ML17290A387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/26/1993
| issue date = 05/26/1993
| title = Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description.
| title = Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description.
| author name = PARRISH J V
| author name = Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:39, 18 June 2019

Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description.
ML17290A387
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/26/1993
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17290A388 List:
References
GO2-93-124, NUDOCS 9306070343
Download: ML17290A387 (5)


Text

ACCELERA D DOCUMENT DIST UTION SYSTEM REGULA RY INFORMATION DISTRIBUTI

.-SYSTEM (RIDS)ACCESSION NBR:9306070343 DOC.DATE: 93/05/26 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 16 to WPPSS-QA-004,"Operational QA Program Description." DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution DOCKET N 05000397 NOTES: RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J COPIES LTTR ENCL 1 1 2 2 RECIPIENT ID CODE/NAME PDV PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DORS/OTSB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 EXTERNAL: NRC PDR N~R/DEIL g,/K'6 1 1 1 1 1 1 1 0 1 1 NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SRXB OC LFMB REG I'GE Ol NSIC 1 1 1 1 1 1 1 0 1 1 1 1 NOTE TO,ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL~B-WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bosc968~3000Geotge Wasbfngton Way~Rtcbland, Wasbtngton 993524968~(509)372-5MO May 26, 1993 G02-93-124 Docket No.50-397 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 REVISION 16 TO OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

Reference:

Letter G02-93-107, dated May 10, 1993, J.V.Parrish (SS)to NRC Document Control Desk,"Request for Amendment to Technical Specification 6.0, Administrative Controls" The Washington Public Power Supply System, in accordance with 10 CFR 50.54 (a)(3), is proposing changes to the U.S.Nuclear Regulatory Commission (NRC)approved topical report"Operational Quality Assurance Program Description (WPPSS-QA-004)" and hereby requests NRC approval.This proposed revision will result in a reduction of commitments and revision to the technical specifications (see reference).

It will not result in a reduction in QA/QC independence.

This revision to the OQAPD is necessary to update the Organization (specifically the QA portion)and Qualification Requirements (Appendix I)sections of the manual.Vertical lines have been placed in the right hand margin to identify text changes, additions, and deletions.

The purpose of this change is to provide more in-depth coverage and improved coordiriation of reviews by quality assurance staff.In addition, the changes are intended to provide greater effectiveness in identifying opportunities for improvement.

We believe the proposed revision will result in a reduction of previous commitments, since the audit function will be reporting to management one level lower in the QA organization.

This change does not lessen the effectiveness of the QA Program.Additional resources will be clearly designated to support the Appendix B Auditing Criteria.The reporting chain for audit personnel maintains a clear separation from those responsible for the operation of the plant.-p 03003.2 9306070343 930526 PDR ADOCK 05000397(p PDR'

~I H hVp Page Two REVISION 16 TO OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION

(%PPSS-QA-004)

As indicated by the reference, the proposed revision will also result in a revision to the Technical Specifications, since the ISEG function (Nuclear Safety Assurance) is being assigned to the Quality Assessments organization.

That revision will not result in a reduction in QA/QC independence.

Should the NRC approve the technical specification changes during the 60 days following this letter, the Supply System intends to implement the changes to the OQAPD in accordance, with 10 CFR 50.54 (a)(3)(iv) if no response to this request is received from the NRC (i.e., 60 days after this letter).If approval of the technical specification changes is received after the 60 day period, we will implement the changes in the OQAPD as soon as the technical specification changes are approved.Should you have any questions regarding this submittal, please contact Gerald C.Sorensen at (509)377-4027.Sincerely,.V.Parrish, (Mail Drop 1023)Assistant Managing Director, Operations JVP:b1c

Attachment:

Revision 16 to Operational Quality Assurance Program Description CC: RJ Barr, NRC Resident (901A)JP Clifford, NRC JB Martin, NRC RV NS Reynolds, W&S DL Williams, BPA I