NL-22-0091, Correction of Technical Specification Typographical Omission

From kanterella
Jump to navigation Jump to search

Correction of Technical Specification Typographical Omission
ML22056A310
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/24/2022
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-22-0091
Download: ML22056A310 (8)


Text

Cheryl A. Gayheart 3535 Colonnade Parkway Regulatory Affairs Director Birmingham, AL 35243 205 992 5316

cagayhea@southernco.com

February 24, 2022

Docket Nos. 50-348 NL-22-0091 50-364

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001

Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission

References:

1. ML19175A243 - Joseph M. Farley Nuclear Plant, Units 1 and 2 -

Issuance of Amendment Nos. 225 and 222 Regarding Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specifications (RMTS) Guidelines, Revision 0-A (EPID L-2018-LLA-0210)

2. ML17333A079 - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Reissue of Corrected Technical Specification Page 3.6.6-3.
3. Proposed Guidance for Correction of Technical Specification Typographical Errors, SECY-96-238, November 19, 1996

Ladies and Gentlemen:

This letter requests Nuclear Regulatory Commission (NRC) approval of a correction of a typographical omission in the Farley Nuclear Plant (FNP) Unit 1 and Unit 2 Technical Specifications (TS).

This omission occurred during the processing of License Amendments 225 and 222 for Units 1 and 2 respectively (Reference 1), where Surveillance Requirement (SR) 3.6.6.9 was inadvertently removed. SR 3.6.6.9 had previously been corrected through a reissue of the associated page for License Amendments 212 and 209 for Units 1 and 2 respectively (Reference 2). The omission was neither addressed in the notice to the public nor reviewed by the NRC, and thus falls within the scope of the guidance provided by SECY-96-238 (Reference 3).

describes the typographical omission and correction. Enclosure 2 provides the page from Amendments 225 and 222 as issued, with the requested correction noted. contains the corrected page for Amendments 225 and 222.

U. S. Nuclear Regulatory Commission NL-22-0091 Page 2

This letter contains no NRC commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.

Respectfully submitted,

C. A. Gayheart Director, Regulatory Affairs Southern Nuclear Operating Company

CAG/was/cg

Enclosures:

1. Description of Technical Specification Typographical Omission
2. Marked-up Technical Specification Page
3. Revised Technical Specification Page

cc: Regional Administrator, Region ll NRR Project Manager - Farley Senior Resident Inspector - Farley RTYPE: CFA04.054 Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission

Enclosure 1

Description of Technical Specification Typographical Omission to NL-22-0091 Description of Technical Specification Typographical Omission

1. Requested Action

Consistent with the information contained in SECY-96-238, Southern Nuclear Operating Company (SNC) is requesting correction of a typo graphical omission that was inadvertently introduced into the Farley Nuclear Plant (F NP) Units 1 and 2 Technical Specifications (TS). The omission was introduced by SNC staff in development of the license amendment request (LAR) submitted to the Nuclear Regulatory Commission (NRC) for FNP License Amendments 225 and 222 for Units 1 and 2 respectively. The page provided did not correctly reflect a TS change previously approved by the NRC with the issuance of License Amendments 212 and 209 for Units 1 and 2 respectively.

2. Typographical Omission

In the SNC application for License Amendments 225 and 222 for Units 1 and 2 respectively, Surveillance Requirement (SR) 3.6.6.9 was inadvertently re moved. To be consistent with the approved licensing basis, this SR should be added back into the Technical Specifications as follows:

SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program

3. Correction to Affected Page

SECY-96-238 (Reference 3) provides guidance to correct in advertent typographical errors in the Technical Specifications. The omission described above was neither posted in the public notices nor was it reviewed by NRC as part of the license amendment process. Therefore, it may be corrected without a license amendment.

E1-1 Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission

Enclosure 2

Marked-up Technical Specification Page Containment Spray and Cooling Systems 3.6.6

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for 15 minutes. the Surveillance Frequency Control Program

SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is 1600 gpm. the Surveillance Frequency Control Program

SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM

SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program

SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program

SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program

SR 3.6.6.8 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program

SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program

Farley Units 1 and 2 3.6.6-4 Amendment No. 225 (Unit 1)

Amendment No. 222 (Unit 2)

Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission

Enclosure 3

Revised Technical Specification Page Containment Spray and Cooling Systems 3.6.6

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for 15 minutes. the Surveillance Frequency Control Program

SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is 1600 gpm. the Surveillance Frequency Control Program

SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM

SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program

SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program

SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program

SR 3.6.6.8 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program

SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program

Farley Units 1 and 2 3.6.6-4 Amendment No. 225 (Unit 1)

Amendment No. 222 (Unit 2)