LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter
ML23353A170
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/19/2023
From: Gleaves W
NRC/NRR/VPOB
To: Coleman J
Southern Nuclear Operating Co
References
EPID L-2023-LLA-0002
Download: ML23353A170 (1)


Text

December 19, 2023 Ms. Jamie M. Coleman, Director Fleet Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway, Bin N-226-EC Birmingham, AL 35243

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4ISSUANCE OF AMENDMENT REGARDING LICENSE AMENDMENT REQUEST: TECHNICAL SPECIFICATION 3.8.3, INVERTERS - OPERATING, COMPLETION TIME EXTENSION (EPID L-2023-LLA-0002)

Dear Ms. Coleman:

The U.S. Nuclear Regulatory Commission (the Commission or NRC) has issued the enclosed Amendment Nos. 197 and 193 to Combined License (COL) Nos. NPF-91 and NPF-92 for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, respectively. The amendments consist of changes to COL Appendix A, Technical Specifications designated by Southern Nuclear Operating Company as License Amendment Request (LAR)22-002. The amendments involve changes to the VEGP, Units 3 and 4, COL Appendix A, TS, specifically to revise the VEGP, Units 3 and 4, COL Appendix A, Technical Specifications (TS) 3.8.3, Inverters - Operating, to extend the completion time for Required Action A.1 from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 14 days. There is an additional unrelated change to correct a misspelling in VEGP, Units 3 and 4, TS 3.3.9, Engineered Safety Feature Actuation System (ESFAS) Manual Initiation.

A copy of the related safety evaluation, which includes the evaluation of the changes, is also enclosed. A Notice of Issuance associated with the amendment will be published in the Federal Register.

In accordance with Title 10 of the Code of Federal Regulations, Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

William (Billy) Gleaves, Senior Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket Nos.: 52-025,52-026

Enclosures:

1. Amendment No. 197 to VEGP Unit 3 COL NPF-91
2. Amendment No. 193 to VEGP Unit 4 COL NPF-92
3. Safety Evaluation cc: Listserv

Package: ML23243A956 Vogtle Unit 3 & 4 Letter: ML23353A170 Amendment No. 197: ML23243A968 Attachment Unit 3: ML23243A980 Amendment No. 193: ML23243B054 Attachment Unit 4: ML23243B057 Safety Evaluation: ML23243B049 Concurred by email NRR-106 OFFICE NRR/VPO/PM NRR/DORL/LPL2-2/LA NRR/DEX/EEEB/BC NRR/DSS/STSB/BC NAME BGleaves RButler VGoel*

SMehta DATE 9/14/2023 09/14/2023 12/18/23 12/01/23 OFFICE NRR/DRA/APLB/BC NRR/VPO/PM OGC NRR/VPO/BC NAME JWhitman*

CSantos MASpencer LNist DATE 12/18/23 11/30/23 12/18/23 12/19/23