL/LPL2-1/PM    DORL/LPL2-1 /LA DORL/LPL2-1/BC    DORL/LPL2-1/PM NAME         SWilliams       KGoldstein     MMarkley          SWilliams DATE         12/4/2017         12/4/2017     12/6/2017         12/6/2017}}
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 -REISSUE OF CORRECTED TECHNICAL SPECIFICATION PAGE 3.6.6-3 DATED DECEMBER 6, 2017 DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsNrrDssStsb Resource RidsACRS_MailCTR Resource RidsNrrLAKGoldstein Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource ADAMS Accession No.: ML17333A079 OFFICE DORL/LPL2-1/PM DORL/LPL2-1  
/LA NAME SWilliams KGoldstein DATE 12/4/2017 12/4/2017  
*via email DORL/LPL2-1/BC MMarkley 12/6/2017 OFFICIAL RECORD COPY DORL/LPL2-1/PM SWilliams 12/6/2017}}

Latest revision as of 13:26, 22 October 2019

Reissue of Corrected Technical Specification Page 3.6.6-3
ML17333A079
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/06/2017
From: Shawn Williams
Plant Licensing Branch II
To: Hutto J
Southern Nuclear Operating Co
Williams S
References
Download: ML17333A079 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 6, 2017 Mr. James J. Hutto Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P.O. Box 1295 / Bin - 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REISSUE OF CORRECTED TECHNICAL SPECIFICATION PAGE 3.6.6-3

Dear Mr. Hutto:

On June 30, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17152A218), the U.S. Nuclear Regulatory Commission issued Amendment No. 212 (Unit 1) and No. 209 (Unit 2) to the Joseph M. Farley Nuclear Plant (FNP) Renewed Operating Licenses. The amendments were consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing."

Subsequent to the June 30, 2017, amendment, it was identified that the FNP, Unit 1 and Unit 2, Technical Specification (TS) page 3.6.6-3 was missing Surveillance Requirement (SR) 3.6.6.9, issued on February 26, 2016, in Amendment No. 200 (Unit 1) and No. 196 (Unit 2) (ADAMS Accession No. ML15345A131). The inadvertent omission of SR 3.6.6.9 was due to an administrative error in the processing Farley Amendment No. 202 (Unit 1) and No. 198 (Unit 2) on June 10, 2016 (ADAMS Accession No. ML15289A227). The omission of SR 3.6.6.9 was carried over into the June 30, 2017, FNP amendment that revised TS page 3.6.6-3.

Please update TS page 3.6.6-3 with the enclosed corrected page.

Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348, 50-364

Enclosures:

TS page 3.6.6-3 cc w/enclosure: Listserv

CORRECTION TO ATTACHMENT TO LICENSE AMENDMENT NOS. 212 AND 209 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TO RENEWED FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 DOCKET NOS. 50-348 AND 50-364 Replace the following page of the Appendix "A" Technical Specifications (TSs) with the enclosed page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Page Insert Page TS TS 3.6.6-3 3.6.6-3

Containment Spray and Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for ~ 15 minutes. the Surveillance Frequency Control Program SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is ~ 1600 gpm. the Surveillance Frequency Control Program SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program SR 3.6.6.8 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program Farley Units 1 and 2 3.6.6-3 Amendment No. 212 (Unit 1)

Amendment No. 209 (Unit 2)

ML17333A079 *via email OFFICE DORL/LPL2-1/PM DORL/LPL2-1 /LA DORL/LPL2-1/BC DORL/LPL2-1/PM NAME SWilliams KGoldstein MMarkley SWilliams DATE 12/4/2017 12/4/2017 12/6/2017 12/6/2017