IR 05000331/2018006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006)
ML19063B433
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/04/2019
From: Dariusz Szwarc
Division Reactor Projects III
To: Dean Curtland
NextEra Energy Duane Arnold
References
Download: ML19063B433 (7)


Text

rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018006)

Dear Mr. Curtland:

The NRC has completed its end-of-cycle performance assessment of your Duane Arnold Energy Center, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018 through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Duane Arnold Energy Center during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020.

This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The enclosed inspection plan lists a triennial Design Bases Assurance Inspection (Team) in January 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me 630-829-9803 with any questions you have regarding this letter.

Sincerely,

/RA/

Dariusz Szwarc, Acting Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure:

Inspection Plan cc: Distribution via LISTSERV