ML16014A696: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/07/2016
| issue date = 01/07/2016
| title = E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
| title = E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
| author name = Park J S
| author name = Park J
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Weaver T
| addressee name = Weaver T

Revision as of 10:50, 20 June 2019

E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp)
ML16014A696
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/07/2016
From: James Park
NRC/RGN-III/DRS/EB1
To: Thomas Weaver
Nextera Energy
References
Download: ML16014A696 (1)


Text

From: Park, Joon To: Lopez, Crystal

Subject:

FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>

Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>

Subject:

Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:

- Design Document BECH-M190-GBD

- DGC-M100 (Design Guide for Seismic Cat. I Piping System)- B31.1 Piping Code- Evaluation 462706 & WO 40297129- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)- Procedures and work instructions used to perform heavy load lift/movement in the Pump House- ACI 318 Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 From: Park, Joon To: Lopez, Crystal

Subject:

FW: Additional Documents Request for Mod/50.59 Inspection Date: Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>

Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>

Subject:

Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:

- Design Document BECH-M190-GBD

- DGC-M100 (Design Guide for Seismic Cat. I Piping System)- B31.1 Piping Code- Evaluation 462706 & WO 40297129- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)- Procedures and work instructions used to perform heavy load lift/movement in the Pump House- ACI 318 Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715