ML061360459: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/16/2006
| issue date = 05/16/2006
| title = 3/29/2006 - Summary of Annual Assessment Meeting with Dominion Nuclear Connecticut (Millstone Station) and the Connecticut Nuclear Energy Advisory Council (Neac)
| title = 3/29/2006 - Summary of Annual Assessment Meeting with Dominion Nuclear Connecticut (Millstone Station) and the Connecticut Nuclear Energy Advisory Council (Neac)
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000336, 05000423
| docket = 05000336, 05000423
| license number = DPR-065, NPF-049
| license number = DPR-065, NPF-049
| contact person = Krohn P G, RI/DRP/PB6/610-337-5120
| contact person = Krohn P, RI/DRP/PB6/610-337-5120
| case reference number = MN 06-007, MN 06-008
| case reference number = MN 06-007, MN 06-008
| package number = ML060660559
| package number = ML060660559

Revision as of 19:03, 13 July 2019

3/29/2006 - Summary of Annual Assessment Meeting with Dominion Nuclear Connecticut (Millstone Station) and the Connecticut Nuclear Energy Advisory Council (Neac)
ML061360459
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/16/2006
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Dominion Nuclear Connecticut
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML060660559 List:
References
MN 06-007, MN 06-008
Download: ML061360459 (3)


Text

May 16, 2006MEETING

SUMMARY

LICENSEE:DOMINION NUCLEAR CONNECTICUTFACILITY:MILLSTONE UNITS 2 & 3

SUBJECT:

SUMMARY

OF MARCH 29, 2006, ANNUAL ASSESSMENT MEETING WITHDOMINION NUCLEAR CONNECTICUT AND THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)On March 29, 2006, at 3:00 p.m., an Annual Assessment Meeting was conducted at the Lelan F. Sillin Training Facility, Waterford, CT, between the Nuclear Regulatory Commission(NRC) and Dominion Nuclear Connecticut (Dominion). The NRC requested the meeting withDominion management to discuss the NRC's assessment of the safety performance of theMillstone Nuclear Power Plant for calendar year 2005. At 6:00 p.m. the same day a jointmeeting with NEAC was conducted at the Waterford Town Hall, Waterford, CT, to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2005.The NRC presented and discussed its assessment of the safety performance of MillstoneUnits 2 and 3 for the period between January 1 through December 31, 2005. The NRC presentations included a discussion of the reactor oversight process, general background on both plants, performance assessment results, and an overview of calendar year 2006 planned inspections. As part of the annual assessment meeting at 3:00 p.m., Dominion presented anoverview of their performance in the areas of post-maintenance testing and operabilityevaluations. At the 6:00 p.m. meeting, the NRC provided NEAC with an overall assessment ofplant performance and with specifics concerning selected inspection findings.The public observed both meetings and was offered the opportunity to communicate with the NRC regarding Dominion's performance at Millstone and the role of the Agency in ensuringsafe plant operations. At the end of both meetings, the NRC answered questions from thepublic including a discussion of events and issues that occurred at the Millstone units over theprevious year and the effluents that were released. The meeting notices with attached meetingagenda can be located in ADAMS Accession No. ML060660566 and ML060660570. The slides for the meetings can be found at ADAMS Accession No. ML060820202 and ML060830079.Sincerely,/RA/Paul G. Krohn, ChiefProjects Branch 6 Division of Reactor Projects 2cc w/encl:First Selectmen, Town of WaterfordB. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Spath, SLO Designee, New York State Energy Research and Development Authority 3Distribution

P. Krohn, DRP S. Barber, DRP B. Norris, DRP S. Schneider, DRP S. Kennedy, DRP J. Benjamin, DRP E. Bartels, DRP N. Sieller, DRP E. Huang, DRP V. NersesSISP Review Complete: PGK DOCUMENT NAME: E:\Filenet\ML061360459.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy withattachment/enclosure " N" = No copyOFFICERI/DRP RI/DRP NAMESBarber/SBPKrohn/PGKDATE 5/16/06 5/16/06 OFFICIAL RECORD COPY