Letter Sequence Request |
---|
|
|
MONTHYEARNL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...2018-07-27027 July 2018 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... Project stage: Request ML18243A4062018-08-31031 August 2018 Acceptance of Licensing Action Regarding Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b Project stage: Acceptance Review ML18290B0942018-10-16016 October 2018 October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. Project stage: Meeting ML18306A3132018-11-0707 November 2018 Summary of October 16, 2018, Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Joseph M. Farley Unit 1 & 2, Electrical Distribution System as It Relates to the Risk-Informed Completion Times Amendment Project stage: Meeting ML18338A0052019-01-0404 January 2019 Regulatory Audit in Support of the License Amendment Request to Implement Risk-Informed Technical Specifications Initiative 4B Project stage: Acceptance Review ML19042A1082019-02-26026 February 2019 Audit Summary in Support of the License Amendment Request to Implement Risk-Informed Technical Specifications Initiative 4B Project stage: Other ML19072A0272019-03-12012 March 2019 NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4B Project stage: Acceptance Review NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) Project stage: Response to RAI NL-19-0623, Significant Hazards Evaluation and Environmental Considerations for Farley Risk Informed Technical Specifications Response to Request for Additional Information2019-05-17017 May 2019 Significant Hazards Evaluation and Environmental Considerations for Farley Risk Informed Technical Specifications Response to Request for Additional Information Project stage: Response to RAI NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes Project stage: Request ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A Project stage: Approval NL-22-0091, Correction of Technical Specification Typographical Omission2022-02-24024 February 2022 Correction of Technical Specification Typographical Omission Project stage: Request ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 Project stage: Approval 2019-03-12
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal 2024-09-04
[Table view] Category:Technical Specifications
MONTHYEARML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-22-0091, Correction of Technical Specification Typographical Omission2022-02-24024 February 2022 Correction of Technical Specification Typographical Omission ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17333A0792017-12-0606 December 2017 Reissue of Corrected Technical Specification Page 3.6.6-3 NL-17-1974, Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package2017-11-21021 November 2017 Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package NL-17-1067, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-06-0808 June 2017 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement ML16272A1892016-10-0303 October 2016 Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2) ML15289A2272016-06-10010 June 2016 Issuance of Amendments Related to TSTF-432-A, Revision 1 ML16083A2652016-05-17017 May 2016 Issuance of Amendments to Revise Technical Specification 3.4.14 NL-16-0034, License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding2016-03-16016 March 2016 License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding NL-15-1956, Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions2016-03-14014 March 2016 Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions NL-15-2062, Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 22015-11-25025 November 2015 Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 2 NL-15-0722, Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request2015-11-20020 November 2015 Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request ML15180A3342015-08-0303 August 2015 Issuance of Amendments ML15083A0982015-06-0202 June 2015 Issuance of Amendments (TAC Nos. MF4828, MF4829, MF4889, and MF4890) ML14308A0482015-03-10010 March 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) NL-15-0188, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52015-02-13013 February 2015 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 NL-14-0115, Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52014-09-17017 September 2014 Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 ML14155A3022014-08-15015 August 2014 Issuance of Amendment Regarding Minimum Condensate Storage Tank Level Technical Specifications ML14069A3442014-05-13013 May 2014 Issuance of Amendments to Incorporate the Schedule for Degraded Grid Voltage Modification NL-12-0867, License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank2012-08-20020 August 2012 License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank NL-12-0868, Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report2012-08-15015 August 2012 Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report NL-12-1226, License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report2012-08-14014 August 2012 License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report NL-12-1552, Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating2012-07-23023 July 2012 Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating NL-12-0403, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-28028 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-0299, Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.42012-01-18018 January 2012 Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.4 NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated..2010-10-29029 October 2010 License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. NL-09-1676, Request to Revise Technical Specification 3.7.8, Service Water System (Sws).2009-10-21021 October 2009 Request to Revise Technical Specification 3.7.8, Service Water System (Sws). NL-09-1622, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws).2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws). NL-09-1861, License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report2009-09-15015 September 2009 License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report ML0917706642009-09-0404 September 2009 Southern Nuclear Operating Company Plants, License Amendments, Regarding Elimination of Working Hour Restrictions from Technical Specifications ML0827300082008-09-29029 September 2008 Tech Spec Pages for Amendment Nos. 178 and 171 Revised TS for Limiting Condition for Operation 3.9.3, Containment Penetrations. NL-08-0832, Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications.2008-06-12012 June 2008 Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications. ML0818202472008-05-23023 May 2008 Updated Final Safety Analysis Report, Revision 21, Technical Specifications Bases NL-06-2801, Technical Specification Amendment Request, Containment Leakage Rate Testing Program2007-11-0505 November 2007 Technical Specification Amendment Request, Containment Leakage Rate Testing Program NL-07-1079, Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization2007-07-17017 July 2007 Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization 2024-08-27
[Table view] |
Text
Cheryl A. Gayheart 3535 Colonnade Parkway Regulatory Affairs Director Birmingham, AL 35243 205 992 5316
cagayhea@southernco.com
February 24, 2022
Docket Nos. 50-348 NL-22-0091 50-364
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001
Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission
References:
- 1. ML19175A243 - Joseph M. Farley Nuclear Plant, Units 1 and 2 -
Issuance of Amendment Nos. 225 and 222 Regarding Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specifications (RMTS) Guidelines, Revision 0-A (EPID L-2018-LLA-0210)
- 2. ML17333A079 - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Reissue of Corrected Technical Specification Page 3.6.6-3.
- 3. Proposed Guidance for Correction of Technical Specification Typographical Errors, SECY-96-238, November 19, 1996
Ladies and Gentlemen:
This letter requests Nuclear Regulatory Commission (NRC) approval of a correction of a typographical omission in the Farley Nuclear Plant (FNP) Unit 1 and Unit 2 Technical Specifications (TS).
This omission occurred during the processing of License Amendments 225 and 222 for Units 1 and 2 respectively (Reference 1), where Surveillance Requirement (SR) 3.6.6.9 was inadvertently removed. SR 3.6.6.9 had previously been corrected through a reissue of the associated page for License Amendments 212 and 209 for Units 1 and 2 respectively (Reference 2). The omission was neither addressed in the notice to the public nor reviewed by the NRC, and thus falls within the scope of the guidance provided by SECY-96-238 (Reference 3).
describes the typographical omission and correction. Enclosure 2 provides the page from Amendments 225 and 222 as issued, with the requested correction noted. contains the corrected page for Amendments 225 and 222.
U. S. Nuclear Regulatory Commission NL-22-0091 Page 2
This letter contains no NRC commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.
Respectfully submitted,
C. A. Gayheart Director, Regulatory Affairs Southern Nuclear Operating Company
CAG/was/cg
Enclosures:
- 1. Description of Technical Specification Typographical Omission
- 2. Marked-up Technical Specification Page
- 3. Revised Technical Specification Page
cc: Regional Administrator, Region ll NRR Project Manager - Farley Senior Resident Inspector - Farley RTYPE: CFA04.054 Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission
Enclosure 1
Description of Technical Specification Typographical Omission to NL-22-0091 Description of Technical Specification Typographical Omission
- 1. Requested Action
Consistent with the information contained in SECY-96-238, Southern Nuclear Operating Company (SNC) is requesting correction of a typo graphical omission that was inadvertently introduced into the Farley Nuclear Plant (F NP) Units 1 and 2 Technical Specifications (TS). The omission was introduced by SNC staff in development of the license amendment request (LAR) submitted to the Nuclear Regulatory Commission (NRC) for FNP License Amendments 225 and 222 for Units 1 and 2 respectively. The page provided did not correctly reflect a TS change previously approved by the NRC with the issuance of License Amendments 212 and 209 for Units 1 and 2 respectively.
- 2. Typographical Omission
In the SNC application for License Amendments 225 and 222 for Units 1 and 2 respectively, Surveillance Requirement (SR) 3.6.6.9 was inadvertently re moved. To be consistent with the approved licensing basis, this SR should be added back into the Technical Specifications as follows:
SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program
- 3. Correction to Affected Page
SECY-96-238 (Reference 3) provides guidance to correct in advertent typographical errors in the Technical Specifications. The omission described above was neither posted in the public notices nor was it reviewed by NRC as part of the license amendment process. Therefore, it may be corrected without a license amendment.
E1-1 Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission
Enclosure 2
Marked-up Technical Specification Page Containment Spray and Cooling Systems 3.6.6
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for 15 minutes. the Surveillance Frequency Control Program
SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is 1600 gpm. the Surveillance Frequency Control Program
SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM
SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program
SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program
SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program
SR 3.6.6.8 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program
SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program
Farley Units 1 and 2 3.6.6-4 Amendment No. 225 (Unit 1)
Amendment No. 222 (Unit 2)
Farley Nuclear Plant - Units 1 and 2 Correction of Technical Specification Typographical Omission
Enclosure 3
Revised Technical Specification Page Containment Spray and Cooling Systems 3.6.6
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
SR 3.6.6.2 Operate each required containment cooling train fan In accordance with unit for 15 minutes. the Surveillance Frequency Control Program
SR 3.6.6.3 Verify each containment cooling train cooling water In accordance with flow rate is 1600 gpm. the Surveillance Frequency Control Program
SR 3.6.6.4 Verify each containment spray pump's developed In accordance with head at the flow test point is greater than or equal to the INSERVICE the required developed head. TESTING PROGRAM
SR 3.6.6.5 Verify each automatic containment spray valve in the In accordance with flow path that is not locked, sealed, or otherwise the Surveillance secured in position, actuates to the correct position Frequency Control on an actual or simulated actuation signal. Program
SR 3.6.6.6 Verify each containment spray pump starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program
SR 3.6.6.7 Verify each containment cooling train starts In accordance with automatically on an actual or simulated actuation the Surveillance signal. Frequency Control Program
SR 3.6.6.8 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program
SR 3.6.6.9 Verify containment spray locations susceptible to gas In accordance with accumulation are sufficiently filled with water. the Surveillance Frequency Control Program
Farley Units 1 and 2 3.6.6-4 Amendment No. 225 (Unit 1)