Letter Sequence RAI |
---|
|
|
MONTHYEARNL-16-2002, Supplemental Response to NRC Generic Letter 2004-022017-04-21021 April 2017 Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML17166A4332017-06-26026 June 2017 Supplemental Information Needed for Acceptance of Systematic Risk-Informed Assessment of Debris Technical Report Project stage: Acceptance Review NL-17-1201, Response to Supplemental Information Needed for Acceptance of Systematic Risk-Informed Assessment of Debris Technical Report2017-07-11011 July 2017 Response to Supplemental Information Needed for Acceptance of Systematic Risk-Informed Assessment of Debris Technical Report Project stage: Request ML17191A8332017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Withholding Request Acceptance ML17191A5702017-07-24024 July 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17191A6912017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Withholding Request Acceptance ML17199A1032017-07-25025 July 2017 Acceptance of Requested Plant-Specific Technical Report Review Systematic Risk-Informed Assessment of Debris Project stage: Acceptance Review ML17264A2822017-10-12012 October 2017 Request for Additional Information Re Systematic Risk-Informed Assessment of Debris Technical Report Project stage: RAI ML17277A4892017-10-18018 October 2017 Audit Plan Re Systematic Risk-Informed Assessment of Debris Technical Report (CAC Nos. MF9685 and MF9686) Project stage: Other ML17275A0262017-11-15015 November 2017 Request for Additional Information (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) Project stage: RAI ML17318A0352017-11-22022 November 2017 Request for Additional Information Project stage: RAI ML17355A1012018-01-11011 January 2018 Request for Additional Information (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) Project stage: RAI NL-18-0102, Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process, Response to Request for Additional Information (RAIs 1,2,3, & 12)2018-02-0606 February 2018 Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process, Response to Request for Additional Information (RAIs 1,2,3, & 12) Project stage: Response to RAI ML18051A3172018-03-16016 March 2018 Audit Plan for Second Audit Concerning Systematic Risk-Informed Assessment of Debris Technical Report (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) Project stage: Other ML18109A1152018-05-0101 May 2018 Request for Additional Information Project stage: RAI ML18193B1622018-07-10010 July 2018 Units 1 & 2 - Supplemental Response to NRC Generic Letter 2004-02 Project stage: Request ML18275A0402018-10-31031 October 2018 Technical Evaluation Report: Use of BADGER and Narwhal to Compute Strainer Failure Probability - Vogtle Units 1 and 2 Nuclear Power Plant Project stage: Other ML18306A5752018-11-0808 November 2018 Summary of Public Telephone Conference with Southern Nuclear Operating Company Regarding Proposed Limitations and Conditions Related to the Review of Vogtle Systematic Risk Informed Assessment of Debris Technical Report Project stage: Approval ML19120A4692019-09-30030 September 2019 Final Safety Evaluation for Vogtle Electric Generating Plant, Units 1 and 2 Systematic Risk-Informed Assessment of Debris Technical Report Project stage: Approval 2017-07-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARIR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23188A1512023-08-0909 August 2023 Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension ML23200A0112023-07-18018 July 2023 Document Request for Vogtle Unit 3 RP Inspection ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23193A7832023-07-12012 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23065A0612023-03-0303 March 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 14 - Vogtle - AST, TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML23006A0882023-01-0606 January 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - Accident Source Term (Ast), TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) ML22348A0332022-12-13013 December 2022 NRR E-mail Capture - for Your Action - RAI - Vogtle, Unit 2 - Steam Generator Tube Inspection Report (L-2022-LRO-0120) ML22192A1042022-08-0101 August 2022 Acceptance of Requested Licensing Action Amendment Request Application to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel with Request for Additional Information ML22157A0902022-06-0606 June 2022 NRR E-mail Capture - RAIs - Vogtle, Unit 1 - Refueling Outage (RFO) 1R23 Steam Generator (SG) Tube Inspection Report ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22026A3942022-01-26026 January 2022 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21350A1032021-12-16016 December 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21321A3762021-11-15015 November 2021 NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21033B1072021-02-0202 February 2021 NRR E-mail Capture - RAI - Vogtle Unit 1 - SG Report (L-2020-LRO-0059) ML20338A1512020-12-0303 December 2020 NRR E-mail Capture - RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20325A0432020-11-20020 November 2020 NRR E-mail Capture - for Your Review - Draft RAIs for Vogtle GSI-191 LAR (L-2020-LLA-0182) ML20297A3052020-10-22022 October 2020 NRR E-mail Capture - RAIs for Vogtle Relief Request - EPRI Report (L-2020-LLR-0109) ML20293A0752020-10-14014 October 2020 NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151) ML20149K6252020-05-27027 May 2020 NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption Requests ML19263A6432019-09-19019 September 2019 NRR E-mail Capture - RAI - Vogtle End State License Amendment Request (LAR) to Revise the Technical Specifications (Tss) for Vogtle, Units 1 and 2 (L-2019-LLA-0148) ML19156A1872019-06-0505 June 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Vogtle Unit 2 Core Operating Limits Report, Cycle 21 ML19105B1632019-04-15015 April 2019 NRR E-mail Capture - Request for Additional Information (RAI) for Voglte TSTF-412 Adoption LAR (L-2018-LLA-0731) ML18355A4772019-01-0404 January 2019 Request for Additional Information Revise TS 5.2.2.g and Update Emergency Plan Minimum On-Shift Staff Tables ML18337A4032018-12-0606 December 2018 Request for Additional Information Revise Technical Specification 5.2.2.G and Updating Emergency Plan Minimum On-Shift Staff Tables ML18236A4452018-08-30030 August 2018 Review of Response to RAI License Amendment Request for Approval to Utilize the Tornado Missile Risk Evaluator to Analyze Tornado Missile Protection Non-Conformances ML18227A0222018-08-15015 August 2018 Notification of Inspection and Request for Information ML18225A3362018-08-13013 August 2018 NRR E-mail Capture - Request for Additional Information Regarding Relief Request VEGP-ISI-RR-03 ML18197A0602018-07-13013 July 2018 Us NRC Final RAI No. 1 for Vogtle 3 and 4 LAR-18-015, Fire Protection System Non-Safety Cable Spray Removal ML18197A1882018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18197A1052018-07-13013 July 2018 Us NRC Final Request for Additional Information (Final RAI) No. 1 on Vogtle 3 and 4 LAR-17-043, Containment Pressure Analysis ML18192C0782018-07-11011 July 2018 RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 ML18192B7692018-07-11011 July 2018 Us NRC Draft Request for Additional Information (Draft RAI) No. 4 on Vogtle LAR-17-024, Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes ML18136A4972018-06-0101 June 2018 Request for Additional Information, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18109A1152018-05-0101 May 2018 Request for Additional Information ML18079A9572018-03-28028 March 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Company'S Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Unit ML18030B0622018-02-0808 February 2018 Request for Additional Information Reverse Technical Specification 5.5.17 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (CAC Nos. MG0240, MG0241; EPID L-2017-LLA-0295) ML17355A1012018-01-11011 January 2018 Request for Additional Information (CAC Nos. MF9685 and MF9686; EPID L-2017-TOP-0038) ML17354A7822018-01-0505 January 2018 Request for Additional Information Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248) ML17318A0352017-11-22022 November 2017 Request for Additional Information 2024-01-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 1, 2018 Ms.Cheryl A.Gayheart Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF9685 AND MF9686; EPID L-2017-TOP-0038)
Dear Ms. Gayheart:
By letter dated April 21, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17116A096) as supplemented by letters dated July 11, 2017 (ADAMS Accession No. ML17192A245), November 9, 2017 (ADAMS Accession No. ML17314A014), January 2, 2018 (ADAMS Accession No. ML18004A070), January 9, 2018 (ADAMS Accession No. ML18009A841 ), February 6, 2018, (ADAMS Accession No. ML180378121 ), February 12, 2018 (ADAMS Accession No. ML18045A094), and February 21, 2018 (ADAMS Accession No. ML180528342), Southern Nuclear Operating Company, Inc.
submitted a plant-specific technical report (TR) for Vogtle Electric Generating Plant, Units 1 and 2, and requested U.S. Nuclear Regulatory Commission (NRC) approval. The plant-specific TR describes a risk-informed methodology to evaluate debris effects with the exception of in-vessel fiber limits.
The NRC staff has reviewed the submittal and has determined that additional information is needed to complete its review. Enclosed is the NRC staff's request for additional information (RAI). The RAls were discussed with your staff on April 30, 2018, and it was agreed that your response would be provided within 30 days from the date of this letter.
If you have any questions regarding this request, please contact me at (301) 415-2871 or Michael.Marshall@nrc.gov.
s;z;/"~
Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
Request for Additional Information
REQUEST FOR ADDITIONAL INFORMATION REGARDING SYSTEMATIC RISK-INFORMED ASSESSMENT OF DEBRIS TECHNICAL REPORT SOUTHERN NUCLEAR OPERATING COMPANY, INC.
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 SOUTHERN NUCLEAR OPERATING COMPANY DOCKET NOS. 50-424 AND 50-425 By letter dated April 21, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17116A096) as supplemented by letters dated July 11, 2017 (ADAMS Accession No. ML17192A245), November 9, 2017 {ADAMS Accession No. ML17314A014), January 2, 2018 (ADAMS Accession No. ML18004A070), January 9, 2018 (ADAMS Accession No. ML18009A841 ), February 6, 2018, (ADAMS Accession No. ML18037B121), February 12, 2018 (ADAMS Accession No. ML18045A094), and February 21, 2018 (ADAMS Accession No. ML180528342), Southern Nuclear Operating Company, Inc. (SNC, licensee) submitted a plant-specific technical report {TR) for Vogtle Electric Generating Plant, Units 1 and 2, and requested U.S. Nuclear Regulatory Commission (NRC) approval. The plant-specific TR describes a risk-informed methodology to evaluate debris effects with the exception of in-vessel fiber limits. In its letter dated April 21, 2017, the licensee has stated that the risk-informed methodology in the TR will be used to support future requests for licensing actions. In the letter dated April 21, 2017, SNC stated that the TR supersedes previous responses to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," (ML042360586).
The NRC staff reviewed the submittal and has determined that the enclosed additional information is needed to complete its review. The requests for additional information (RAls) listed below are not a complete listing of the additional information needed to complete the NRC staff's review. Additional RAls were provided via separate correspondence. RAls number 1 through 3 were sent in a separate letter dated October 12, 2017 (ADAMS Accession No. ML17264A282). RAls number 4 through 10 were sent in a separate letter dated November 15, 2017 (ADAMS Accession No. ML17275A026). RAls number 11 through 15 were sent in a separate letter dated November 22, 2017 (ADAMS Accession No. ML17318A035). RAls number 16 through 36 were sent in a separate letter dated January 11, 2018 (ADAMS Accession No. ML17355A101).
Unless stated otherwise, all references to enclosures, sections, and page numbers in the RAls are concerning the letter dated April 21, 2017.
Paragraph (b) of Title 10 of the Code of Federal Regulations, Section 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," requires, in Enclosure
part, that an emergency core cooling system (ECCS) be provided for long-term cooling after successful initial operation of the ECCS. Water for long-term cooling is recirculated through the plant's sump strainer. GL 2004-02 contained a request that licensees provide verification that the sump screens (i.e., sump strainers) are capable of withstanding the loads imposed by the accumulation of debris and pressure differentials caused by blockage under flow conditions.
Item 3.k of the NRC staff's revised content guide for GL 2004-02 supplement responses (ADAMS Accession No. ML073110389) requests licensees summarize the structural qualification results and design margins for various components of the sump strainer structural assembly.
(37) Table 3.k.1-3 of Enclosure 2, states that the crush pressure on the strainer due to suction strainer operation is equivalent to 10.1 ft. of head loss. This pressure is used in the load combinations for the structural analysis of the strainer. However, several locations in Enclosure 2 (e.g., Tables 3.f.14-1 and 3.g.16-1) identify strainer head loss values greater than 10.1 ft. and the supplemental response to GL 2004-02 item 3.f. 7 notes that the strainer structural margin is 24 ft. It is not clear what the head loss limit is for the strainer.
- a. Please identify the head loss limit for structural qualification of the strainer and explain how this value was determined.
- b. If the value does not bound all postulated head loss values, please provide a justification for any exceedances.
Title 10 of the Code of Federal Regulations, Section 50.46, Subsection (a)(1) requires in part that cooling performance be calculated with an acceptable evaluation model and must be calculated for a number of postulated loss-of-coolant accidents (LOCA) of different sizes, locations, and other properties sufficient to provide assurance that the most severe postulated loss-of-coolant accidents are calculated. Additionally, the subsection requires that the evaluation includes sufficient supporting justification to show that the analytical technique realistically describes the behavior of the reactor system during a LOCA. In its risk-informed methodology, the licensee used guidance and acceptance guidelines described in Regulatory Guide (RG) 1.174, Rev. 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," (ADAMS Accession No. ML100910006).
(38) Section 2.3.3 of RG 1.174, Rev. 2, states that:
... technical adequacy will be understood as being determined by the adequacy of the actual modeling and the reasonableness of the assumptions and approximations.
Enclosure 1, Section 2.0, of the submittal states that a screening process can be used to eliminate scenarios that are not relevant, not affected by debris, or have an insignificant contribution. The results of this screening process are provided, but not a description (i.e., justification) of the systematic approach implemented to identify relevant initiating events and how scenarios are eliminated.
- a. Please describe in detail the process leading to the identification of relevant internal initiating events (e.g., LOCA, open safety relief valve, water hammer-induced
LOCAs, non-piping LOCAs). Please include any criteria (quantitative or qualitative) used in the process for screening (i.e., eliminating) any initiating events or scenarios.
- b. Please describe in more detail how the high-likelihood scenarios were determined and how the change in risk associated with low likelihood scenarios were determined for this application. Please include a summary of the process used to make these determinations.
- c. Please describe in detail the systematic process applied to evaluate the impact of secondary side breaks. Please include a summary of how and why these breaks were screened in or out.
- d. Please explain which secondary side breaks were screened from detailed analyses, and the basis for their screening.
(39) Section 2.3.1 of RG 1.174, Rev. 2, states that:
... the scope of a PRA is defined in terms of the causes of initiating events and the plant operating modes it addresses. Typical hazard groups considered in a nuclear power plant PRA include internal events, internal floods, seismic events, internal fires, high winds, external flooding, etc.
It is not apparent that the impacts of internal fire and external hazards, other than seismic, have been addressed in the submittal. These other external hazards may affect the total change in risk for this application of the PRA.
- a. Please provide a justification (e.g., qualitative arguments or bounding analyses) that demonstrates that the risk contributions from internal fire would not affect this application of the PRA.
- b. Please provide a justification (e.g., qualitative arguments or bounding analyses) that demonstrates that the risk contributions from external events other than seismic events would not affect this application of the PRA.
ML18109A115
- via email **via memo OFFICE NRR/DORL/LPL 1/PM NRR/D0RL/LPL2 1/LA NRR/DE/ESEB* NRR/DRA/APLB/TL **
NAME MMarshall KGoldstein BWittick MReisiFard DATE 04/23/2018 04/19/2018 03/27/2018 04/09/2018 OFFICE NRR/DORL/LPL2-1/BC NRR/DORL/LPL 1/PM NAME MMarkley MMarshall DATE 04/25/2018 05/01/2018