Text
From:
Park, Joon To:
Lopez, Crystal
Subject:
FW: Additional Documents Request for Mod/50.59 Inspection Date:
Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
Subject:
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
- Design Document BECH-M190-GBD
- DGC-M100 (Design Guide for Seismic Cat. I Piping System)
- B31.1 Piping Code
- Evaluation 462706 & WO 40297129
- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
- Procedures and work instructions used to perform heavy load lift/movement in the Pump House
- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696
From:
Park, Joon To:
Lopez, Crystal
Subject:
FW: Additional Documents Request for Mod/50.59 Inspection Date:
Friday, January 08, 2016 9:16:03 AM From: Park, Joon Sent: Thursday, January 07, 2016 2:56 PM To: 'Tracy.Weaver@nexteraenergy.com' <Tracy.Weaver@nexteraenergy.com>
Cc: Shaikh, Atif <Atif.Shaikh@nrc.gov>
Subject:
Additional Documents Request for Mod/50.59 Inspection Hello Tracy, I have the following additional documents to request as part of the Mod/50.59 inspection:
- Design Document BECH-M190-GBD
- DGC-M100 (Design Guide for Seismic Cat. I Piping System)
- B31.1 Piping Code
- Evaluation 462706 & WO 40297129
- Pump House Structural Drawings showing plans, sections, and details (associated with EC 281806 Rev. 0)
- Procedures and work instructions used to perform heavy load lift/movement in the Pump House
- Engineering Change 278809 If possible, I request that these documents be made available by Monday 1/11/16 when the team arrives on site.
Thank you, Joon S. Park Reactor Inspector NRC/Region III Joon.Park@nrc.gov Office: 630-829-9715 ADAMS Accession Number ML16014A696