{{#Wiki_filter:,.. --U-0102'ILLINDIS POWER COMPANY 500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 August 15, 1979 Mr. James Keppler Dir&ctor, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Dear Mr. Keppler.
{{#Wiki_filter:-
This is in response to Mr. Fiorelli's letter of July 19, 1979, which forwarded IE Inspection Report No. 50-461/79-06 detailing the findings of the NRC/R0 III inspection conducted at Illinois Power Company's Clinton Power Station site on June 4-7, 1979.IP's response to the three items of noncompliance identified in the report is described below and correlates directly to the sequential listing in Appendix A to your letter.
,   .. -
1.The Baldwin Associates' Receiving Inspection Instruction has been revised to include the requirement that all physical damage to structural steel will be documented for necessary correction.
U-0102
Items with major damage are to be reported on Nonconformance Reports in accordance with the established NCR procedure.
'
Items with minor damage are to be documented on a special inspection report for referral to the job-site engineer and visually identified for subsequent correction during erection.
ILLINDIS POWER COMPANY 500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 August 15, 1979 Mr. James Keppler Dir&ctor, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois     60137 Dear Mr. Keppler.
Safety-related structural steel received to date has been reinspected and damaged items have been processed in accordance with the revised Receiving Inspection Instruc-tion.2.Zack, Incorporated's Welding Procedure Specification CB-QCP 22 has been revised to correctly reference Part A of AWS Dl.1, Section 5.
This is in response to Mr. Fiorelli's letter of July 19, 1979, which forwarded IE Inspection Report No. 50-461/79-06 detailing the findings of the NRC/R0 III inspection conducted at Illinois Power Company's Clinton Power Station site on June 4-7, 1979. IP's response to the three items of noncompliance identified in the report is described below and correlates directly to the sequential listing in Appendix A to your letter.
The revised Welding Procedure Specification was effective August 13, 1979.
: 1. The Baldwin Associates' Receiving Inspection Instruction has been revised to include the requirement that all physical damage to structural steel will be documented for necessary correction. Items with major damage are to be reported on Nonconformance Reports in accordance with the established NCR procedure.       Items with minor damage are to be documented on a special inspection report for referral to the job-site engineer and visually identified for subsequent correction during erection.
3.Certificates of Conformance on Masterbuilders grout received to date have been obtained from our suppliers.
Safety-related structural steel received to date has been reinspected and damaged items have been processed in accordance with the revised Receiving Inspection Instruc-tion.
: 2. Zack, Incorporated's Welding Procedure Specification CB-QCP 22 has been revised to correctly reference Part A of AWS Dl.1, Section 5. The revised Welding Procedure Specification was effective August 13, 1979.
: 3. Certificates of Conformance on Masterbuilders grout received to date have been obtained from our suppliers.
Future purchase orders for this grout will require Certificates of Conformance in order tc assure that the product continues to meet requirements.
Future purchase orders for this grout will require Certificates of Conformance in order tc assure that the product continues to meet requirements.
A1 j," , a pG M 7909190 N'L4  
A1
~....U-0102 Q37-79(08-15)-9 Mr. James Keppler August 15, 1979 Page 2 It is believed that the foregoing adequately addresses the iteds of noncompliance conveyed in your report.
                                                                          , j,       "
I trust that this completes our corrective action to your satisfaction.
a pG M                   7909190           N' L4
Sincerel ,/W.C. Gerstner Executive Vice President di cc: CPS /DRC-Microfilm, T-29 o b;; 6(;),-}}
 
  ~ ..
.
.
U-0102 Q37-79(08-15)-9 Mr. James Keppler                     August 15, 1979 Page 2 It is believed that the foregoing adequately addresses the iteds of noncompliance conveyed in your report. I trust that this completes our corrective action to your satisfaction.
Sincerel ,
                                                  /
W. C. Gerstner Executive Vice President di cc: CPS /DRC-Microfilm, T-29 o
                                                                        , b
                                                              ;; 6(;)
                                                                      -}}

Revision as of 14:20, 19 October 2019

Responds to NRC 790719 Ltr Re Violations Noted in IE Insp Rept 50-461/79-06.Corrective Actions:Baldwin Associates Receiving Insp Instruction Revised to Include Documentation of Physical Damage to Structural Steel for Correction
ML19208B171
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/15/1979
From: Gerstner W
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19208B168 List:
References
U-0102, U-102, NUDOCS 7909190179
Download: ML19208B171 (2)


Text

-

, .. -

U-0102

'

ILLINDIS POWER COMPANY 500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 August 15, 1979 Mr. James Keppler Dir&ctor, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Dear Mr. Keppler.

This is in response to Mr. Fiorelli's letter of July 19, 1979, which forwarded IE Inspection Report No. 50-461/79-06 detailing the findings of the NRC/R0 III inspection conducted at Illinois Power Company's Clinton Power Station site on June 4-7, 1979. IP's response to the three items of noncompliance identified in the report is described below and correlates directly to the sequential listing in Appendix A to your letter.

1. The Baldwin Associates' Receiving Inspection Instruction has been revised to include the requirement that all physical damage to structural steel will be documented for necessary correction. Items with major damage are to be reported on Nonconformance Reports in accordance with the established NCR procedure. Items with minor damage are to be documented on a special inspection report for referral to the job-site engineer and visually identified for subsequent correction during erection.

Safety-related structural steel received to date has been reinspected and damaged items have been processed in accordance with the revised Receiving Inspection Instruc-tion.

2. Zack, Incorporated's Welding Procedure Specification CB-QCP 22 has been revised to correctly reference Part A of AWS Dl.1, Section 5. The revised Welding Procedure Specification was effective August 13, 1979.
3. Certificates of Conformance on Masterbuilders grout received to date have been obtained from our suppliers.

Future purchase orders for this grout will require Certificates of Conformance in order tc assure that the product continues to meet requirements.

A1

, j, "

a pG M 7909190 N' L4

~ ..

.

.

U-0102 Q37-79(08-15)-9 Mr. James Keppler August 15, 1979 Page 2 It is believed that the foregoing adequately addresses the iteds of noncompliance conveyed in your report. I trust that this completes our corrective action to your satisfaction.

Sincerel ,

/

W. C. Gerstner Executive Vice President di cc: CPS /DRC-Microfilm, T-29 o