Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2)
ML16272A189
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/03/2016
From: Shawn Williams
Plant Licensing Branch II
To: Pierce C
Southern Nuclear Operating Co
Williams S, DORL/LPLII-1, 415-1009
References
Download: ML16272A189 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 3, 2016 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Bin 038 Birmingham, AL 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 203 (UNIT 1) AND 199 (UNIT 2)

Dear Mr. Pierce:

In a letter dated August 3, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15233A448), the U.S. Nuclear Regulatory Commission issued Amendment No. 203 to Renewed Facility Operating License No. NPF-2 and Amendment No.

199 to Renewed Facility Operating License No. NPF-8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2, respectively. The amendments included changes to 63 technical specifications (TSs) pages. TS pages 3.5.5-1 and 3.5.5-2 were inadvertently included to be replaced.

However, as stated in the safety evaluation, the request related to these TS pages was withdrawn in the Southern Nuclear Company, Inc., letter dated September 28, 2015 (ADAMS Accession No. ML15271A223).

The correct TS page 3.5.5-1 corresponds to Amendment No. 146 (Unit 1) and Amendment No. 137 (Unit 2) that can be found in ADAMS Package Accession No. ML993500022 and attached. The correct TS page 3.5.5-2 corresponds to Amendment No. 185, (Unit 1), and Amendment No. 180, (Unit 2), that can be found in ADAMS Accession No. ML11167A226 and attached.

Sincerely, Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv

Seal Injection Flow 3.5.5 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.5 Seal Injection Flow LCO 3.5.5 Reactor coolant pump seal injection flow shall be within limits.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Seal injection flow not A.1 Adjust manual seal 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within limit. injection throttle valves in accordance with SR 3.5.5.1.

B. Required Action and B.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Farley Units 1 and 2 3.5.5-1 Amendment No. 146 (Unit 1)

Amendment No. 137 (Unit 2)

ECCS-Operating 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 --~*~-~~~-~NOTE~~~~----*~*~

Only required to be performed for valves 8132A and 81328 when Centrifugal Charging Pump A is Inoperable.

Verify the following valves are in the listed position In accordance with with power to the valve operator removed. the Surveillance Frequency Control Number Position Function Program 8884, 8886 Closed Centrifugal Charging Pump to RCS Hot Leg 8132A, 81320 Open Centrifugal Charging Pump discharge isolation 8689 Closed RHR to RCS Hot Leg Injection SR 3.5.2.2 Verify each ECCS manual, power operated, and In accordance with automatic valve in the flow path. that is not locked, the Surveillance sealed, or otherwise secured in position, is in the Frequency Control correct position. Program SR 3.52.3 Verify each ECCS pump's developed head at the test In accordance with flow point is greater than or equal to the required the lnservice developed head. Testing Program SR 3.5.2.4 Verify each ECCS automatic valve in the flow path In accordance with that is not locked. sealed, or otherwise secured in the Surveillance position, actuates to the correct position on an actual Frequency Control or simulated actuation signal.

  • Program Farley Units 1 and 2 3.5.2-2 Amendment No. 185 (Unit 1)

Amendment No. 180 (Unit 2)

ML11167A226 and attached.

Sincerely, IRA/

Shawn A. Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-1 R/F RidsACRS_MailCTR Resource RidsNrrLALRonewicz Resource RidsNrrDorlDpr Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource RidsNrrDssStsb Resource RecordsAmend RidssNrrDorllpl2-1 Resource ADAMS Accession No.: ML16272A189 OFFICE DORL/LPL2-1/PM DORL/LPL2-1 /LA DORL/LPL2-1 /BC DORL/LPL2-1 /PM NAME SWilliams LRonewicz MMarkley SWilliams DATE 9/29/2016 9/28/2016 10/03/2016 10/03/2016