MONTHYEARML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) ML19290E5482019-10-17017 October 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000331/2020010 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) ML19099A3522019-04-0909 April 2019 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Duane Arnold Energy Center IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) ML18061A1502018-03-0202 March 2018 Information Request for the Cyber-Security Full Implementation of Inspection, Notification to Perform Inspection 05000331/2018414 (DRS-G.Hausman) ML17313B1882017-11-0909 November 2017 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000331/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000331/2017005) ML17172A3872017-06-20020 June 2017 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Duane Arnold Energy Center IR 05000331/20160062017-03-0101 March 2017 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016006) ML17047A6652017-02-16016 February 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000331/2017008 ML17010A0502017-01-0909 January 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center IR 05000331/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2016005) IR 05000331/20150062016-03-0202 March 2016 Annual Assessment Letter for Duane Arnold Energy Center (Inspection Report 05000331/2015006) IR 05000331/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Duane Arnold Energy Center (Report 05000331/2015005) IR 05000331/20140012015-03-0404 March 2015 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2014001) ML15057A3472015-02-26026 February 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Duane Arnold Energy Center ML14245A2772014-09-0202 September 2014 Mid-Cycle Assessment Letter for Duane Arnold Energy Center ML14148A4002014-05-27027 May 2014 Notification of NRC Supplemental Inspection (95002) and Request for Information IR 05000331/20130012014-03-0404 March 2014 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2013001) ML13246A2222013-09-0303 September 2013 2013 Duane Arnold Energy Center Mid-Cycle Letter Combined ML13176A0812013-06-24024 June 2013 Ltr 6/24/13 Duane Arnold MOD 50.59 Request for Information IR 05000331/20120012013-03-0404 March 2013 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331/2012001) ML12249A4092012-09-0404 September 2012 Mid-Cycle Assessment Letter for Duane Arnold Energy Center Unit 1 IR 05000331/20110072012-03-0505 March 2012 Annual Assessment Letter for Duane Arnold Energy Center, Unit 1 (Report 05000331-11-007) IR 05000331/20110062011-09-0101 September 2011 Mid-Cycle Letter for Duane Arnold Energy Center; 05000331-11-006 IR 05000331/20110012011-03-0404 March 2011 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331-11-001) ML1024400522010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center IR 05000331/20100012010-03-0303 March 2010 Duane Arnold Energy Center EOC Annual Assessment Letter (Report 05000331-10-001) ML0924402492009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000331/20090012009-03-0404 March 2009 Annual Assessment Letter - Duane Arnold (05000331-09-001) ML0824602612008-09-0202 September 2008 Duane Arnold - Mid Cycle Performance Review and Inspection Plan IR 05000331/20080012008-03-0303 March 2008 IR 05000331-08-001, Duane Arnold Energy Center EOC Annual Assessment Report Letter ML0735403922007-12-19019 December 2007 Change to Inspection Plan 1/1/08 - 12/31/08 NG-07-0878, Second 10-Year Containment Inspection Plan2007-11-16016 November 2007 Second 10-Year Containment Inspection Plan IR 05000331/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000331-07-001) ML0624303352006-08-31031 August 2006 8/31/06 Duane Arnold Station-Mid-Cycle Performance Review and Inspection Plan IR 05000331/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000331/2006001) ML0524204262005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center ML0506203742005-03-0202 March 2005 Annual Assessment Letter - Duane Arnold Energy Center ML0424504992004-08-30030 August 2004 Mid-Cycle Performance Review and Inspection Plan for Physical Protection - Duane Arnold Energy Center IR 05000331/20040012004-03-0404 March 2004 Annual Assessment Letter, Duane Arnold (IR 05000331-04-001) ML0324001542003-08-27027 August 2003 IR 05000331-04-001 - Mid-Cycle Assessment Letter ML0224001502002-08-23023 August 2002 Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center (August 23, 2002) IR 05000331/20020012002-03-0404 March 2002 Annual Assessment Letter - Duane Arnold Energy Center (Report 50-331/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] |
Text
September 1, 2020
SUBJECT:
UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2020005)
Dear Mr. Curtland:
The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9587 with any questions you have regarding this letter.
Sincerely,
/RA/
April Nguyen, Acting Chief Branch 2 Division of Reactor Projects Docket Nos. 50-331;72-032 License No. DPR-49 Enclosure(s):
Inspection Plan cc: Distribution via LISTSERV Letter to Dean Curtland from April Nguyen dated September 1, 2020.
SUBJECT: UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2020005)
DISTRIBUTION:
Jessie Quichocho Elise Burket RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML20244A330 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME RRuiz:wc via email ANguyen: via email DATE 8/28/2020 8/28/2020 OFFICIAL RECORD COPY
IP 22 Inspection Activity Plan Report 07200032 - Duane Arnold (ISFSI)
07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Pad Inspection 3 1 01/18/2021 01/22/2021 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 1 02/01/2021 02/05/2021 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations ISFSI Pad Construction Inspection 3 1 02/15/2021 02/17/2021 IP 60853 000999 On-Site Fabrication Of Components And Construction On An ISFSI 1 03/15/2021 03/17/2021 IP 60853 000999 On-Site Fabrication Of Components And Construction On An ISFSI 1 04/12/2021 04/14/2021 IP 60853 000999 On-Site Fabrication Of Components And Construction On An ISFSI ISFSI Security Inspection 1 1 04/12/2021 04/14/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations ISFSI Cask Loading Inspection 2 1 11/08/2021 11/12/2021 IP 60855 001001 Operation Of An ISFSI ISFSI Cask Loading Inspection 2 1 03/14/2022 03/18/2022 IP 60855 001001 Operation Of An ISFSI 1 06/06/2022 06/10/2022 IP 60855 001001 Operation Of An ISFSI This report does not include INPO and OUTAGE activities. Page 1 of 2 This report shows only on-site and announced inspection procedures.
8/31/2020 1:21:51 PM
IP 22 Inspection Activity Plan Report Duane Arnold 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Cask Loading Inspection 3Q2020 2 1 08/31/2020 09/04/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Security Baseline Inspection 1 1 10/26/2020 10/30/2020 IP 71130.02 000734 Access Control Emergency Preparedness Baseline Inspection / Performance Indicator Verification 1 1 04/12/2021 04/16/2021 IP 71114.02 000717 Alert and Notification System Testing 1 04/12/2021 04/16/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 04/12/2021 04/16/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 04/12/2021 04/16/2021 IP 71151 001397 Performance Indicator Verification Force-On-Force Planning and Exercise Weeks - DA 6 1 11/15/2021 11/19/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 12/13/2021 12/17/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing This report does not include INPO and OUTAGE activities. Page 2 of 2 This report shows only on-site and announced inspection procedures.
8/31/2020 1:21:51 PM