ML061360459

From kanterella
Jump to navigation Jump to search
3/29/2006 - Summary of Annual Assessment Meeting with Dominion Nuclear Connecticut (Millstone Station) and the Connecticut Nuclear Energy Advisory Council (Neac)
ML061360459
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/16/2006
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Dominion Nuclear Connecticut
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML060660559 List:
References
MN 06-007, MN 06-008
Download: ML061360459 (3)


Text

May 16, 2006 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT FACILITY: MILLSTONE UNITS 2 & 3

SUBJECT:

SUMMARY

OF MARCH 29, 2006, ANNUAL ASSESSMENT MEETING WITH DOMINION NUCLEAR CONNECTICUT AND THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

On March 29, 2006, at 3:00 p.m., an Annual Assessment Meeting was conducted at the Lelan F. Sillin Training Facility, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut (Dominion). The NRC requested the meeting with Dominion management to discuss the NRCs assessment of the safety performance of the Millstone Nuclear Power Plant for calendar year 2005. At 6:00 p.m. the same day a joint meeting with NEAC was conducted at the Waterford Town Hall, Waterford, CT, to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2005.

The NRC presented and discussed its assessment of the safety performance of Millstone Units 2 and 3 for the period between January 1 through December 31, 2005. The NRC presentations included a discussion of the reactor oversight process, general background on both plants, performance assessment results, and an overview of calendar year 2006 planned inspections. As part of the annual assessment meeting at 3:00 p.m., Dominion presented an overview of their performance in the areas of post-maintenance testing and operability evaluations. At the 6:00 p.m. meeting, the NRC provided NEAC with an overall assessment of plant performance and with specifics concerning selected inspection findings.

The public observed both meetings and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the Agency in ensuring safe plant operations. At the end of both meetings, the NRC answered questions from the public including a discussion of events and issues that occurred at the Millstone units over the previous year and the effluents that were released. The meeting notices with attached meeting agenda can be located in ADAMS Accession No. ML060660566 and ML060660570. The slides for the meetings can be found at ADAMS Accession No. ML060820202 and ML060830079.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

2 cc w/encl:

First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Spath, SLO Designee, New York State Energy Research and Development Authority

3 Distribution:

P. Krohn, DRP S. Barber, DRP B. Norris, DRP S. Schneider, DRP S. Kennedy, DRP J. Benjamin, DRP E. Bartels, DRP N. Sieller, DRP E. Huang, DRP V. Nerses SISP Review Complete: PGK DOCUMENT NAME: E:\Filenet\ML061360459.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME SBarber/SB PKrohn/PGK DATE 5/16/06 5/16/06 OFFICIAL RECORD COPY