Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML20258A0142020-09-0909 September 2020 Acceptance Review - Vogtle GSI-191 LAR (L-2020-LLA-0182) Project stage: Acceptance Review ML20325A0432020-11-20020 November 2020 NRR E-mail Capture - for Your Review - Draft RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) Project stage: Draft RAI ML20338A1512020-12-0303 December 2020 NRR E-mail Capture - RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) Project stage: RAI ML21071A0502021-07-30030 July 2021, 3 August 2021 Exemption - Vogtle GSI-191 Project stage: Request ML21068A0822021-07-30030 July 2021 Issuance of Amendment Nos. 206 and 189, Regarding a License Amendment Request for a Risk-Informed Resolution to GSI-191 Project stage: Approval ML21230A0222021-09-15015 September 2021 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Other 2020-09-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23188A1512023-08-0909 August 2023 Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23065A0612023-03-0303 March 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 14 - Vogtle - AST, TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML23006A0882023-01-0606 January 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - Accident Source Term (Ast), TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML22348A0332022-12-13013 December 2022 NRR E-mail Capture - for Your Action - RAI - Vogtle, Unit 2 - Steam Generator Tube Inspection Report (L-2022-LRO-0120) ML22192A1042022-08-0101 August 2022 Acceptance of Requested Licensing Action Amendment Request Application to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel with Request for Additional Information ML22157A0902022-06-0606 June 2022 NRR E-mail Capture - RAIs - Vogtle, Unit 1 - Refueling Outage (RFO) 1R23 Steam Generator (SG) Tube Inspection Report ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22026A3942022-01-26026 January 2022 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21350A1032021-12-16016 December 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21321A3762021-11-15015 November 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21033B1072021-02-0202 February 2021 NRR E-mail Capture - RAI - Vogtle Unit 1 - SG Report (L-2020-LRO-0059) ML20338A1512020-12-0303 December 2020 NRR E-mail Capture - RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20325A0432020-11-20020 November 2020 NRR E-mail Capture - for Your Review - Draft RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20297A3052020-10-22022 October 2020 NRR E-mail Capture - RAIs for Vogtle Relief Request - EPRI Report (L-2020-LLR-0109) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML19263A6432019-09-19019 September 2019 NRR E-mail Capture - RAI - Vogtle End State License Amendment Request (LAR) to Revise the Technical Specifications (Tss) for Vogtle, Units 1 and 2 (L-2019-LLA-0148) ML19156A1872019-06-0505 June 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Vogtle Unit 2 Core Operating Limits Report, Cycle 21 ML19105B1632019-04-15015 April 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Voglte TSTF-412 Adoption LAR (L-2018-LLA-0731) ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18236A4452018-08-30030 August 2018 Review of Response to RAI License Amendment Request for Approval to Utilize the Tornado Missile Risk Evaluator to Analyze Tornado Missile Protection Non-Conformances ML18227A0222018-08-15015 August 2018 Notification of Inspection and Request for Information ML18225A3362018-08-13013 August 2018 NRR E-mail Capture - Request for Additional Information Regarding Relief Request VEGP-ISI-RR-03 ML18197A0602018-07-13013 July 2018 Us NRC Final RAI No. 1 for Vogtle 3 and 4 LAR-18-015, Fire Protection System Non-Safety Cable Spray Removal ML18197A1882018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18197A1052018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 1 on Vogtle 3 and 4 LAR-17-043, Containment Pressure Analysis ML18192B7692018-07-11011 July 2018 Us NRC Draft Request for Additional Information (Draft RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18192C0782018-07-11011 July 2018 RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 ML18136A4972018-06-0101 June 2018 Request for Additional Information, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18109A1152018-05-0101 May 2018 Request for Additional Information ML18079A9572018-03-28028 March 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML18030B0622018-02-0808 February 2018 Request for Additional Information Reverse Technical Specification 5.5.17 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (CAC Nos. MG0240, MG0241; EPID L-2017-LLA-0295) ML17355A1012018-01-11011 January 2018 Request for Additional Information (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) ML17354A7822018-01-0505 January 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML17318A0352017-11-22022 November 2017 Request for Additional Information 2024-07-17
[Table view] |
Text
From: Lamb, John Sent: Friday, November 20, 2020 8:43 AM To: Lowery, Ken G.
Subject:
For Your Review - DRAFT RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182)
Importance: High
- Ken, Below are draft requests for additional information (RAIs) regarding the Southern Nuclear Operating Company (SNC) Vogtle GSI-191 LAR. The draft RAIs are being transmitted to facilitate the technical review being conducted by the U.S. Nuclear Regulatory Commission (NRC) staff and to support a conference call, if needed, with SNC in order to clarify the RAIs. The draft RAIs are being sent to you to ensure that they are understandable, the regulatory basis is clear, to ensure there is no proprietary information, and to determine if the information was previously docketed. Additionally, review of the draft RAIs would allow SNC to evaluate and agree upon a schedule to respond to the RAIs. Please let me know if SNC needs a clarifying call. If so, please provide SNCs availability.
Thanks.
John DRAFT REQUEST FOR ADDITIONAL INFORMATION By letter dated August 17, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20230A346), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request for the Vogtle Electric Generating Plant (Vogtle), Units 1 and 2. The proposed amendments consist of changes to the License and Technical Specifications (TSs).
The proposed amendments would revise the licensing basis as described in the Vogtle Final Safety Analysis Report (FSAR) to allow the use of a risk-informed approach to address safety issues discussed in Generic Safety Issue (GSI)-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. In addition, the proposed amendments would add a new TS 3.6.7, Containment Sump, and add an Action to address the condition of the containment sump made inoperable due to containment accident generated and transported debris exceeding the analyzed limits.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your application and determined that additional information is needed to complete its detailed technical review to make an independent assessment regarding the acceptability of the proposed exemptions in terms of regulatory requirements. Below are the requests for additional information (RAIs).
REQUEST FOR ADDITIONAL INFORMATION RAI #1 , Section 3.2.7, of the letter dated August 17, 2020, specifies that physical or procedural modifications that affect inputs to the NARWHAL model will be updated periodically. In Section 3.2.5, and in the FSAR markup, the model is excluded specifically as a key element that is described in the
FSAR. The NARWHAL model is an integral part of the analysis and replacement with a different model would be complex. Industry and the NRC expended significant resources to provide assurance that the NARWHAL model provides acceptable results. The review and development of NARWHAL included verification and validation of the software. In addition, the software is controlled under a quality assurance program intended to assure that errors in the model are tracked and corrected as necessary.
Explain the reason for the statements excluding the tool or program in Section 3.2.5 and 3.2.7 and discuss whether the use of a different tool or program would constitute a change of method that could require NRC approval prior to its use. The NRC acknowledges that the licensee could perform a limited set of calculations outside of the NARWHAL model to evaluate specific scenarios. However, a full analysis may be difficult to perform without using the software.
RAI #2 The list of FSAR references does not include the Vogtle Technical Report or associated NRC staff evaluation, dated September 30, 2019 (ADAMS Accession No. ML19120A469), that provides most of the technical basis for the FSAR text. Please justify not including these documents as the analysis of record in the FSAR.
RAI #3 , Page A2-7, of the letter dated August 17, 2020, does not include any reference to fuel design in the Other GSI-191 Inputs. These parameters may be important when considering design modifications or operability evaluations. Sump Swapover time, Hot-Leg Switchover (HLSO) Time, Alternate Flow Path (AFP) resistance, chemical effects timing, and barrel/baffle configuration may need to be evaluated by modifications and considered in operability evaluations associated with long-term core cooling (LTCC). Please justify the omission of these parameters from consideration for operability and future modifications.
RAI #4 The results of the break selection and transport analyses are not intuitive when compared to the technical report (TR, previous submittal) values. Explain why the breaks in Enclosure 2, table A3-3, of the letter dated August 17, 2020, are larger than those in table 3.b.4-2 in the TR. The small and fine fibrous debris amounts are also greater in the LAR than in the TR. Explain how smaller breaks would not be more than larger breaks if particulate debris amounts are increased and other debris source terms remain unchanged. Describe whether the breaks in TR table 3.b.4-2 still pass all acceptance criteria.
Additionally, the transported values of fiber for the limiting breaks that pass all acceptance criteria are much lower in the LAR than in the TR. Table A3-5 has significantly reduced transport of fiber and sodium aluminum silicate to the RHR strainers while other particulate and chemical species are increased when compared to the TR values. Explain how the debris generation and transport values in these tables were calculated, how they relate to the limiting breaks from the TR, and how they relate to the overall analysis of risk. Describe how risk increases when the limiting breaks are larger than those that were previously identified as limiting. Based on the above, please justify the assumptions and calculations for debris generation and transport.
RAI #5
Table B 3.6.7-1 from the Technical Specification (TS) Bases markup contains the prescriptive debris limits for one and two-train operation. This table is only included in the TS bases. Please justify the omission of this information in the analysis record provided in the FSAR.
Hearing Identifier: NRR_DRMA Email Number: 903 Mail Envelope Properties (DM6PR09MB56710CBE8147D94B9CDD14B3FAFF0)
Subject:
For Your Review - DRAFT RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182)
Sent Date: 11/20/2020 8:43:14 AM Received Date: 11/20/2020 8:43:14 AM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
"Lowery, Ken G." <KGLOWERY@southernco.com>
Tracking Status: None Post Office: DM6PR09MB5671.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 6139 11/20/2020 8:43:14 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: