ML082730008
| ML082730008 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/29/2008 |
| From: | Plant Licensing Branch II |
| To: | |
| Feintuch K, NRR/DORL/LPL2-1, 415-3079 | |
| Shared Package | |
| ML082730005 | List: |
| References | |
| TAC MD5433, TAC MD5434 | |
| Download: ML082730008 (3) | |
Text
178, 178
171 171
Containment Penetrations 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 APPLICABILITY:
The containment penetrations shall be in the following status:
- a.
The equipment hatch is capable of being closed and held in place by four bolts;
- b.
One door in each air lock is capable of being closed; and
- c.
Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:
- 1.
closed by a manual or automatic isolation valve, blind flange, or equivalent, or
- 2.
capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System.
During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more containment A.1 Suspend CORE Immediately penetrations not in ALTERATIONS.
required status.
AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.
Farley Units 1 and 2 3.9.3-1 Amendment No.
Amendment No.
(Unit 1)
(Unit 2) 178 171