Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005)
ML23243A009
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/31/2023
From: Bradley Davis
NRC/RGN-II/DCI/CIB2
To: Coleman J
Southern Nuclear Operating Co
References
IR 2023005
Download: ML23243A009 (1)


Text

Sincerely, Bradley Davis, Chief Construction Inspection Branch 2 Division of Construction Oversight Docket Nos. 05200025 and 05200026 License Nos. NPF-91 and NPF-92

Enclosure:

Inspection Plan August 31, 2023 Jamie Coleman Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 & 4 (REPORT 05200025/2023005 & 05200026/2023005)

Dear Jamie Coleman:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Vogtle Electric Generating Plant, Units 3 & 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4428 with any questions you have regarding this letter.

Signed by Davis, Bradley on 08/31/23

ML23243A009 x SUNSI Review x Non-Sensitive x Publicly Available Sensitive Non-Publicly Available OFFICE RII:DCO RII:DCO NAME C.Even B.Davis DATE 08/31/23 08/31/23

Site Inspection Activity Plan Vogtle AP 1000

09/01/2023 - 06/30/2025

Unit Start End Activity CAC Title Staff Count

SECURITY BASELINE INSPECTION 2

3,4 10/23/2023 10/27/2023 IP 71130.01 000733 Access Authorization

3,4 10/23/2023 10/27/2023 IP 71130.06 000738 Protection of Safeguards Information

3,4 10/23/2023 10/27/2023 IP 71130.08 000740 Fitness For Duty Program

PROBLEM IDENFICATION & RESOLUTION 3

4 2/26/2024 3/1/2024 IP 71152B 000747 Problem Identification and Resolution

PROBLEM IDENTIFICATION & RESOLUTION 3

3 2/26/2024 3/1/2024 IP 71152B 000747 Problem Identification and Resolution

VOGTLE UNIT 4 INITIAL LICENSE EXAM 7

4 5/12/2024 5/25/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

3 5/20/2024 5/24/2024 IP 71114.01 000716 Exercise Evaluation

3 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

3 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 2

4 5/20/2024 5/24/2024 IP 71114.01 000716 Exercise Evaluation

4 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

4 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification

RP PUBLIC RAD SAFETY BASELINE INSPECTION 3

3 6/10/2024 6/14/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

3 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

3 6/10/2024 6/14/2024 IP 71151 000746 Performance Indicator Verification

RP PUBLIC RAD SAFETY BASELINE INSPECTION 3

4 6/10/2024 6/14/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

4 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

4 6/10/2024 6/14/2024 IP 71151 000746 Performance Indicator Verification

MATERIAL CONTROL & ACCOUNTABILITY 1

3 7/8/2024 7/12/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

VOGTLE 3 REQUAL INSPECTION 2

3 7/21/2024 7/27/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

VOGTLE 4 REQUAL INSPECTION 2

4 7/21/2024 7/27/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Prepared on 8/24/2023 3:22:34 PM 1 of 3 Site Inspection Activity Plan

SECURITY BASELINE INSPECTION 5

4 7/29/2024 8/2/2024 IP 71130.02 000734 Access Control

4 7/29/2024 8/2/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

4 7/29/2024 8/2/2024 IP 71130.07 000739 Security Training

4 7/29/2024 8/2/2024 IP 71130.09 001656 Security Plan Changes

4 7/29/2024 8/2/2024 IP 71151 001338 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

3 7/29/2024 8/2/2024 IP 71130.02 000734 Access Control

3 7/29/2024 8/2/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

3 7/29/2024 8/2/2024 IP 71130.07 000739 Security Training

3 7/29/2024 8/2/2024 IP 71130.09 001656 Security Plan Changes

3 7/29/2024 8/2/2024 IP 71151 001338 Performance Indicator Verification

UNIT 3 IN-SERVICE INSPECTION +SG 2

3 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2

3 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3 10/21/2024 10/25/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

3 10/21/2024 10/25/2024 IP 71124.04 000728 Occupational Dose Assessment

3 10/21/2024 10/25/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

3 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification

3 11/4/2024 11/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

3 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment

3 11/4/2024 11/8/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

3 11/4/2024 11/8/2024 IP 71151 000746 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

3 10/21/2024 10/25/2024 IP 71130.05 000737 Protective Strategy Evaluation

SECURITY BASELINE INSPECTION 5

4 10/21/2024 10/25/2024 IP 71130.05 000737 Protective Strategy Evaluation

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - VOG 5

3 6/2/2025 6/6/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

3 6/23/2025 6/27/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - VOG 5

4 6/2/2025 6/6/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

4 6/23/2025 6/27/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

CYBER SECURITY INSPECTION 2

3 6/16/2025 6/20/2025 IP 71130.10 000741 Cybersecurity

Prepared on 8/24/2023 3:22:34 PM 2 of 3 Site Inspection Activity Plan

CYBER SECURITY INSPECTION 2

4 6/16/2025 6/20/2025 IP 71130.10 000741 Cybersecurity

Prepared on 8/24/2023 3:22:34 PM 3 of 3