November 12, 2019

SUBJECT:

DUANE ARNOLD ENERGY CENTER, UNIT 1 - INTEGRATED INSPECTION REPORT 05000331/2019003

Dear Mr. Curtland:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Duane Arnold Energy Center, Unit 1. On October 3, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects

Docket No. 05000331 License No. DPR-49

Enclosure:

As stated

Inspection Report

Docket Number:

05000331

License Number:

DPR-49

Report Number:

05000331/2019003

Enterprise Identifier: I-2019-003-0066

Licensee:

NextEra Energy Duane Arnold, LLC

Facility:

Duane Arnold Energy Center, Unit 1

Location:

Palo, Iowa 52324

Inspection Dates:

July 01, 2019 to September 30, 2019

Inspectors:

B. Bartlett, Senior Operations Engineer

J. Beavers, Senior Resident Inspector

S. Bell, Health Physicist

L. Kozak, Senior Reactor Analyst

V. Myers, Senior Health Physicist

C. Norton, Senior Resident Inspector

T. Ospino, Reactor Engineer

J. Rutkowski, Project Engineer

S. Sheldon, Project Engineer

Approved By:

Billy C. Dickson, Jr., Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Duane Arnold Energy Center, Unit 1 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Duane Arnold operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding for the following areas:
  • Safety related structures and systems on July 16 and 17, 2019

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Control rod drive system on July 17, 2019 (2)

'A' standby diesel generator air start valves on September 4, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (9 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Water pump house on July 18, 2019
(2) Administration Building First Floor Fire Zone 20-A and 20-C on July 24, 2019
(3) Reactor Building Elevation 757 Fire Zone 2-F and 2-K on July 24, 2019
(4) Reactor Building Elevation 757 North Fire Zone 8-A on July 24, 2019
(5) Turbine Building Elevation 757 South Fire Zone 8-D and 8-E on July 24, 2019
(6) Turbine Building Elevation 757 North Fire Zone 8-A on July 24, 2019
(7) Turbine Building Elevation 780 Fire Zone 9-A, 9-B, and 9-C on July 24, 2019
(8) Control Room Complex Elevation 786 Fire Zone 12-A on July 23, 2019
(9) Control Room Heating, Ventilation, and Air Conditioning Elevation 800 Fire Zone 12-B on July 23, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during control rod sequence exchange on July 27, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator re-qualification activity on September 10, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1)

'B' standby diesel generator ventilation fan exhaust damper on July 11, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1)

'C' river water supply pump on July 15, 2019

(2) Diesel fire pump on July 26, 2019
(3) Transformer XR1 supply breaker preventative maintenance on August 5, 2019
(4) Well water flow recorder replacement on August 7, 2019 (5)

'B' standby diesel generator emergent fuel leak repair on August 13, 2019

(6) Backup instrument air compressor, 1K1, preventive maintenance on August 28, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (7 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1)

'B' standby diesel generator exhaust damper operator failed on July 8, 2019 (2)

'C' river water supply pump on July 11, 2019

(3) Minimum critical power ratio error on July 31, 2019
(4) Loss of Control Room alarm horn on July 31, 2019 (5)

'A' standby diesel generator missing turbo charger bolt on August 16, 2019 (6)

'A' standby diesel generator starting air check valve, V-32-43, failed surveillance on September 4, 2019

(7) A control building chiller trouble on September 25, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post maintenance tests:

(1)

'B' standby diesel generator ventilation fan exhaust damper post maintenance test on July 11, 2019

(2) Diesel fire pump post maintenance test on July 30, 2019 (3)

'C' river water supply pump post maintenance test on July 23, 2019 (4)

'B' standby diesel generator post maintenance test following fuel leak repair on August 14, 2019

(5) Backup instrument air compressor, 1K1, post maintenance test on August 28, 2019 (6)

'A' standby diesel generator air start check valve on September 20, 2019

(7) KAMAN 6 on September 30, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)

'A' river water supply and screen wash system vibration measurement and operability test on July 11, 2019

(2) Portions of the Control Room operations associated with the main steam isolation valve functional test on July 29, 2019
(3) Remote shutdown panel surveillance test on September 10, 2019 (4)

'A' standby diesel generator air compressor and air start check valve tests on September 3, 2019

Inservice Testing (IP Section 03.01) (3 Samples)

(1) In field activities associated with low pressure coolant injection operability test on August 14, 2019
(2) In field activities associated with the A standby diesel generator air compressor and air start check valve tests on September 3, 2019
(3) Portions of the Control Room operations associated with the high pressure coolant injection system operability test on July 16, 2019

FLEX Testing (IP Section 03.02) (1 Sample)

(1) Flex 120 volt portable diesel generators functional and performance tests on September 24, 2019

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Emergency response tabletop drill on August 7,

RADIATION SAFETY

71124.07 - Radiological Environmental Monitoring Program

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation.

(1) The inspectors reviewed the following:

Walkdowns, Calibrations, and Maintenance Record Review

  • Air sampling station; D-3
  • Air sampling station; D-4
  • Air sampling station; D-5a
  • Environmental dosimeter; D-3
  • Environmental dosimeter; D-4
  • Environmental dosimeter; D-5a

Environmental Sample Collections and Preparation Observation

  • Milk sampling location; D-110
  • Milk sampling location; D-138
  • Airborne particulate and iodine; D-3

Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement

  • Missed milk sample; 01/09/2018
  • Missed air particulate sample; 07/20/2018
  • Low sample volume for air particulate and iodine sample; 06/02/2017

Sampling Program for the Potential of Licensed Material Entering Groundwater

  • Condensate Storage Tanks
  • Reactor Building
  • Turbine Building

Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated the licensees voluntary groundwater protection initiative.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2018 to June 30, 2019)

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) Unit 1 (July 1, 2018 to June 30, 2019)

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) Unit 1 (July 1, 2018 to June 30, 2019)

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for reactor water cleanup pumps seal leaks for trends that might be indicative of a more significant safety issue on August 16, 2019

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) The occurrence of numerous seemingly unrelated Control Room alarm issues that began in May 2019, was reviewed between August 6 and August 23, 2019

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) Loss of feed water trip and licensee's response on August 1, 2019

Personnel Performance (IP Section 03.03) (1 Sample)

Pump House Fire AOP Entry Following Maintenance on August 1, 2019

(1) The inspectors evaluated pump house fire and the licensee's response on August 1,

INSPECTION RESULTS

Observation: Integrated Control Room Annunciator Issues 71152 The licensee documented numerous control room annunciator issues beginning in May 2019 for the 1C05B panel alarms. The initial issue was a failure of the annunciator horn to silence.

As part of the trouble shooting, all the alarm cards on 1C05B were removed and re-seated.

Subsequent issues included failure of some 1C05B alarms to annunciate when tested and 1C05B alarm power supply fuses blowing. These were all addressed as single issues and corrected individually.

Early in August 2016, the licensee wrote a condition report to address the aggregate 1C05B annunciator issue. The licensee determined that the alarm cards were not fully seated during the trouble shooting for failure of the annunciator horn to silence in May 2019. After re-seating the alarm cards, 1C05B annunciator issues ceased.

Observation: Corrective Action Program for Reactor Water Cleanup Pumps Seal Leaks 71152 The inspectors reviewed the licensee's problem identification and resolution activities associated with the reactor water coolant pump seal leaks over the past six months. The licensees corrective action program documented alternating and sequential mechanical seal failures on both pumps. The maintenance efforts resulted in a mixed success as A pump was returned to service with no leakage. The B pump was returned to service with nearly 300 drops per minute. This leakage, however, was well below the technical specifications limit.

The inspectors noted that continuous monitoring of reactor coolant conductivity as well as providing continuous purification of recirculation flow has been maintained during this inspection period.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

  • On October 3, 2019, the inspectors presented the integrated inspection results to Mr. D. Curtland, Director of Site Operations, and other members of the licensee staff.
  • On August 15, 2019, the inspectors presented the Radiation Protection Baseline Inspection results to Mr. M. Davis, Licensing Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Engineering

Evaluations

Flex-Flood MSA

Mitigating Srategies Assessment for Flooding Hazard

Reevaluation

11/01/2016

Miscellaneous

UFSAR/DAEC - 1

Section 3.4.1

Flood Protection

UFSAR/DAEC-1

Section 2.4

Hydrologic Engineering

Procedures

AOP 902

Flood

71111.04Q Corrective Action

Documents

Configuration Control R1-Clearance 2401-V32-043-01

Drawings

BECH-M132<1>

Diesel Generator System

BECH-M132<1>

PI&D Diesel Generator

Procedures

OI 255A2

Control Rod Drive System Valve Lineup

OI 255A3

Control Rod Drive System HCU Valve Lineup

STP 3.8.1-11A

'A' Standby Diesel Generator Air Compressor and Air Check

Valve Tests

71111.05Q Procedures

PFP-PH-757

Pre-fire Plan Pump House

71111.11Q Miscellaneous

Reactivity Management Plan Plant Down Power Sequence

Exchange

07/26/2019

Scenario ESG 2019D-01E Evaluated Scenario

Procedures

IPOP-3

Power Operations

160

71111.12

Work Orders

40673592

Standby Diesel Generator Exhaust Damper Operator Failed

71111.13

Corrective Action

Documents

1-2699-0-D-E1101; Schematic-36V Breaker GB SW5980

20630

'C' River Water Supply Pump 1P117C

21822

Injector Push Tubes Damaged due to Vendor Maladjustment 0

220761

1P117C Vibration Above Alert Limit

Condition Report

2324122

Fuel Leak on Cylinder 2 Fuel Head Drain Connection

08/12/2019

Engineering

Changes

291019

Rec-FR4414G

Procedures

STP NS 190101

Standby Service Air Compressor (1K1) Operability Test

Work Orders

40585931

FR4414G Replace Recorder Per EC

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40593711-01

Braze New Fitting on #2 CS Clean Fuel Oil Drain Header

40622298

1P-49-E Annual Engine Inspection with Vendor

40625584

Backup Instrument Air Compressor

08/28/2019

40626684

CB5980; SF6 Breaker Inspection

40630194

Backup Instrument Air Compressor

08/28/2019

40630701

Intercooler 1E-241 Automatic Drain Trap

08/27/2019

40630702

Aftercooler 1E-242 Automatic Drain Trap

08/27/2019

40673886

'C" River Water Supply Pump

71111.15

Corrective Action

Documents

2307849

'A' Rod Block Monitor Anomalous Behavior

2307896

'B' Rod Block Monitor Anomalous Behavior

20205

'B' Standby Diesel Exhaust Damper Operator Failed

22707

Missing bolt on Turbo Charger Inlet

22820

Identified Legacy MCPR Error

22883

Loss of 1C05 Alarms

22883

Loss of 1C05 Alarms

Condition Report

2635

'A' Standby Diesel Generator Starting Air Check Valve,

V-32-43 Failed Surveillance

Drawings

BECH-M132<1>

Diesel Generator System

Procedures

AOP 302.2

Loss of Alarm Panel Power

STP 3.8.1-11A

'A' Standby Diesel Generator Air Compressor and Air Start

Check Valves Tests

71111.19

Corrective Action

Documents

GMP-TEST-60; 'B' Standby Diesel Generator 1G-21 Room

Heating Ventilation, and Air ConditioningTest

2328178

Unable to Calibrate KAMAN 6 per Surveillance Test

Procedure

2328807

1C26A(B-5) 'A' Chiller 1V-CH-1A Trouble Activated

2328927

1C-330B K-6 Microcomputer Not Updating to PPC

NS13B009

Diesel Driven Fire Pump Functional Tests and Fuel Oil

Supply Verification

Miscellaneous

Work Request

40593711-01

Braze New Fitting on #2 CS Clean Fuel Oil Drain Header

Procedures

Operating

Instruction-324

Standby Diesel Generator System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Operating

Instruction-324

Standby Diesel Generator System

26

STP 3.7.5-01A

'A' Control Building Chiller Operability

STP 3.8.1-11A

Standby Diesel Generator Air Compressor and Air Start

Check Valve Test

STP NS 190101

Standby Service Air Compressor (1K1) Operability Test

STP NS340003

Reactor Building Monitor Flow Test Dated 09-16-2019

STP NS340003

Reactor Building Flow Monitor Calibration Test Dated

09/25/2019

STP NS340003

Reactor Building Flow Monitor Calibration

Work Orders

40593711-01

Braze New Fitting on #2 CS Clean Fuel Oil Drain Header

40622298

1P049-E; Annual Engine Inspection with Vendor

40625584

Backup Instrument Air Compressor

08/28/2019

40630194

Backup Instrument Air Compressor

08/28/2019

40630701

Intercooler 1E-241 Automatic Drain Trap

08/27/2019

40630702

Aftercooler 1E-242 Automatic Drain Trap

08/27/2019

40673592

Standby Diesel Exhaust Damper Operator Failed

40682200-01

Air Receiver 1T-115A Oulet Check Valve

09/17/2019

40682200-01

Air Receiver 1t-115A Outlet Check Valve

09/18/2019

71111.22

Corrective Action

Documents

Technical Specifications (and Bases); Amendment 25

Drawings

BECH-M132<1>

Diesel Generator System

Procedures

STP 3.3.1.1-17

Main Steam Isolation Valve Functional Test

STP 3.3.3.2-15

Remote Shutdown Cooling Residual Heat Removal and

Residual Heat Removal Service Water Components

STP 3.5.1-05

High Pressure Coolant Injection Operability Test

STP 3.5.1-11B

Low Pressure Coolant Injection System Operability Test and

Comprehensive Pump Test

STP 3.7.4-05B

Standby Filter Unit 'B' Operation with Headers

STP 3.8.1-11A

Standby Diesel Generator Air Compressor and Air Start

Check Valve Tests

STP NS 490003B

'B' Residual Heat Removal System Leakage Walk Down

Inspection

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

STP NS100203A

'A' River Water Supply and Screen Wash System Vibration

Measurement and Operability Test

STP NS240501

FLEX 120V Portable Diesel Generator Functional and

Performance Test for 1G102A/GEN; 1G102B/GEN;

1G102C/GEN

71114.06

Corrective Action

Documents

CRS Tabletop 08-07-19

71124.07

Calibration

Records

Meteorological Tower Calibration

07/24/2019

Meteorological Tower Calibration

04/24/2019

Environmental Air Sampler Calibration Records

2018

Corrective Action

Documents

AR 02251132

Level 1 Assessment - 2017 REMP TLD Assessment

2/23/2018

AR 02252731

Met Tower 50M Wind Speed Sensor Failure

03/06/2018

AR 02253793

Level 1 Assessment Cs-137 in Soil Samples

03/12/2018

AR 02308312

REMP Air Sampler Power Failure at D-11 Toddville

04/01/2019

AR02324434

GWPP Extraction Well Flow Meter Failure

08/14/2019

Miscellaneous

2018 Annual Radiological Environmental Operating Report

05/14/2019

Quality Control for Radiological Environmental Records

05/30/2019

Environmental Air Sampling Station Logs

2018

Offsite Dose Assessment Manual

38-40

2017 Annual Radiological Environmental Operating Report

05/11/2018

Procedures

ESP 4.3.1.15

Milk Sampling

ESP 4.5

Statistical Comparison of TLDs for Direct Radiation Impact

ESP 4.9

Groundwater Remediation

STP NS790710

Radioactive Liquid Release from Clean System

Self-Assessments

NEI Audit of Groundwater Protection Program

2/28/2017

NRC Pre-Inspection Self-Assessment for IP 71124.06 and

71124.07

07/09/2019

Work Orders

WO 40631719-01

Meteorological System Channel Checks

05/01/2019

71151

Corrective Action

Documents

Monthly MSP/Maintenance Rule Data Entry Sheets;

July 1, 2018 through June 30, 2019

71152

Corrective Action

Documents

Condition Report

23114966

1C05B Annunciators Did Not Respond As Expected During

Tests

05/20/2019

Condition Report

1C05 Alarms Disabled for Approximately 1-Hour

05/09/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2313876

Condition Report

2314063

1C05B (D-2) Failed to Activate During Testing

05/10/2019

Condition Report

2314063

IC05B (D-2) Failed to Activate During Testing

05/10/2019

Condition Report

2317622

1C05B (C-4) Failed to Annunciate During Surveillance Test

Procedure 3.3.1.1-04

06/11/2019

Condition Report

2319657

1C05B (C-1) and (B-5) Annunciators Not Lighting When

Tested

06/29/2019

Condition Report

2322883

Loss of 1C05 Alarms Lights and Horn

07/30/2019

Condition Report

2323487

1C05B A-7 Point Card

08/05/2019

Condition Report

2323664

1C05B Annunciator Panel Troubleshooting

08/07/2019

Condition Report

232792

'B' Reactor Water Cleanup Pump Seal Leak

Condition Report

293282

'A' Reactor Water Cleanup Pump Seal Leak

Condition Report

294880

'B' Reactor Water Cleanup Pump Shaft Seal Leak

Condition Report

2302758

'A' Reactor Water Cleanup Pump Loose Impeller

Work Orders

40582408

'B' Rector Water Cleanup Pump Lube Coupling

40642375

'B' Reactor Water Cleanup Pump Shaft Seal Leak

71153

Corrective Action

Documents

BECH-

E108<004A>

Steam and Condensate System

BECH-M104<2>

Feedwater Heaters 1E003A, 4A, 5A, 6A

Miscellaneous

C07B Moisture Separator Reheater Second Stage Drain

Tanks 1T-92A to 1T-92B Pressure Differential High

Operating Shift Logs May 1, 2019

Operating Shift White Paper on Moisture Separator Drain

Tank High dp

Event Notification

Loss of Feed Water Trip

04/22/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

  1. 54012

Procedures

AOP 255.2

Power/Reactivity Abnormal Change

0