| | issue date = 01/22/2008 | | | issue date = 01/22/2008 |
| | title = Request for Additional Info for the Review of the Vogtle Electric Generating Plant, Units 1 and 2, LRA | | | title = Request for Additional Info for the Review of the Vogtle Electric Generating Plant, Units 1 and 2, LRA |
| | author name = Ashley D J | | | author name = Ashley D |
| | author affiliation = NRC/NRR/ADRO/DLR | | | author affiliation = NRC/NRR/ADRO/DLR |
| | addressee name = Tynan T E | | | addressee name = Tynan T |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
| | license number = NPF-068, NPF-081 | | | license number = NPF-068, NPF-081 |
| | contact person = ASHLEY D J NRR/DLR/RLRA 415-3191 | | | contact person = ASHLEY D NRR/DLR/RLRA 415-3191 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 7 | | | page count = 7 |
|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARIR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23188A1512023-08-0909 August 2023 Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23065A0612023-03-0303 March 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 14 - Vogtle - AST, TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML23006A0882023-01-0606 January 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - Accident Source Term (Ast), TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML22348A0332022-12-13013 December 2022 NRR E-mail Capture - for Your Action - RAI - Vogtle, Unit 2 - Steam Generator Tube Inspection Report (L-2022-LRO-0120) ML22192A1042022-08-0101 August 2022 Acceptance of Requested Licensing Action Amendment Request Application to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel with Request for Additional Information ML22157A0902022-06-0606 June 2022 NRR E-mail Capture - RAIs - Vogtle, Unit 1 - Refueling Outage (RFO) 1R23 Steam Generator (SG) Tube Inspection Report ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22026A3942022-01-26026 January 2022 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21350A1032021-12-16016 December 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21321A3762021-11-15015 November 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21033B1072021-02-0202 February 2021 NRR E-mail Capture - RAI - Vogtle Unit 1 - SG Report (L-2020-LRO-0059) ML20338A1512020-12-0303 December 2020 NRR E-mail Capture - RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20325A0432020-11-20020 November 2020 NRR E-mail Capture - for Your Review - Draft RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20297A3052020-10-22022 October 2020 NRR E-mail Capture - RAIs for Vogtle Relief Request - EPRI Report (L-2020-LLR-0109) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML19263A6432019-09-19019 September 2019 NRR E-mail Capture - RAI - Vogtle End State License Amendment Request (LAR) to Revise the Technical Specifications (Tss) for Vogtle, Units 1 and 2 (L-2019-LLA-0148) ML19156A1872019-06-0505 June 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Vogtle Unit 2 Core Operating Limits Report, Cycle 21 ML19105B1632019-04-15015 April 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Voglte TSTF-412 Adoption LAR (L-2018-LLA-0731) ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18236A4452018-08-30030 August 2018 Review of Response to RAI License Amendment Request for Approval to Utilize the Tornado Missile Risk Evaluator to Analyze Tornado Missile Protection Non-Conformances ML18227A0222018-08-15015 August 2018 Notification of Inspection and Request for Information ML18225A3362018-08-13013 August 2018 NRR E-mail Capture - Request for Additional Information Regarding Relief Request VEGP-ISI-RR-03 ML18197A0602018-07-13013 July 2018 Us NRC Final RAI No. 1 for Vogtle 3 and 4 LAR-18-015, Fire Protection System Non-Safety Cable Spray Removal ML18197A1882018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18197A1052018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 1 on Vogtle 3 and 4 LAR-17-043, Containment Pressure Analysis ML18192C0782018-07-11011 July 2018 RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 ML18192B7692018-07-11011 July 2018 Us NRC Draft Request for Additional Information (Draft RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18136A4972018-06-0101 June 2018 Request for Additional Information, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18109A1152018-05-0101 May 2018 Request for Additional Information ML18079A9572018-03-28028 March 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML18030B0622018-02-0808 February 2018 Request for Additional Information Reverse Technical Specification 5.5.17 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (CAC Nos. MG0240, MG0241; EPID L-2017-LLA-0295) ML17355A1012018-01-11011 January 2018 Request for Additional Information (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) ML17354A7822018-01-0505 January 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML17318A0352017-11-22022 November 2017 Request for Additional Information 2024-01-26
[Table view] |
Text
January 22, 2008 Mr. Tom E. Tynan Vice President - Vogtle Southern Nuclear Operating Company, Inc. 7821 River Road Waynesboro, GA 30830
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Tynan:
By letter dated June 28, 2007, Southern Nuclear Operating Company, Inc., submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Vogtle Electric Generating Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Chalmer Myer, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3191 or e-mail DJA1@nrc.gov. Sincerely, /RA/ Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
Request for Additional Information cc w/encl: See next page
ML080080406 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME IKing DAshley LLund DATE 01/16/08 01/16/08 01/22/08 ENCLOSURE VOGTLE ELECTRIC GENERATING PLANT (VEGP), UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA) REQUEST FOR ADDITIONAL INFORMATION (RAI)
RAI-4.2.3-1
We have reviewed the information on page 4.2-10 of the Application for License Renewal and have noted a number of errors, the most significant of which is the numerical temperature value (-226°F) for the RT PTS for the Inlet Nozzle to Nozzle Shell Course Weld 105-121D shown in Table 4.2.3-1. This value appears to be inconsistent with the other data provided for the material. In addition, notes B and E to this Table 4.2.3-1 appear to be incorrect and, in particular, inconsistent with Note F to the same table. Please correct the information on page 4.2-10 and resubmit this page.
RAI 4.3-1 LRA Section 4.3.1 states, "In addition to the original design transients, fatigue loading transients and issues subsequently identified are not parts of the original fatigue analyses. For the lower pressurizer head and surge line, thermal stratification and insurge/outsurge transients are evaluated (IEB 88-11)."
a.) The evaluation result for the pressurizer lower head was not discussed in LRA Section 4.3.1.4, "Thermal Stratification of the Surge Line and Lower Pressurizer Head (IEB 88-11)." Please provide the limiting 60-year projected cumulative usage factor (CUF) value for the pressurizer lower head.
b.) An NRC safety evaluation entitled "Vogtle Unit 1 Safety Evaluation on Pressurizer Surge Line Thermal Stratification," dated April 12, 1990, states, "Applicant committed to revise applicable operating procedures to limit the system delta T (between the pressurizer head and the reactor coolant loop) for reactor coolant system (RCS) heatup (HU) to 320°F and RCS cool down (CD) to 300°F. The revised heatup and cooldown procedures ensure consistency between actual plant operation and the surge line analysis assumption."
Please discuss the procedures that have been used by VEGP and demonstrate the consistency between the recorded plant operational transient data and the assumptions (delta T limits of 320°F & 300°F during HU/CD) that were made and used in the surge line and pressurizer lower head thermal stratification analyses.
RAI 4.3-2 Section 4.3.1.5.3 of the LRA includes the following assessment for the environmentally-assisted fatigue analysis for the surge line hot leg nozzle:
"The maximum design CUF determined from the ASME Code fatigue analysis for the VEGP surge line hot leg nozzle is 0.95. Applying the maximum F en for stainless steel from NUREG/CR-5704 (Ref. 10) of 15.35 increases the maximum CUF value to an environmental fatigue adjusted value of 14.58, which is greater than 1.0. Therefore, a different demonstration method is used.
Using fatigue monitoring software, cooldown/heatup cycles for Unit 1 and Unit 2 from 6/30/95 through 10/9/05 were analyzed to determine the average CUF per HU/CD cycle. Using this data, SNC has shown that at the surge line hot leg nozzle the projected CUF for 200 HU/CD cycles is 0.00534 for Unit 1 and 0.00628 for Unit 2."
Please discuss the changes in the heatup and cooldown procedures, specifically the implementation of the modified operating procedure (MOP), to mitigate pressurizer insurge/outsurge transients. Please explain how the impacts of MOP were factored into the calculation of the average CUF per HU/CD in the environmentally assisted fatigue analysis.
RAI 4.3-3 LRA Sections 4.3.1.5.4 and 4.3.1.5.5 state that the average F en for the charging nozzle and safety injection nozzle is 7.6 and 5.535, respectively. In response to the audit question 4.3-5, VEGP stated that F en values for normal charging, alternative charging and safety injection nozzles were computed from the actual plant events using an integrated strain rate (ISR) method as defined in the EPRI Report TR-1003083, Guidelines for Assessing Fatigue Environmental Effects in a License Renewal Application (MRP-47 Revision 1). ISR method calculates one F en for one transient pair. Both the charging nozzle and safety injection nozzle were designed to several thermal transients. Please justify how one average F en value per nozzle could be used for more than one transient pair having significant contribution to the CUF.
RAI 4.3-4 LRA Section 4.3.1.5 stated that the environmentally-assisted fatigue on the surge line hot leg nozzle, and charging nozzle was evaluated using fatigue monitoring software.
Please provide the benchmarking of the software using relevant transient data, proper 3-D model (cylinder to cylinder), and NRC endorsed computer code ANSYS. Please justify the use of the fatigue monitoring software to update the CUF calculation by using the monitored or projected transient data (cycles) and discuss the conservatisms in the calculation on a plant-specific basis.
Steam Generator Program - Tube Integrity The nominal tube wall thickness is 0.040". The Steam Generator Program - Tube Integrity requires steam generator tubes be plugged if they have a 40 percent degradation from the nominal wall thickness (0.040*.4 = 0.016 or a wall thickness less than 0.024"). Based on the results of specific analysis for allowable tube wall thinning for the VEGP Model F steam
generator tubes under normal operating and accident loadings, a minimum wall thickness of 0.014" is necessary to satisfy the stress limits of Regulatory Guide 1.121. The minimum inspection-acceptable wall thickness for new tubes is 0.039".
The assumed general wall loss due to corrosion and erosion over 40 years is 3 mils, which reduces the tube wall thickness to 0.036". The corrosion rate of 3 mils is based on a conservative weight-loss rate for Inconel tubing in flowing 650°F primary side reactor coolant fluid. The weight loss, when equated to a thinning rate and projected over a 40-year design objective with appropriate reduction after initial hours, is equivalent to 0.083-mils thinning. The assumed corrosion rate of 3 mils allows a conservative 2.917 mils for general corrosion thinning on the secondary side. Increasing the assumed corrosion rate by 50 percent from 3 mils to 4.5 mils has no effect on tube plugging criteria.
RAI 4.7.3-1 The LRA Section 4.7.3 states that 3 mils is the corrosion rate, not the general wall loss over 40 years. Please confirm that the 3 mils being referenced is the total wall loss over the 40 year design life.
RAI 4.7.3-2 The LRA Section 4.7.3 implies that the entire 3 mils of wall loss will be consumed from the primary side of the tube only, which appears to conflict with the statement that there are 2.917 mils of allowance for general corrosion thinning on the secondary side. Please confirm that the 3 mils of wall loss accounts for wall loss on both the primary and secondary sides of the tubes. If this is not the case, please indicate what the corrosion allowances are for the primary and secondary sides of the tubes. Also, please provide a basis for stating that a 2.917 mils allowance for general corrosion thinning on the secondary side is conservative (e.g., discuss the operating experience of the Vogtle Electric Generating Plant regarding secondary side general thinning of steam generator tubes).
RAI B.3.14-1 In the License Amendment Request, Appendix B, Section B.3.14, Nickel Alloy Management Program for Non-Reactor Vessel Closure Head Penetration Locations, it is stated that currently, management of primary water stress-corrosion cracking in nickel alloys is a rapidly evolving area and as a result, program attributes have not yet been finalized. Further, where industry guidance has been developed, there are ongoing efforts to reach acceptable resolution of NRC staff concerns which may alter program requirements. Therefore, assessments for each of the ten aging management program elements are not included for this program.
Please identify when the assessments of each of the ten aging management program elements will be provided.
Letter to T. Tynan from D. Ashley, dated January 22, 2008 DISTRIBUTION
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
HARD COPY DLR RF E-MAIL: PUBLIC SSmith (srs3) SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter ------------- DAshley JPLeous BSingal CJulian, RII GMcCoy, RII BAnderson, RII Vogtle Electric Generating Plant, Units 1 and 2 cc: Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295
Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684
Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334
Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334
Attorney General Law Department 132 Judicial Building Atlanta, GA 30334
Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349
Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216
Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Mr. Stanford M. Blanton, Esq. Balch & Bingham, LLP P.O. Box 306 Birmingham, AL 35201 Ms. Moanica M. Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295
Chalmer R. Myer Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295